• Title/Summary/Keyword: 계층퍼지분석법

Search Result 46, Processing Time 0.034 seconds

A Study on the Selection of the Administration System for Busan New Port using the Hierarchical Fuzzy Process (계층퍼지분석법을 이용한 부산신항만의 항만관리 방안에 관한 연구)

  • Kim, Sung-Kuk
    • Journal of Navigation and Port Research
    • /
    • v.27 no.5
    • /
    • pp.547-555
    • /
    • 2003
  • A Port Authority system has been regarded as one of the efficient ways of port management. The Korean government is thus now planning to set up such a system into the Busan Port. Busan New Port is located in Kadok Island but divided Busan and Kyongnam administrative district, so complicated in the appropriate selection to Busan New Port Administration. The research method which was used in this study accounted for overlapping between attributes, and introduced the HFP( Hierarchical Fuzzy Process) method that can perform an operation.

A Study on a Validity of Traffic Signal Control using Fuzzy Analytic Hierarchy Process (퍼지AHP를 이용한 교통신호제어 적합성에 관한 연구)

  • Jin Hyun-Soo
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.16 no.4
    • /
    • pp.479-484
    • /
    • 2006
  • This paper discusses a fitness of the control on intersection using fuzzy analytic hierachy process. The validity of control of traffic signal on intersection is the fitness of phase and cycle on the intersection. The validity of the controller is cleared by the comparison of the delay time of vehicle. Fuzzy analytic hierachy process clears the grade of validity of the fixed cycle time controller and adaptive fixed cycle time and fuzzy trafic controller and proposes a new control type a traffic signal by this fuzzy analytic hierachy process.

A Study on a Validity of Traffic Signal Control using Fuzzy Analytic Hierarchy Process (퍼지AHP를 이용한 교통신호제어 적합성에 관한 연구)

  • Jin, Hyun-Soo
    • Proceedings of the KAIS Fall Conference
    • /
    • 2006.05a
    • /
    • pp.355-359
    • /
    • 2006
  • 본 논문은 퍼지 계층분석법을 이용하여 교통신호의 교차로에서의 적합성에 대해서 논의한다. 교차로에서의 교통신호는 현시, 주기 등이 현재의 교차로 상황에 적합한가를 구별하여 판별할 수 있다. 교통신호의 적합성 여부는 현시, 주기를 따로 구별한 신호체계에서의 지체차량의 지체시간을 비교하여 구별한다. 교통 신호체계는 고정신호체계, 최적신호체계, 퍼지응용신호체계를 구별하여 응용단계가 높은 신호체계가 적합성이 높음을 퍼지계층분석법을 이용하여 밝히고 이를 이용 새로운 체계의 교통신호 체계도 제시한다.

  • PDF

A Study on a Validity of Traffic Signal Control using Fuzzy Analytic Hierarchy Process (퍼지AHP를 이용한 교통신호제어 적합성에 관한 연구)

  • Jin, Hyun-Soo
    • Proceedings of the KAIS Fall Conference
    • /
    • 2007.11a
    • /
    • pp.252-255
    • /
    • 2007
  • 본 논문은 퍼지 계층분석법을 이용하여 교통신호의 교차로에서의 적합성에 대해서 논의한다. 교차로에서의 교통신호는 현시, 주기등이 현재의 교차로 상황에 적합한가를 구별하여 판별할 수있다. 교통신호의 적합성 여부는 현시, 주기를 따로 구별한 신호체계에서의 지체차량의 지체시간을 비교하여 구별한다. 교통신호체계는 고정신호체계, 최적신호체계, 퍼지응용신호체계를 구별하여 응용단계가 높은 신호체계가 적합성이 높음을 퍼지계층분석법을 이용하여 밝히고 이를 이용 새로운 체계의 교통신호 체계도 제시한다.

  • PDF

A Study on Hierarchical Fuzzy Process using Fuzzy Relation Equation (퍼지관계방정식을 이용한 계층퍼지분석법에 관한 연구)

  • 류형근;이철영
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2000.11a
    • /
    • pp.25.2-31
    • /
    • 2000
  • Recently, Fuzzy theory has been applied in evaluation problem. Fuzzy evaluation based on Fuzzy theory can accommodate fuzziness of judgement with people through introducing Fuzzy measure. Representative Fuzzy evaluation is Fuzzy Integral using Fuzzy measure. Definite methodology using Fuzzy Integral HFI(Hierarchical Fuzzy Integrals), HFEA(Hierarchical Fuzzy Evaluation Algorithm), HFP(Hierarchical Fuzzy Process), etc. In this paper, we deal with problem identifying evaluation value using Fuzzy Relation Equation at these Fuzzy evaluation. We verify relation between Input data and Output data through @-operation and apply this to HFP. And that we verify evaluation value which objects of evaluation are able to possess.

  • PDF

Application of Fuzzy Multi-criteria Decision Making Techniques for Robust Prioritization (로버스트 우선순위 결정을 위한 Fuzzy 다기준 의사결정기법의 적용)

  • Han, Bong Gu;Chung, Eun Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.917-926
    • /
    • 2013
  • This study presents the feasibility of fuzzy multi-criteria decision making (MCDM) techniques for the robust prioritization of projects. It is applied to water resources planning problem. Results from weighted sum method (WSM), analytic hierarchy process (AHP), revised analytic hierarchy process (R-AHP), and TOPSIS are compared with those from Fuzzy WSM, Fuzzy, AHP, Fuzzy R-AHP, and Fuzzy TOPSIS. For the calculation, all weights on criteria and the normalized data were obtained from the same investigation. As a result, the rankings from four MCDM techniques are slightly different while those from fuzzy MCDM show the comparatively consistent ranking. Therefore, it is desirable to use fuzzy MCDM technique when MCDM is used for the prioritization problem, since fuzzy MCDM can include the uncertain variability of input data and weighting values on criteria.

A Study on the Construction Method selecting scheme using Fuzzy Relative Preference Ratio method (퍼지 R.P.R(Relative Preference Ratio)기법을 이용한 건설프로젝트의 공법선정에 관한 연구)

  • Lee Dong-Un;Kim Kyung-Whal
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.143-150
    • /
    • 2004
  • Nowaday, The tendency of complexity and extension of construction fields increase the need for efficient works managements like a construction management. Consequently, by the introduction of Decision-Making Theories, researches for improving construction field's efficiencies are actively performed. Fuzzy Analytical Hierarchy Process method is invented, so that describes a decision maker's ambiguous linguistic judgment with fuzzy numbers. but most of researches on Fuzzy-AHP use symmetric triangular fuzzy function for estimating each evaluation item with the consequence that exact judgments are impossible. those limits are caused by the point that employed fuzzy ranking methods can not support dissymmetric fuzzy numbers. In this research, we aims to overcome this problem with R.P.R(Relative Preference Ratio) method and suggest improved Fuzzy-AHP method which can use dissymmetric fuzzy triangular numbers.

A Fuzzy Evaluation Method of Traveler's Path Choice in Transportation Network (퍼지평가방법을 이용한 교통노선 결정)

  • 이상훈;김덕영;김성환
    • Journal of Korean Society of Transportation
    • /
    • v.20 no.1
    • /
    • pp.65-76
    • /
    • 2002
  • This study is realized using fuzzy evaluation and AHP(the analytic hierarchy process) for the optimum search of traffic route and estimated by the quantitative analysis in the vague subjective judgement. It is different from classical route search and noticed thinking method of human. Appraisal element, weight, appraisal value of route is extracted from basic of the opinion gathering fur the driving expert and example of route model was used for the finding of practice utility. Model assessment was performed attribute membership function making of estimate element, estimate value setting, weight define by the AHP, non additive presentation of weight according to $\lambda$-fuzzy measure, Choquet fuzzy integral.

An Empirical Study of Selection of Cruise Terminals Location by Using HFP (계층퍼지분석법(HFP)을 이용한 크루즈 터미널 입지 선정에 관한 연구)

  • CHOI DO-SUEK;LEE SANG-HWA
    • Journal of Ocean Engineering and Technology
    • /
    • v.19 no.4 s.65
    • /
    • pp.56-65
    • /
    • 2005
  • This study aims at selecting optimum locations for cruise terminal This study uses the HFP(Hierarchical Fuzzy Process) based on the fuzzy theory, which is known to be effective in evaluating a complicated system whose evaluation attribut are vague or overlapping with one another such as the elements in selecting cruise terminal location and in treating both qualitative and quantitative data.

A Study on Control of Traffic Network Signal Control using Analytic Hierachy Process (계층분석법을 이용한 교차로망의 신호 제어)

  • Jin, Hyun-Soo
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2007.04a
    • /
    • pp.421-428
    • /
    • 2007
  • This paper discusses a fitness of the control on intersection network using fuzzy analytic hierachy process. The validity of control of traffic signal on intersection is phase, cycle of intersection. But the aigent of traffic intersection network is relative of intersection article. Therefor the aigent of traffic network intersection is before intersection passing vechile number, delayed vechile number. Fuzzy analytic hierachy process clears the grade of validity of the fixed cycle time controller and adaptive fixed cycle time and fuzzy traffic controller and proposes a new control type a traffic signal by this fuzzy analytic hierachy process.

  • PDF