• Title/Summary/Keyword: 공공건축물

Search Result 182, Processing Time 0.027 seconds

Strategic Management of the Policy for Seoul City's Hangang Renaissance (네트워크 분석적 의사결정방법(ANP)을 이용한 서울시 한강르네상스 정책의 전략적 관리방안)

  • Cho, Se-Hwan;Jeong, Gwang-Seop;Kim, Sang-Won;Won, Jai-Mu
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.1
    • /
    • pp.1-10
    • /
    • 2011
  • This study was performed for the purpose of reviewing the strategic management direction and ideas of the policy for Seoul City's Hangang Renaissance. In order to accomplish this, levels were established for each step of the policy and the policy priority by level was derived. The policy priority by level was analyzed by a decision making model through the Analytic Network Process(ANP) and the priority would be the standard to judge the order of priority. The analysis results showed that there was not a big difference between the priorities of two basic concepts: restoration and creation. The fourth level, detail plan of the third level, showed priority that development by type for waterside city in case of reorganizing city space and diversification of land utilization, utilization of riverside space in water front town for public and composit purpose, establishment of comprehensive plan on constructions in case of improving the landscape of Hangang and unified design plan rose to important element in case of forming Hangang park with the me. Based on the results of priority analysis, we would like to propose for the direction about the policy on Hangang Renaissance project, the policies forming Hangang Park with theme through unified design plan and reorganizing city space have to be proceed preferentially and connected with other plans.

Study on the Ship Fire Analysis According to Explosion Hazard (폭발의 위험성에 의한 선박화재의 사고사례 분석)

  • You, Jisun;Chung, Yeong-Jin
    • Fire Science and Engineering
    • /
    • v.29 no.1
    • /
    • pp.80-86
    • /
    • 2015
  • This study analyzed recent cases of ship fires explosions and investigated their problems and coping plans. Through analysis on the statistical figures, it was found that our nation's situations of maritime accidents by kind during the period of 2009~2013 showed the ratios of ship accidents caused by fires explosions was the highest in 2012 with 7.58% (55 cases) followed by year 2009 with 3.39% (34 cases), year 2010 with 3.39% (25 cases), year 2011 with 6.03% (57 cases) and year 2013 with 6.74% (43 cases), which indicates a steady increase in the number of ship accidents. Majority of reasons for ship fires explosions were lack of safety awareness. Since those accidents happen on the sea, fires, once they happen, tend to get serious due to absence of on board & nearby fire extinguishing facilities, public fire service's uneasy access to them and great influences of natural factors such as wind and etc. Ship fires explosions are special cases unlike what happens to general edifices. So, their coping plans should focus on preventive measures since the damages those cases bring about can be detrimental. For this reason, it's necessary to research precise evacuation plans, develop ship structure & materials reinforcing fire resistance to secure more time for evacuation and enhance people's safety awareness by implementing thorough safety training.

CM at Risk Case Study on Guaranteed Maximum Price Contract - Focused on Cases for USA - (책임형 CM 발주방식의 최대공사비보증계약 사례연구 - 미국 공공발주 프로젝트 사례 중심 -)

  • Jeong, Jinhak;Han, Jonghoon;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.22-30
    • /
    • 2019
  • The purpose of this study is to derive basic data of the Guaranteed Maximum Price(GMP) process and to present specimens that can be used at the time of execution of CM at Risk project in South Korea. CM at Risk project is issued in South Korea, but the actual data is lack. On the other hand, CM at Risk project is universalized and the market of the CM at Risk is steadily growing. Because of that, in this study, The United States cases was selected as a sample. GMP consists of CM's fee, CM contingency, project direct cost, project indirect cost, allowance. GMP negotiations are performed before the end of design completion, and after 3 rounds of estimation comparison, preliminary GMP is confirmed. GMP can be multiple contract and it is useful for Procurement of long lead materials and early construction. If the actual cost is lower than expected GMP, sharing of the saving is an option since the conflict of interests between the client and the contractor can occur.

Developing the District Unit Plan Simulation using Procedural Modeling (절차적 모델링을 활용한 지구단위계획 시뮬레이션 개발)

  • Jun, Jin Hwan;Kim, Chung Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.3
    • /
    • pp.546-559
    • /
    • 2021
  • This research aimed to develop the district unit plan simulation using procedural modeling based on shape grammar. For this, Esri's CityEngine 2020.0 was selected as a main development tool, and Inside Commercial Area in Bangi-dong, Songpa-gu, Seoul as the research site where about 25% of the total area was developed over the past five years. Specifically, the research developed the simulation through the following three phases of Data-Information-Knowledge after selecting necessary parameters. In the Data phase, 2 and 3 dimensional data were obtained by utilizing data sharing platforms. In the next Information phase, the acquired data were generated into various procedural models according to the shape grammar, and the 2D and 3D layers were then integrated using relevant applications. In the final Knowledge phase, three-dimensional spatial analysis and storytelling contents were produced based on the integrated layer. As a result, the research suggests the following three implications for the simulation development. First, data accuracy and improvement of sharing platforms are needed in order to effectively carry out the simulation development. Second, the guidelines for district unit plans could be utilized and developed into shape grammar for procedural modeling. Third, procedural modeling is expected to be used as an alternative tool for communication and information delivery.

Research on Mobile Wheelchair Lift Design (이동식 휠체어 리프트 디자인 연구)

  • 이명기
    • Archives of design research
    • /
    • v.15 no.4
    • /
    • pp.275-284
    • /
    • 2002
  • To improve the social and economic position of the disabled people and secure their human rights, an integrated society should be buill. To build such a society, an adequate access should be provided to the movement or in using buildings or facilities. The inconveniences from social life on the part of the disabled people might not result from their impairment or disability, but from physical and social barriers in the environment surrounding them. Therefore, it is necessary to reconstruct entire systems of the society as a disabled people-friendly structure in order to remove those barriers, make them stand their own feet in our communities and freely participate in the social activities. This will eventually lead to build a society in which all people including the disabled people can use those facilities in a more convenient way. It is almost impossible for the disabled people to safely and conveniently access to and use facilities and equipments and freely move to their desired places, without any help from others in Korea. Even though, there are currently many disabled people-related convenience facilities, they have been independently built without a connection with other facilities and buildings, thus not greatly useful. Even when convenience facilities have been built, mostly they are superficially set up; therefore, in many cases, the disabled peOple cannot use those facilities. In this. research, I tried a new concept of mobile wheelchair lift design, which the disabled people can operate without restrictions, when using the public facilities. The key to this research was to develop the existing import-oriented simple functional products to a new system with functional safety and high quality orientation. Also, this research aimed at bringing an. import substitution effect, as well as preempting the mobile wheelchair lift market by advancing into overseas markets through application of new image designs in the field of disabled people aid equipments.

  • PDF

Landscape Assessment and Improvement of the View Area by Selecting the Landscape Control Point (조망점 선정을 통한 대상지의 경관가치 평가 및 개선방안)

  • Kim, Jin-Hyo;Lee, Hyun-Taek;Ra, Jung-Hwa;Cho, Hyun-Ju;SaGong, Jung-Hee
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.5
    • /
    • pp.19-32
    • /
    • 2012
  • The purpose of this study is to quantitatively measure the view target and the view area through the selection of landscape control point by selecting Jimyeong-dong Dong-gu and Yeongyeong-dong Buk-gu Daegu, which are planned as the large scale housing complex development area, as the target places. It is very meaningful that from the simulation based on this measurement, the improvement methods are attempted to be suggested at the project level. The results of this study are as follows. First, the total number of viewing targets derived from the literature analysis for the selection of the viewing targets was 24, and finally derived main viewing targets were 4 places. Second, the total number of selection criteria of the derived landscape control point was 15, and these were re-categorized as prospect, accessibility and publicness according to the common property. The preliminary LCPs were selected by measuring the publicness and accessibility, and because of the said measurement, a total of 43 preliminary LCPs were selected. The final LCPs were selected by estimating the prospect of the selected preliminary LCPs, and as a result of estimation, a total of 29 final LCPs were selected. Finally, the total number of evaluation indicators derived from literature analysis was 26. Because of the valuation by the landscape control point, it was found that the 2 view areas were the I grade, 3 areas were II grade and 3 areas were the V grade, the lowest grade among 29 view areas. From the analysis on problems for the improvement methods, 4 improvement-indicators including the diversity of land mosaic were selected for the view area-1 without considering the development project drawing. In addition, for the view area-2 with considering the development project drawing, the landscape as the scenery forests was well formed, and the arrangement of architectures for the security of view corridor was right angle arrangement, and their floor number was 10.

건설산업경쟁력 강화와 부실방지대책(안)

  • 한국주택협회
    • 주택과사람들
    • /
    • no.54 s.71
    • /
    • pp.185-206
    • /
    • 1996
  • 1.건설제도의 국제화와 경쟁기반 구축 $\bullet$건설산업을 기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$사후관리 등 전 분야에 걸쳐 경쟁력 있는 산업으로 육성-기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$유지관리 등 건설산업 전반에 관한 기본사항을 법제화-대규모 공사의 경우 발주자를 대신하여 건설공사의 기획$\cdot$설계$\cdot$발주$\cdot$감리$\cdot$시공관리 등 업무의 전부 또는 일부를 종합적으로 조정$\cdot$관리하는 $\lceil$건설사업관리$\rfloor$제도를 도입 $bullet$건설공사 $\lceil$현장실명제$\rfloor$도입을 통한 하도급제도의 정비-전문건설업자로부터 하도급, 위탁, 고용 등의 형태로 공사에 참여하는 현장근로자를 신고 받아 권익을 보호하고 시공책임도 부과하는 $\lceil$현장실명제$\rfloor$도입 $\bullet$공사완성보증제, 손해배상보증제도를 도입하고, 신용상태 $\cdot$시공능력에 따라 보증 요율 등을 차등화 하여 부실업체를 배제 $\bullet$건설공사관련 각종 계약서와 시방서 등 제기준을 정비하여 발주자$\cdot$시공자 등 건설주체간의 역할과 책임을 명확화$\bullet$건설분쟁을 신속하고 객관적으로 조정$\cdot$중재하기 위하여 $\lceil$건설분쟁중재원$\rfloor$으로 확대 개편 2. 건설인력의 육성과 고용안정$\bullet$경쟁력 제고의 관건인 우수인력 확보를 위하여 대학교육 제도의 개선을 포함한 건설 인력 수급대책을 추진 - 대학의 건설관련 학과 정원을 2000년까지 매년 일정규모로 증원하여 고급기술 인력을 배출 현재 50$\%$에 불과한 건설관련 국가기술자격자를 2000년에 70$\%$까지 제고 - 감리 등 전문인력을 양성하고, 선진외국 감리 회사를 활용하여 국내 업계와의 경쟁을 유도 $\bullet$건설현장의 최일선에서 품질을 담당하고 있는 건설기능공의 고용안정과 복지향상을 위한 획기적인 대책을 마련 - 건설기능공의 자긍심과 사회적 책임의식을 고취하기 위해 기능공이 여러 현장을 전전하여 근무하더라도 경력관리, 공제금 등의 합산 관리가 가능하도록 $\lceil$건설 근로자 복지카드$\rfloor$제도를 도입 *$\lceil$건실시연구단$\rfloor$을 구성$\cdot$구체적인 운영방안을 수립 - 건설 업체 실정에 맞는 현장위주의 기능검정제도 도입 $\cdot$자격증이 현장에서 요구되는 기능수준과 숙련도를 제대로 반영할 수 있도록 검정방법을 현장 실기위주로 개선하고 자격검정업무도 건설협회 등의 자격 검정능력을 향상시켜 위탁$\cdot$시행하는 방안을 검토 3. 공사시행기관의 전문성과 책임성 제고 $\bullet$시장이 개방되어 건설공사가 국제적인 관행에 따라 이루어질 것에 대비하여 시행기관에 계약$\cdot$공사관리 등 전문직공무원을 집중 교육하여 양성 $\bullet$ 조달청이 대행하여 공사계약을 하는 경우라도 설계변경은 발주기관이 자체적으로 할 수 있도록 허용 $\bullet$ 기술직 공무원의 기술향상을 위하여 관련 공무원의 확충, 해외연수, 현장교육 강화 등을 지속적으로 추진 $\bullet$ 충분한 사전조사를 거쳐 사업계획을 수립하도록 $\lceil$건설공사 시행절차$\rfloor$를 규정 $\bullet$ 공사기간 3년 이상의 공사에 대하여는 최대한 계속비사업으로 편성토록 계속비제도의 운영을 활성화 4. 건설현장의 품질관리체제 구축 $\bullet$ 현장배쳐플랜트 설치를 확대하여 레미콘의 품질관리를 일원화하고 현장에서 레이콘을 배합하는 건식공법을 채택 - 현장레미콘생산시설(B/P)설치 확대로 콘크리트 하자에 대한 책임한계 일원화 유도 - 레미콘 재료인 골재$\cdot$시멘트$\cdot$물을 공장에서 혼합하여 공급하는 현행 습식배합 대신에 물만을 현장에서 혼합하는 건식 배합방식을 도입 $\bullet$철강재$\cdot$철구조물의 품질을 보증하기 위하여 일정기술을 갖춘 공장에서만 제작토록 하는$\lceil$공장인증제$\rfloor$를 도입 - 제작시설과 품질관리 등을 심사하여 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 사후관리를 일괄 책임질 수 있도록 $\lceil$시공 및 유지관리 일괄계약제도$\rfloor$를 도입 - 대형교량$\cdot$소각로$\cdot$하수처리장 등 유지관리에 전문성이 요구되는 분야부터 시범적으로 도입 $\bullet$건설자재의 표준화$\cdot$정보화사업을 조속히 추진 5. 건설업체에 대한 지원 강화 $\bullet$일부 공공사업자의 경우 관행화되어 있는 대금일부의 어음 또는 채권지급방법을 단계적으로 축소 $\bullet$매월 감독이나 감리원의 기성확인에 의하여 시공자에게 공사대금을 직접 지급토록 하는 등 대금 지급절차를 간소화 6. 민간 건축물에 대한 안전확보 $\bullet$충실한 설계가 이루어지도록 제도를 개선 - 설계도서 작성기준을 제정하고 다중이용시설에 대하여는 건축심의단계에서 구조검토 등 설계심의를 의무화 $\bullet$대형다중이용시설에 대한 감리 강화 - 감리전문회사 수준의 감리체제로 전환하고 감리대가도 공공수준으로 인상하고 적용요율대로 지도$\cdot$감독 강화

  • PDF

A Study on the Estimation Method of the Repair Rates in Finishing Materials of Domestic Office Buildings (국내 업무시설 건축 마감재의 수선율 산정 방안에 관한 연구)

  • Kim, Sun-Nam;Yoo, Hyun-Seok;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.52-63
    • /
    • 2015
  • Business facilities among domestic architectures have rapidly been constructed along with domestic economic development. It is an important facility taking the second largest proportion next to apartment buildings among current 31 building types of fire department classification of 2012 year for urban architectures. The expected service life of business facilities is 15 years, but 70% of those in urban areas have surpassed the 15 year service life as of the present 2014. Thus, the demand for urgent rehabilitation of such facilities is constantly increasing due to the aging and performance deterioration of the facilities'main finishing materials. Especially, the business facilities are being used for the lease of company office or private office, and such problems as aging and performance deterioration of the facilities could cause less competitive edge for leasing and real estate value depreciation for the O&M (Operation & Management) agent and the owner, respectively. Therefore, an effective planned rehabilitation as a preventive measure according to the standardized repair rate by the number of years after the construction is in need in order to prevent the aging and performance deterioration of the facilities(La et al. 2001). Nonetheless, domestic repair/rehabilitation standards based on the repair rate are mainly limited to apartment buildings and pubic institutions, resulting in impractical application of such standards to business facilities. It has been investigated and analyzed that annual repair rate data for each finishing material are required for examination of the applicability of the repair rate standard for the purpose of establishment of a repair plan. Hence, this study aimed at developing a repair rate computation model for finishing materials of the facilities and verifying the appropriateness of the annual repair rate for each finishing material through a case study after collecting and analyzing the repair history data of six business facilities. The results of this study are expected to contribute to the planning and implementation of more efficient repair/rehabilitation budget by preventing the waste of unpredicted repair cost and opportunity cost for the sake of the business facilities' owners and O&M agents.

A Study on The Introduction of LID Prior Consultation for Small-Scale Development Projects - Focusing on Cost-Benefit Analysis - (소규모 개발사업의 저영향개발(LID) 사전협의 제도 도입 연구 - 비용편익 분석을 중심으로 -)

  • Ji, Min-Kyu;Sagong, Hee;Joo, Yong-Jun
    • Clean Technology
    • /
    • v.26 no.2
    • /
    • pp.151-157
    • /
    • 2020
  • Rapid urbanization has elevated the risk of urban flooding due to the increase in the impervious surface, causing environmental disasters and environmental pollution problems, such as lowering the groundwater level and increasing water pollution. In Korea, low impact development (LID) techniques have been introduced to minimize these environmental impacts and maintain the water cycle soundness. However, most small-scale development projects are in blind spots because there is no legal basis for rainfall runoff management. Small-scale development projects that increase the surface runoff of rainwater are required to mandate the application of LID facilities in accordance with the polluters' responsibility principle. Therefore, it is necessary to implement a preliminary consultation system for water cycle recovery. This study focuses on the cost-benefit analysis on the application of LID techniques for small-scale development projects. The scale of nationwide small-scale development projects used for cost-benefit analysis were defined as buildings with a land area of more than 1,000 ㎡ or a total floor area of 1,500 ㎡. As a result of analyzing the cost-benefits from the installation of LID facilities, they were found to be much lower than the economic standard value of 1. This might be due to the high cost of facilities compared to the scale of the project. However, considering the overall environmental value of improving the water environment and air quality by the installation of LID facilities and the publicity of reducing the operating cost of sewage treatment facilities, the introduction of a prior consultation for small-scale development projects is inevitable. In the future, institutional and financial support from local governments is required to improve the cost-benefits with the introduction of a prior consultation for small-scale development projects.

A Study on the Planning Methods of Community Greenway in Nam-Gu, Incheon (인천광역시 남구 커뮤니티형 그린웨이 조성방안 연구)

  • Park, Suk-Hyeon;Han, Bong-Ho;Choi, Jin-Woo;Choi, Tae-Young
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.43 no.1
    • /
    • pp.16-28
    • /
    • 2015
  • This study is suggested to enlarge the green area and to connect and improve the present green areas by deriving the lines of community greenway using living areas and community spaces close to the life of residence in Nam-gu. The purpose of this paper is to suggest the method of establishing greenway for the formation of community in which the residence can grow the community spirit and love their living space much more. Land-use status, green coverage ratio, and impermeability paving ratio are investigated. The community facilities are classified. The highest is educational facility, which is 7.7%, the green facility is 1.9% and the total area of community facilities which is 21.4%. The total area of Nam-gu is divided into 31 zones in total according to the administrative districts, the mail roads and reserved land of railroad and urban development. The total 20 lines of community greenway lines are chosen and the total length of lines is 18.2km. Finally, the characteristics of community greenway lines are analysed, the characteristics of community greenway lines are overall estimated according to the land-use, the street environment and the community facility. The classification system of community greenway is established on the basis on the function and purpose of greenway, the present status of land-use and the type of community facility. Based on the field investigation, the 6 greenway types are suggested considering the interconnection. The method of establishment of community greenway is suggested according to the principle of function and purpose, the principle of land-use and the principle of use of the facilities. Furthermore, the planting methods suitable to each greenway type are suggested in the building planting case of wall planting, roof planting, veranda planting, etc., and in the complex planting of parks, schools, roads, parking lots and other small areas.