• Title/Summary/Keyword: 건축관계

Search Result 1,036, Processing Time 0.03 seconds

Analysis of Current Status and Teacher Librarians' Perception about Space Composition and Interior Environment of School Libraries (학교도서관 공간 영역 및 실내 환경 요소의 구성 현황과 사서 교사 인식 분석)

  • Song, Gi-Ho;Kang, Bong-Suk
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.31 no.1
    • /
    • pp.67-87
    • /
    • 2020
  • The purpose of this study is to analyze current status and teacher librarians' perceptions of school library space composition and indoor environment, and propose some methods for the school library to be a basic educational facility. The space most secured by the 126 teacher librarians who participated in the survey was the free reading area, and the space with the lowest level was the media production and group project area. The most important types of spaces for teacher librarians are the teaching area and the free reading area, while the recognition of the importance of media production and group project areas is relatively low. Among the elements of indoor environmental assessment, they showed that safety and comfort were the most important but diversity and flexibility were relatively less important. The result of this analysis is different from the school and library policy direction that emphasizes the learning commons and maker spaces. Teacher librarians still seem to appreciate the importance of traditional library space. Therefore, it is necessary to include the establishment and operation of maker spaces and learning commons in the teacher librarians training and retraining process. In addition, it is necessary to increase the participation of users such as teachers, students, and parents in space composition and interior design initiatives to increase the user's interior environment satisfaction.

Application Effect Analysis of The Modular Construction Method in The Extension Works (저층 교육시설 증축공사에서 모듈러 공법의 적용효과 분석)

  • Kim, Hakcheol;Shin, Dongwoo;Cha, Heesung;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.101-111
    • /
    • 2015
  • The modular construction method has been getting more attention followed by global eco-friendly trend as the domestic construction industry has focused more on remodeling and extension work. The modular construction method is an industrialized construction system which is not likely as the existing construction method it manufactures more than 70% modules at the factory then assembling can be completed in a short amount of time on site. The modular construction method has various strengths; shortening of construction period by on-site work decrease, weight pressure reduction by usage of light steel frames and cost saving by repetitive manufacturing. However, it is currently not expanded due to the existing commercialized construction method. Therefore, this research is in order to help the related authorities make decisions to select the construction method and motivate expansion of modular construction method which can be utilized effectively in the extension works. The intention of this research is to stress differentiation from other construction methods in construction period, construction expenses, labor and forces by comparing and analyzing actual cases, to inform competitiveness of modular construction method by concrete effect analysis and to support adoption of the modular construction method into the domestic industry.

Remodeling Process Model Applying Service Life and Functionality Evaluation for Military Facilities (내용연수와 기능성 평가를 활용한 군 시설물 리모델링 대상 선정 프로세스 모델)

  • Cho, Jongwoo;Lee, Hyun-Soo;Park, Moonseo;Kim, Jaegon;Moon, Hyo-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.41-52
    • /
    • 2015
  • The number of military facilities has been rapidly increased due to growing requirement of modernization and military welfare. However, adequate maintenance has not implemented to these facilities. As a result, they are deteriorated quickly and require performance enhancement treatments. There are two ways of performance enhancement, reconstruction and remodeling. Despite the research result that remodeling within the standard remodeling range is more economical, remodeling of military facilities is not considered equivalent to reconstruction as an option of performance improvement. Therefore, derived from the relationship between performance change during life cycle of building and range of remodeling needs, this study tries to propose Remodeling Process Model(RPM) which uses a method to choose remodeling in a Specific Point of Time(SPT) when remodeling is considered more economical than reconstruction. In addition, this study suggests practical service life and functionality evaluation standard together which require to realize the RPM. This RPM make it possible to avoid the cases that facilities which do not have any problem on structural reliability but have low level of functionality miss appropriate remodeling timing and inevitably choose reconstruction as a performance improvement option. It also present the possibility of simple reconstruction / remodeling decision-making for facility managers who administrate building having various type, compilation and elapsed time. Consequently, this process model focusing on remodeling more may contribute to reduce resource waste caused by reconstruction.

Productivity and Economic Analysis of Sandwich Panel Construction Work by Shop Fabrication (공장가공에 따른 샌드위치 패널공사의 생산성 및 경제성 분석)

  • Cho, Dong-Ryul;Son, Jae-Ho;Lee, Seung-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.113-122
    • /
    • 2009
  • The domestic construction market started to expand steadily since 1970s. The building market which utilizes a sandwich panel with advantages of economical construction expenses and convenient construction has grown rapidly in recent years. However, the companies which specialize in constructing sandwich panels are relatively small or medium size, compared with other construction companies. As a result, studies on the improvement of productivity have not been conducted sufficiently. In this study, the construction sites of sandwich panel are investigated, and the work processes by each team are analyzed. Additionally, the productivity and the construction cost of each work group are analyzed by constructing a model using the Web-Cyclone. It analyzed sensitivities about change of productivity and work costs following in processing place of the panel which is one of the productivity effect factors, so it assayed the optimized productivity by each work group and work costs. Analysis showed that 30% of productivity has improved compared with the factory processing work group, and analysis of work costs showed that about 15% of work costs was increased. Also sensitivity analysis of opening ratio showed that the work costs optimization will be accomplished when about 20% of opening was processed from the factory.

A Study on an acceptance of CDC guideline on practical emergency department planning -Focusing on comparison CDC guideline to Emergency Medical Service Act- (응급실에서의 감염관리 표준지침의 반영에 관한 연구 -응급실에서의 감염관리 표준지침과 응급의료에 관한 법률의 반영 비교를 중심으로-)

  • Yoon, Hyung Jin;Oh, Joon-Gul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.11
    • /
    • pp.7237-7243
    • /
    • 2015
  • Korea Centers for Disease Control and Prevention(CDC) has been provided not only manual of managing infectious patient but also functional requirement of space in emergency department(ED) by distributing "Guideline for infection control in emergency department(GICED)" in 2009. To understand how much the guideline enforces its functional requirement on ED planning practice, it is compared to Emergency Medical Service Act(EMSA) a basic standard for ED planning. As a result, it is clear that those have different focal point in functional program and don't share infection control issue. By reviewing target hospitals' EDs opened around 2009, all ED have satisfied with the EMSA requirement but guideline. Those are selectively adapted infection control related spaces CDC guideline suggested regardless of open year so that target EDs are not to be influenced by the guideline. This research can support as a reference research when the EMSA are going to be reinforced by infection contol issue.

The Diffusion of Boron from Borate Rod through Pinus densiflora and Pinus koraiensis (소나무와 잣나무에서 붕산염 막대로부터 붕소의 확산)

  • Oh, Choong-Sup;Kim, Jae-Jin;Kim, Gyu-Hyeok
    • Journal of Conservation Science
    • /
    • v.7 no.2
    • /
    • pp.60-67
    • /
    • 1998
  • The effects of moisture content (MC) and diffusion period on the diffusion of boron from borate rod through Pinus densiflora and P. koraiensis were investigated as a preliminary research of integrated remedial treatment for heritage wooden structures using borate rod. After equilibrating MCs of samples (15, 25, and 40%), borate rod (1,000 mg) was inserted into the sample, and stored for diffusion of boron at room temperatures ($23^{\circ}C$) for 2, 4, 8, and 12 weeks. Wafers were serially cut at constant intervals from rod treatment point and the boron penetration through longitudinal and transverse direction was measured by staining with boron indicator. For boron diffusion, MC above fiber saturation point was needed, and the diffusion rates increased with time. The fastest rates of diffusion were observed in longitudinal direction, followed by the radial and then the tangential direction. The rates of diffusion in all directions were the fastest in P. koraiensis. In P. densiflora, the diffusion rates through heartwood was faster than that in sapwood in longitudinal direction and vice versa in transverse direction. Based on the best result of this study, optimal space between rod insertion points could be recommended as follows; approximately 120 mm for P. koraiensis and heartwood of P. densiflora, 60 mm for sapwood of P. densiflora in longitudinal direction, and approximately 30 mm for all species tested in transverse direction. However, the effect of rod size and long-term exposure for diffusion on boron movement should be fully investigated for the accurate evaluation of optimal space between rod holes.

  • PDF

Analysis of Factors Affecting the Hygroscopic Performance of Thermally Treated Pinus koraiensis Wood (잣나무열처리재의 흡방습성능에 미치는 영향인자 분석)

  • Chang, Yoon-Seong;Han, Yeon-Jung;Eom, Chang-Deuk;Park, Joo-Saeng;Park, Moon-Jae;Choi, In-Gyu;Yeo, Hwan-Myeong
    • Journal of the Korean Wood Science and Technology
    • /
    • v.40 no.1
    • /
    • pp.10-18
    • /
    • 2012
  • A high airtightness is required for the residential spaces constructed recently to save cooling and heating energy through improving insulation performance. Because the chances to release steam formed by human activity in building and inflow of water vapor in outdoor air to residential space are reduced, the natural humidity control performance of interior materials has become more important. In this study, hygroscopic performance of thermo-physically treated wood (Pinus koraiensis) was estimated. At various relative humidity condition, the water vapor adsorption and desorption rates of wooden materials were measured as well as equilibrium moisture content. Effects of roughness and surface microstructure as physical factors and functional groups as chemical factors on the hygroscopicity were analyzed. It is expected that the results from this study and further study of measuring moisture generation in residential spaces could contribute to install a system for evaluating the hygrothermal performance of wooden building.

A Study on the Characteristics of Spatial Structure of Jiangnan Watertown(水鄕鎭) in China - Focusing on Wuzhen and Nanxun in Zhejiang Province - (중국 강남 수향진의 수변공간 특성 연구 - 절강성 오진과 남심을 사례로 -)

  • Choi, Jung-Kwon;Choi, Jung-Mean
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.34 no.4
    • /
    • pp.98-109
    • /
    • 2016
  • The purpose of this study is to identify characteristics of spatial structure of Jiangnan water town in China which has been developed along the water channel. Spatial structural characteristics of the water town, Wuzhen and Nanxun in Zhejiang Province are as follows. First, location of town, spatial framework, lot division, and architectural style get determined by the water channel. The water channel is constructed in cross shape, T-shape, or in combination. Secondly, public space of water town is established along main water channel. Visually and functionally alternating private buildings are established on the water channel side and they are creating unique landscape of Jiangnan water town in overall harmony. Thirdly, residential area is established on the east-west water channel side with southward sunny-faced arrangement and waterside residence is in introvert spatial structure with courtyard but the exterior space is connected with water channel intimately. Fourthly, various spatial components along the water channel enrich the sense of place in water town. The components are corridor with roof, tea house, waterside steps, waterside theater and watergate etc. Uniqueness of place is becoming the core competence in modern townscape. In this aspect, Jiangnan water town with historical and cultural accumulation is suggesting a significant implication. Major implications are as follows. First, promotion of proximity to the water is the basic value that the spatial plan of waterfront needs to pursue. Secondly, mixed use is essential for effective land use and revitalization of waterfront. Thirdly, waterfront plan based on the local uniqueness as the place asset is being required.

Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors (오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도)

  • Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.22-31
    • /
    • 2018
  • Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.

Case Analysis on Application of Project Delay Analysis Method in Domestic Construction Project (국내 건설공사에서 공기지연 분석방법 적용 사례 분석)

  • Kim, Seon-Gyoo;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.98-106
    • /
    • 2019
  • Recently, the number of project delay-related claims and disputes in Korean construction projects has been increasing rapidly. This suggests that the domestic construction contract practice, which has traditionally been superior to the client, is changing into a mutually balanced relationship among the contracting parties. The project delay analysis selects the application method according to the type of schedule approved at the start of the construction and how the schedule management was performed during the construction. The most important prerequisite for project delay analysis is that a complete CPM schedule agreed at the beginning of the construction is prepared and the actual progress of such schedule is well documented. This study is about applying the project delay analysis methodology of a case where a contractor claims damages to a client while constructing a large new private building construction project. In this study, it is determined whether the application of the as-planned analysis method is appropriate to the incomplete CPM schedule and then proposes the as-planned vs. as-built analysis method based on the new standard as an alternative. Next, apply the as-planned vs. as-built analysis method to the schedule in the case project, and then compare it with the result of the as-planned analysis method. The purpose of this study is to suggest a project delay analysis method suitable for the domestic schedule management practices, so that it can be used as a meaningful reference in project delay disputes and litigations of domestic construction projects.