Performance Measurement Method and Case Study for BIM based Construction Simulation System (BIM기반의 건축시공시뮬레이션 시스템 성능분석 방법 및 사례연구)

  • Jun, Ki-Hyun;Yun, Seok-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.15-23
    • /
    • 2013
  • Because that construction project is usually uncertain and the plan of it changes frequently, it is difficult to make a reliable and feasible plan for it. As the BIM technology is developed, we can simulate the future of the construction project visually and make more reliable plan. However, data production efficiency is not so high, it is used just for animation and presentation usage. Although, a lot of construction simulation systems are developed, it is difficult to measure performance of them. In this study, we defined the construction simulation work process and the scenarios to measure performance of them. The performance measurement method using simulation process scenario can make possible benchmark test of them.

Simulation Analysis of Thermal Diffusion Based on the Depth of Cement Paste Exposed to High Temperature (고온에 노출된 시멘트 페이스트의 깊이에 따른 열확산 시뮬레이션 해석)

  • Kwon, Hyun-Woo;Lim, Chang-Min;Kim, Young-Min;Lee, Gun-Cheol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.85-86
    • /
    • 2022
  • In this study, a simulation using Company A's COMSOL heat flow program was used to analyze the thermal diffusion simulation according to the depth of the high-temperature exposed cement paste. As a result of the analysis, it showed a similar relationship with the measured temperature as of 180 minutes.

  • PDF

Works - Zero Energy House _ Shibaura Institute of technology (작품 - 제로에너지하우스(ZEH) _ 시바우라공과대학)

  • Kim, Myoungkeun
    • Korean Architects
    • /
    • s.569
    • /
    • pp.102-121
    • /
    • 2016
  • 일본의 시바우라공과대학에서 에네마네하우스 공모전에 참여해 제안했던 제로에너지하우스(ZEH)로 요코하마에서 시공한 후 해체하여 후쿠시마에 재설치해 활용한 프로젝트이다. 시바우라공과대학은 설계단계에서부터 BIM을 활용해 에너지 분석 및 시공을 위한 각종 시뮬레이션을 수행하였으며 특히 시공 후 전시기간이 끝난 후 재설치를 위한 조립시스템 검토에 유용하게 활용하였다. 이를 통해 에너지 효율과 지속가능성을 BIM을 통해 향상시킨 모범적인 사례이다.

  • PDF

Productivity Analysis for Asphalt Paving by Means of Simulation Technique for Site Conditions (조건별 세부공종 시뮬레이션을 통한 아스팔트 포장공사의 생산성 분석)

  • Kim, Yujin;Lee, Sumin;Noh, Jaeyun;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.34-35
    • /
    • 2021
  • Currently, the Korean Smart Construction Corporation aims to stimulate overseas expansion of smart construction technology centered on Expressway development. In addition, the integrated classification system of construction information with Work Breakdown Structure(WBS) is currently being established in Korea, but its application to the construction industry is limited. In this study, data generation using simulation is carried out at the lowest level of WBS presented by the Korea Expressway Corporation, and detailed process productivity is predicted by site conditions.

  • PDF

Development of Simulation Model for Optimization of Modular Construction Transportation Plan (모듈러 건설의 운송계획 최적화를 위한 시뮬레이션 모델 개발)

  • Kim, Hyeonmin;Kwon, Woobin;Ahn, Heejae;Cho, HunHee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.200-201
    • /
    • 2022
  • Off-Site Construction is being widely adopted as an alternative to solve endemic problems in construction industry such as low productivity and efficiency. However, it is strongly recommended to examine the transportation process to be optimized because it determines the size of a modular and influences the cost of the construction. Therefore, in this study simulation model for optimization of modular construction transportation plan was developed using AnyLogic. As a result of the study, the influence of trailer transport capacity and transport time increases as the number of modular which should be transported from factory to site increases.

  • PDF

A Study on the Use of BIM-based VR for Smart Safety Technology Simulation (스마트 안전기술 시뮬레이션을 위한 BIM기반 VR 활용방안 연구)

  • Lee, Hye-Jin;Jung, Sang-Ok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.259-260
    • /
    • 2023
  • This study aims to build VR using BIM at our actual site, simulate it in a realistic background, and simulate new safety-related technologies being developed by our company rather than safety education contents to review optimal use plans for each field type so that the new technology can be effectively applied in the field.

  • PDF

Development of Simulation Model for Earthwork Considering Factors Affecting Construction Productivity (생산성 영향요인을 고려한 건설현장 토공사 시뮬레이션 모델 개발)

  • Sa, Sewon;Lee, Chanwoo;Cho, Hunhee;Kang, Kyeong-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.149-150
    • /
    • 2021
  • Earthwork is the starting work of construction process, which has the greatest impact on the productivity of the construction project among the works. However, it is difficult to derive accurate productivity becuase the earthwork plan is affected by geological condition of the jobsite. Therefore, a simulation model for productivity analysis of earthwork was developed using CYCLONE modeling method in this study. In this paper, simulation model was made considering the impact factors of earthwork productivity. The proposed model can be utilized for sensitivity analysis in future studies.

  • PDF

A Study on the development of 4D based Architectural construction Simulation System (4D 시스템 기반의 건축시공 시뮬레이션 개발 방향 - 공정 프로세스 중심으로 -)

  • Jo, Jin;Kwon, Gi-Bum;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.119-122
    • /
    • 2007
  • The purpose of this study is to propose development of Schedule based Architectural Construction Simulation System. In this study (or paper), It analyzes the simulation system concept and its characteristics, and analyze the main functions simulation system and the range of functions which are already used currently. Therefore, It could find the limit of the present simulation system, and propose more effective solutions to develop Schedule based Architectural Construction Simulation System.

  • PDF

A Study on the Analysis of Simulation for Improvement Evacuation Safety Assessment of Building in Fire (건축물의 화재 시 피난안전성 평가 개선을 위한 시뮬레이션 분석 연구)

  • Kim, Hye-won;Kim, Yoon-Seong;Lee, Byeong-Heun;Jin, Seung-Hyeon;Koo, In-Hyuk;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.107-108
    • /
    • 2020
  • There is a need to analyze various factors in evacuation safety assessment of building in fire. In the current performance based design, evacuation safety assessment in case of fire is being conducted through the simulation as FDS and Pathfinder. However, the location and size of the door, the location of evacuation in the event of a fire are not considered when design. Accordingly, it is difficult to determine the worst case scenario considering the actual fire. Therefore in this study, in this study, we will propose an appropriate evaluation plan through simulation considering the worst-case scenario that may occur in case of fire.

  • PDF

Development of Inundation Flooding Simulation Program for Selecting Optimum Installation Site for Rainwater Infiltration Detention Block (빗물침투저류블록의 설치 최적지 선정을 위한 침수범람 시뮬레이션 프로그램의 개발)

  • Kim, Seongpyo;Lee, Taegyo;Ryu, Jungrim;Park seonmee;Choi, Heeyong;Choi, Hyeonggil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.129-130
    • /
    • 2023
  • This study proposes rainwater infiltration retention blocks as a solution to the flooding problems caused by recent climate change and developed a flood prediction simulation program to select the optimal site for installing rainwater infiltration retention blocks that can minimize damage from floods. By applying the existing 2D flood analysis model G2D and adding a reservoir function, the volume of water before and after installation can be determined through simulation results.

  • PDF