Park Se-Kun;Kim Young-Jae;Kim Kyung-Rai;Shin Dong-Woo
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.432-437
/
2002
As the working design process of Turn-Key projects is a basic process for the final contract, this process has lots of business decision to be made. Because such results of business decision can be the basis on contract documents, it is the step which needs a through management for Turn-key project. But in case of domestic construction companies, because those are not organized process of working design process, project manager has had lots of trouble at each process to make the business decision. As a means of settling the problems, this research is initiated. First, working decision management process is identified and generalized by interviews with project managers. Second, cases that actually happened in the project are investigated and categorized. Third, response plan to solve the problems and check lists to prevent the problems are suggested. Finally, the process, cases, response plan, and check list are integrated using CBR for future reuse.
As Electronic Commerce(EC) has been emerged and has developed, many researchers have tried to establish EC framework for automated contract and negotiation using agent technologies. Traditional researches, however, often had limitations. They often enforced the user's participations during the automated contract process of agents. They also could only consider a few of the user's requirements for a specific goods and did not have supported the procedures and methodologies for making the best contract. In this paper, we propose business model on EC based on multiagents to overcome the defects of the previous researches. We apply CSP techniques to brokerage process to satisfy various preferential requirements from the user. We also propose efficient negotiation mechanism using negotiation model of game theory. The contract candidates automatically negotiate and mediate in terms of their benefits through the proposed negotiation mechanism. For the optimal brokerage and automated negotiation, the agents process activities for contract on three layers, which are called competition layer, constraint satisfaction layer and negotiation layer in the proposed model. We also design the message driven communication protocol to support the automated contract among the agents. Finally, we have implemented prototype systems applying the proposed model and have shown the various experimental results for efficiency of the proposed model.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.19
no.3
/
pp.97-103
/
2019
Electronic contract systems are widely used to integrate and manage the contract management process based on the development of ICT technology. Recently, improvement methods using block chain technology are being studied. However, contract management systems have processing performance, security vulnerabilities, data entry, and service accessibility issues. In this paper, we propose a block - chain based contract management platform with block chain, smart contract, and Rest API. The suggested platform includes the RPBFT algorithm which solves the processing performance and security vulnerability of the existing consensus authentication algorithm, and the algorithm to prevent data entry and enhance transparency of participants. The block-chain-based contract management platform proposed in this paper provides a use environment with improved processing performance, security, reliability, and transparency, and can be used through API without burdening construction. Therefore, The effect can be expected.
Korean Journal of Construction Engineering and Management
/
v.10
no.4
/
pp.38-49
/
2009
In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.
IT에 대한 의존도와 그에 따른 투자 비용이 증가함에 따라 IT거버넌스에 대한 관심이 높아지고 있는 추세이다. 또한 IT아웃소싱 시장의 확대, 계약 규모의 증가로 인해 IT 아웃소싱의 효과적인 운영에 대한 관심도 또한 높아지게 되면서 IT 서비스 제공을 위한 표준 등 프로세스를 기반으로 한 IT 서비스 관리가 주요 이슈로 떠올랐다. 본 연구는 국내 SI업체 V공급사와 그의 4개의 고객사를 대상으로 고객사와 공급사의 IT거버넌스 및 IT 서비스 관리에 대한 인식에 따른 IT아웃소싱 성공을 평가하였다. 자료의 수집은 IT거버넌스와 IT서비스 관리 프로세스 부문에 대해서는 관련 전문가(key informant)들을 대상으로 인터뷰와 설문을 통해 이루어졌고, IT아웃소싱 성공 평가는 고객사의 사용자(end user)를 대상으로 설문하여 약 200개의 데이터를 확보하였다. 그 결과 IT거버넌스와 IT 서비스 관리 성숙도가 IT아웃소싱 성과에 영향을 끼치는 것으로 나타났으며, IT 아웃소싱 성과를 평가하는 차원들끼리도 전체 만족도에 대해 영향을 미치는 것으로 조사되었다. 본 연구는 IT거버넌스와 IT서비스 관리 프로세스 성숙도가 IT아웃소싱 성과에 미치는 영향을 제시함으로써 IT거버넌스의 중요성을 인식시키고 IT서비스 관리 프로세스 시스템 도입을 고려하는 기업에 지침을 제공하고자 한다.
본 연구에서는 건설CALS/EC 기반의 정보화 추진을 위한 정보시스템을 개발할 때 적용되는 기존의 소프트웨어 개발방법론의 문제점을 분석하고, 표준화되지 않은 개발방법론의 적용으로 시스템 개발에 비효율적인 비용을 투자하는 문제점과 특성상 입찰, 구매, 계약 등 분야별로 상이한 기능의 업무에 따라 구축되는 건설산업 정보화에 있어서 상호간에 데이터 및 프로세스를 원활히 통합하지 못하므로 인하여 발생되는 개발의 중복성, 정보 활용의 비효율성 등의 문제점을 개선하고자 하였다. 이를 위하여 최근 새로이 부각되고 있는 방법론인 컴포넌트 기반 개발방법론(CBD: Component-Based Development)을 사용하여 건선CALS/EC 표준지침 웹서비스를 위한 시스템의 업무프로세스를 모델링하여 사용자가 쉽게 재사용가능하고 타업무분야에 확대 가능한 방향을 제시하였다. 본 연구를 위하여 기존의 소프트웨어 개발 방법론의 적용상 문제점 분석을 통하여 컴포넌트 기반 개발방법론의 필요성을 증명하고 비즈니스 컴포넌트 프레임워크를 사용하여 건설 CALS/EC 표준지침 웹서비스의 업무프로세스에 적용할 기술적인 방법론을 고찰하고 업무에 효과적으로 적용할 수 있는 업무프로세스 컴포넌트를 제시하였다. 본 연구에서 도출된 컴포넌트 모델은 향후 타업무분야의 시스템을 개발할 때 사용자요구분석 단계부터 별도의 재 작업이 없이 사용될 수 있으며 시스템을 구현할 때 개발 모듈의 중복방지와 용이한 비즈니스로직의 변경 등이 가능하며, 추가의 업무 프로세스나 연관된 다른 분야의 업무프로세스의 반영 및 추가 시 컴포넌트의 활동모델을 쉽게 수정하여 정의함으로써 쉽게 시스템의 기능을 확장할 수 있다.LE 산정에 관한 지속적인 실험적 연구가 이루어져야 하겠다. 증가할 것이다. 또한 부분육을 이용한 완전제품, 적색육제품, 유기농이나 별미식 제품과 같은 형태의 다양한 포장육 제품이 도입 될 것으로 생각되어진다.e in vitro SPF test method will be able to be used as an alternative method for in vivo SPF in case of lotion and cream. replica. A statistically significant improvement of Star Fruit Leaf Extract BG30-treated site was seen in decreased wrinkles. Star Fruit Leaf Extract BG30 results in clinically visible improvement in wrinkling when used topically for 5 weeks. 또한 관계마케팅, CRM 등의 이론적 배경이 되고 있는 신뢰와 결속의 중요성이 재확인하는 결과도 의의라고 할 수 있다. 그리고 신뢰는 양사 간의 상호관계에서 조성될 수 있는 특성을 가진 반면, 결속은 계약관계 초기단계에서 성문화하고 규정화 할 수 있는 변수의 성격이 강하다고 할 수가 있다. 본 연구는 복잡한 기업간 관계를 지나치게 협력적 측면에서만 규명했기 때문에 많은 측면을 간과할 가능성이 있다. 또한 방법론적으로 일방향의 시각만을 고려했고, 횡단적 조사를 통하고 국내의 한 서비스제공업체와 관련이 있는 컨텐츠 공급파트너만의 시각을 검증했기 때문에 해석에서 유의할 필요가 있다. 또한 타당성확보 노력을 기하였지만 측정도구
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.527-530
/
2007
The construction market has gradually become complexity, variety and specialization, and then owner's requirements about quality has become various. In order to solve the problem such as stated above, advanced constructions in France, United Kingdom, Japan and United States have introduced warranty contract which is warranted to quality and performance for need of owner in determined term to ensure the quality of construction since 1960s. In addition to, domestic constructions have been meeting with international competition because of the open BOT market from FTA. Finally, this study proposed new warranty delivery system model in PFI on considering domestic status by benchmarking the delivery process and the characteristics of the warranty contract which is applied to PFI of global.
A recent trend for product development requires that product design firms participate in every process in cooperations with clients. So, this study proposed an advanced practical management process for product design according to the new trend Because existing processes explain summary steps just including market research, design, engineering, manufacturing., to support the recent trend, an extended process which explains every steps should be prepared. Design development precesses include initial meeting, contact, kick-off meeting, market research, idea sketch, rendering, design drawing, design mock-up, design manual, engineering drawing, ES mock up, mold, manufacturing, and patent. To manage these whole design processes, designers should have abundant knowledge about them. This process has three merits: 1) understanding the whole processes, 2)the unity between design and manufactures, 3)collecting accurate information by market research, 4)elevating design quality. So, designers are able to manage whole product development processes. This practical management process proposes an advanced structure for product design development, and can be accepted for various product design development environments.
우리는 국가 경쟁력의 한 분야인 사업관리에 있어 계획, 수행, 성과관리, 개선에 최적의 프로세스 보유가 요구된다. 그러나 Project관리체계의 현 실태는 일정관리, 범위관리, 비용관리에 초점을 맞춘 일정관리체계, WBS(Work Breakdown Structure) 및 OBS(Organizational Breakdown Structure)관리, 비용관리체계의 부분 통합 혹은 서로의 연계 정도이다. 본 연구는 최적의 사업관리를 위하여 계약관리에 체계공학을 연계하여 계약 전에 WBS, IMP/IMS(Integrated Master Plan)/(Integratcd Master Schedule), TPM(Technical Performance Measurement) 등의 SEP(Systems Engineering Plan)와 계약 후의 이행을 검증 할 수 있는 과정의 Guideline을 제시하고, IEEE 1220, ANSI/EIA 632 순기 의거 개념설계부터 통합시험에 이르는 체계공학 순기에 따른 비용예측이 가능한 USC(University of Southern CalIfornia) 대학의 COSYSMO (Constructive Systems Engineering Cost ModeI)를 소개하고 적용 가능성을 고찰하며, Project의 전순기에 걸쳐 TPM 혹은 Quality를 비용과 일정에 통합하여 관리하는 PBEV(Performance Based Earned Value)모델을 소개하고 적용 가능성을 제시한다. Project 관리에 있어 System 차원을 강조한 SE(Systems Engineering), 비용예측의 CM(Cost Management), 성과관리를 위한 EVM(Earned Value Management)의 통합은 사업 관리에 역량을 강화하며 경쟁력을 향상 시킬 수 있는 적절한 접근으로 사료된다.
Recently, interests for SRM have been increasing rapidly to automate the whole processes of supply chain from sourcing to procurement and improve the whole efficiency of supply chain by strategically managing the relationship with external partners (suppliers). The national procurement service of Korea is trying to build new paradigms by introducing SRM for improving the competitiveness of national public procurement service. For this, a new assessment model for evaluating and selecting suppliers with fairness and objectivity should be developed. In this paper, we propose a new SRM solution including a model that evaluates and grades of suppliers' capabilities of performing the contracts. We also explain the innovation of national public procurement system through this SRM solution.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.