• 제목/요약/키워드: 골조공사

검색결과 134건 처리시간 0.021초

초고층 골조공사의 통합 장비 운영을 위한 장비 간의 간섭요소 분석 (Analysis of Interference Elements for the Integrated Equipment Operation in Tall Building Construction)

  • 이동윤;임현수;김백중;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.173-175
    • /
    • 2013
  • In tall building construction, the equipment operation plans have an effect on productivity. Equipment, used in tall building construction, has operating plans of each it and restrictively operate owing to the first placed equipment operation. Therefore the interference of equipment was occur frequently. As it, the productivity is less effective and the construction delay occurs. This research was analysis the interference elements between the equipment for constructing the efficient equipment associated operational processes. The interference elements between the equipment derive through expert advice and analysis using IPA. Through the IPA, this research deducted the interference elements located 'Concentrate Here' which is the highest importance and the lowest performance.

  • PDF

부산지역 소규모 건설현장 근로자의 고령화 실태조사 및 개선방안 (Analysis of worker's Ageing in Small-size Construction Sites in Busan)

  • 이상호;허영기
    • 대한건축학회논문집:구조계
    • /
    • 제34권12호
    • /
    • pp.51-56
    • /
    • 2018
  • Due to the aging of economically active population in the world, the average age of workers in the domestic construction industry is also steadily increasing. This study analyzes the aging of construction workers in small-size construction sites in Busan, where the aging of the economically active population is the most severe in Korea. As a result of the study on the aging of construction workers in six construction sites with a construction cost of less than 500 million won in Busan, it was found that 65% of the workers were over 50 years of age. In addition, several experts interviews and survey revealed that 'securing welfare facilities for construction workers' and 'diminishing prejudice about the construction industry" were the most urgent and effective methods to overcome the aging problems. The results of this study can be served as basic data to solve the aging problems in the industry.

DSM을 활용한 타워크레인 양중계획 최적화에 관한 연구 (Optimization of T/C Lifting Plan using Dependency Structure Matrix (DSM))

  • 김승호;김상용;전지훈;안성훈
    • 한국건축시공학회지
    • /
    • 제16권2호
    • /
    • pp.151-159
    • /
    • 2016
  • 건설프로젝트에서 요구되는 중요한 장비 중 하나는 타워크레인 이다. 특히, 대부분의 고층건물 공사에서는 자재들의 이동작업들을 수행하기 위해 타워크레인이 더욱 요구되어진다. 따라서 타워크레인의 양중계획은 공사기간과 비용의 측면에서도 중요하다 할 수 있다. 하지만, 건설현장 대부분의 양중계획은 여전히 합리적인 작업의 분석없이 현장 관리자들의 경험과 직관에 의존하여 행해지고 있다. Dependency structure matrix (DSM)는 CPM과 Pert 같은 기존의 툴과는 다르게 작업 활동 순서 계획과 정보관리를 하는데 있어서 유용한 툴이다. 본 연구는 타워크레인의 양중 관리를 향상시키기 위하여 실제 건설 현장의 Case study를 통해 타워크레인 양중관리의 새로운 틀을 DSM을 이용하여 제시 할 것이다. DSM을 이용한 T/C의 양중계획의 Case study를 통해 나타난 결과는 기준층 양중 계획에 있어서 T/C의 양중계획을 최적화 시키는데 매우 유용하다는 결론을 보여주었다.

초고층건물 마감공사의 발주방식 선정요소에 대한 연구 (Analysing Decision Factors of Delivery System for Finishing Work in High-Rise Building Construction)

  • 이재일;안병주;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.345-348
    • /
    • 2003
  • 건축 프로젝트가 대형화 되어감에 따라 현장에서는 총체적인 관점에서 프로젝트를 관리할 수 있는 능력이 중요하게 인식되고 있다. 초고층건물공사는 그 규모로 인해 생산성 저하의 위험이 상존한다. 특히 관리대상 프로세스가 기타 공정에 비해 상대적으로 많은 마감공사는 생산성 유지 혹은 향상에 집중적인 관리가 요구된다. 즉, 골조공정의 생산성이 높더라도 마감공사의 생산성이 낮은 경우 전체 프로젝트의 생산성은 현저히 낮아지기 때문이다. 본 연구는 문헌고찰 및 인터뷰 둥을 통해서 초고층 건축공사의 마감공사 발주방식 선정요소를 도출하였으며, 이 요소들은 초고층건물 마감 공사의 발주방식에 어떻게 영향을 미치는가를 분석하기 위한 토대를 제공하고 있다.

  • PDF

IPA를 이용한 도로교량 골조공사의 작업조 생산성 관리요인의 중요도 및 실행도 분석 (Analysis of Major Management Factors Affecting Crew Productivity in Road Bridge Construction Site Using IPA)

  • 허영기;이상호
    • 한국건설관리학회논문집
    • /
    • 제20권3호
    • /
    • pp.39-45
    • /
    • 2019
  • 건설현장의 생산성은 견실성 및 생산활동의 효율성 평가을 위한 매우 중요한 지표이며, 건설 현장작업은 모두 작업조를 중심으로 수행됨으로 작업조의 생산성 관리는 특히 중요하다. 문헌연구 및 전문가 인터뷰를 통해 도출된 27개의 관리요인들로 설문조사를 실시하였으며 32부를 회수하여 분석하였다. 대분류항목의 실행도 및 중요도를 분석한 결과, '장비'와 '건설인력' 항목이 도로교량 공사의 작업조 생산성에 매우 중요한 것으로 나타났으며, 실행도는 중요도에 비해 비교적 미비한 것으로 밝혀졌다. 또한 소분류 항목 27개를 분석한 결과, 지속적인 관심을 가져야 하는 항목으로는 '적기의 장비조달', '효율적 작업조 구성', '작업자의 숙련도', '현장통제 및 감독능력'이 중요도에 비해 실행도가 낮음으로 보다 더 향상시킬 필요가 있는 관리 요인들로는 '장비 가동성능', '설계도서의 정확성', '시공상세도의 정확성', '작업지시 및 승인 시기', '작업지시의 정확성' 등인 것으로 밝혀졌다. 본 연구의 결과는 앞으로 도로공사의 구조체 공사에서 작업조 생산성 향상을 위해 유용하게 사용될 수 있을 것으로 사료된다.

구조BIM기반 공사비 상세분석 프로세스 구축 (Development of Construction Cost Analysis Process Based on Structural Building Information Modeling)

  • 이승일
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.237-238
    • /
    • 2012
  • As a way to improve productivity and integrated project delivery in construction industry, BIM(building Information Modeling) using IT technique is being studied and applied recently. S-BIM application Process was established that enable efficient work through Structural BIM detailed Model in consideration of the collaboration among relevant fields. This study has the objective applying S-BIM technique to enable effective Cost Analysis in initial design phase and presenting the method for practical works using Construction Cost Analysis Process based on S-BIM.

  • PDF

Top-Down 공사의 공정관리 방법 연구 (A Study on the Construction Process Management of the Top-Down Construction Method)

  • 강현정;임홍철;이강;윤대중;김상일
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 춘계학술논문 발표대회 제6권1호
    • /
    • pp.133-136
    • /
    • 2006
  • The top-down construction method is an excavation and substructure construction method by excavating earth and building slabs from the ground level to the bottom of a building. The top-down method can be categorized into several types by its process and other technical details. Some of commonly used top-down methods in Korea today are S.O.G., N.S.T.D., and S.P.S. Among these, one method is chosen depending on construction field conditions, cost, construction time and so on. This study explores several factors that may affect the selection of a top-down method. This paper reports preliminary survey results with 54 top-down construction experts and comparison results of 5 top-down construction sites.

  • PDF

모듈러 공공주택의 하자분석을 통한 품질 개선 방안 (Quality Improvement Measures of Modular Public Rental Apartment Houses through Defects Analysis)

  • 이순구;김규용;남정수
    • 한국건축시공학회지
    • /
    • 제24권4호
    • /
    • pp.425-436
    • /
    • 2024
  • 국내 공공주택으로 활용되고 있는 모듈러 공동주택은 도입 초기 단계에 있다. 그 발생된 입주단계 하자와 입주 후 유지보수 단계의 하자를 구분하여 분석한 결과 입주단계에서 높은 비율을 차지하는 도배 및 바닥재 공사는 보양 등의 품질관리가 요구된다. 유지보수단계에서는 많이 발생하는 누수하자에 대해서 지붕공사의 노출방수공법 보완과 저층부 콘크리트 골조와 모듈러 연결부위, 그리고 모듈러 발코니 부위의 철저한 설계 및 시공관리가 필요하다. 또한 골조 및 유닛모듈 시공업체를 1개 업체로 발주하여 전체 시공 관리를 일원화하는 것이 요구된다. 이로써 모듈러 공공주택의 품질을 향상시킬 수 있을 것으로 판단되며 모듈러 공법의 활성화에도 기여할 수 있을 것으로 기대된다.

공동주택 공기단축을 위해 개발된 조강 콘크리트의 강도 발현 특성에 관한 연구 (An Experimental Study on Strength Properties of Early Strength Concrete for Reduction of Working Period in Apartment)

  • 정양희;이재현;금경훈;이원암;김선만
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.157-160
    • /
    • 2009
  • The decision of the Form removal time which leads the early assuring strength of the concrete from Apartment construction is the fact which is important from Reducing the period of works and the economical efficiency side. Especially, with Complex building of recent times the same Tall building and Multiple Apartment Site which only follows in upgrade of interior construction of apartment site and shortening the frame construction period becomes very, importantly is the actual condition where the effort which is various for this is attempted. But is caused by with limit and economical efficiency problem of case concrete early strength revelation of most and is not put to practical use is the actual condition. Develops concrete mixture which is a utility from the research which sees hereupon and the effect which is economic leads construction duration shortening under maximizing boil.

  • PDF

아파트 현장 골조공사 떨어짐 사고 예방을 위한 Safety System 개선에 관한 연구 (A Study on the Safety System Improvement for Preventing Fall Accidents during Frame Construction in Apartment Sites)

  • 천병조;신동일
    • 대한안전경영과학회지
    • /
    • 제23권1호
    • /
    • pp.39-48
    • /
    • 2021
  • In the past, measures for the reduction of industrial accidents has led the safety and health policy of construction sites by the guidance, supervision and the regulation according to 「Occupation Safety and Health Act」 handled by Ministry of Employment and Labor (MOEL). Nowadays companies realize that due to the factors such as diversification of employment types, outsourcing of hazardous work, new construction method and complicated types of construction, etc., there is a limit on safety management for construction sites as far as it is passively led by the governmental safety management policy and regulation. In this study, in order to practice the autonomous safety management escaping from the government-led safety management, improvement plans are proposed and applied by analyzing the basic cause of the all kinds of fall accidents that could possibly occur in the apartment construction sites and by verifying the hazardous factors and risks by fields.