Quality Improvement Checklist for Interior Construction based on 2D Drawings and 3D Modeling Analyses (2D 도면 및 3D 모델링 분석을 통한 실내 건축공사 품질향상 체크리스트 제안)

  • Lee, Jun-Seob;Bang, Hong-Soon;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.3
    • /
    • pp.269-280
    • /
    • 2022
  • With property values of buildings rising, interior construction works are also increasing globally. Interior construction technology has developed into building information modeling(BIM) that can estimate and integrate material quantities. Two-dimensional(2D) drawings and three-dimensional (3D) modeling are becoming a trend owing to the demanding on-site cost and process. 2D drawings and 3D modeling have both advantages and disadvantages that give rise to defects during interior construction work. The field problems, 2D drawings, 3D modeling, and preliminary risk factors of interior construction work were analyzed to identify real problems. Based on the problem analysis, various problems were derived, such as (1) communication with purchasers, (2) communication with workers, and (3) comprehension of the drawings. In this study, a checklist for quality improvement of interior construction was proposed to address the aforementioned issues.

아파트 규모별 자재 조달방식 안전에 미치는 영향

  • 박경태;손기상
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2002.11a
    • /
    • pp.64-67
    • /
    • 2002
  • 아파트공사 아파트 공사가 15층 레벨에서 20층 이상 고층 레벨로 건축되고 있다. 여기서는 그 배경을 언급하지 않지만 이들 공사 진행을 위해 조달되는 자재는 각 회사 본사에서 주요 자재를 일괄 구매하여 현장에 분배 공급하는 마치 정부의 조달청 역할을 갖는 경우가 많은 것으로 알려지고 있다. 현장 소장 권한 하에서 구매 조달하여 공사가 이루어지도록 하는 비율이 3%이하가 대부분이다.(중략)

  • PDF

장기방치공사 재개시 공사계획 및 관리

  • Cho, Sang-Young;Jung, Yong-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.1
    • /
    • pp.8-15
    • /
    • 2004
  • 1997년 11월 IMF 영향에 따른 ○○건설사의 부도로 인해 1년동안 ('97. 11∼'98. 11) 공사가 중단된 채 방치되어 많은 문제점을 안고 공사를 재개하지 못하고 있는 현장이 전국에는 아직도 100여개 정도 산재해 있는 것으로 알고 있다. 이와 같은 현장의 공사재개를 위해서는 다음과 같은 문제점을 검토해야 한다. 첫째 기술적 문제점으로는 기초와 지하주차장 골조공사가 일부 시공중 중단되어 철근이 1년 동안 방치된 채 부식되어 있어 구조물 안전진단은 물론 부도에 따른 기 시공 협력업체들의 채무정리(22개사)에 대한 문제가 해결되지 많아 공사의 재개에 많은 어려움이 있으므로 충분한 사전검토가 필요하다. 둘째 외부적 문제점으로는 그동안 공사중단으로 인한 입주자들에 대한 신뢰확보 즉 조합 및 분양자들이 건설사의 부도로 인한 중도금 납입 거부상태는 물론 선납금, 연체이자 등의 경제적 피해 손실로 발주처에 대한 집단소송 진행 등에 따른 건설사 및 발주처에 대한 불신 해소를 어떻게 하느냐가 공사재개의 중요한 관건이었다.(중략)

현대산업개발 용산 민자역사 현장

  • Lee, Seung-Gu;Kim, Byung-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.1
    • /
    • pp.58-63
    • /
    • 2004
  • 용산민자역사현장은 용산 역세권개발 21만평 개발사업중 1단계로 연면적 82,356평의 대규모 민자역사 건설 및 복합상업시설을 신축하는 공사입니다. 용산역은 국철, 경의선, 경부선 등이 통과하고, 향후 고속철도 및 경의선의 출발역으로 기능을 담당하며, 복합상업시설에는 전자점, 영화관, 할인점, 전문점등이 있으며 2000년 10월 착공 2005.9 준공 예정이며, FAST TRACK으로 공사를 진행하고 있는 현장입니다.(중략)

Estimation Method of Waste Amount from Materials to Develop Generation Rates of Construction Waste in New Apartment Construction Sites: Focused on Bill of Quantities for Architectural Works (신축아파트 현장의 건설폐기물 발생원단위 개발을 위한 자재별 폐기물 수량 예측 방법: 건축공사 내역서의 투입 물량을 중심으로)

  • Jung, Jong-Suk;Song, Sang-Hoon;Park, Seong-Sik;Lee, Seok-Je
    • Land and Housing Review
    • /
    • v.5 no.1
    • /
    • pp.41-51
    • /
    • 2014
  • The amount of new apartment construction has been trending upward in 3~4% each year since 11% increase in 2002. Currently, in public apartment construction sites under separate delivery system for construction waste processing, the significant difference between estimated quantity for contract and actual amount frequently causes severe controversy among project participants. Many factors such as poor environmental management, inadequate contractual amount are assumed to influence the above problem, and the requirement to revise existing generation rates, the key criteria applied in estimating the quantities of waste, is increasing. Most of generation rates were established in early 2000's, and have difficulty in reflecting the changes from new materials and technologies accordingly. Therefore, this study aims to clarify the types of construction waste for each trade and the forecast method as preliminary work in order to develop more accurate generation rates for construction waste in new construction. To achieve this purpose, the architectural bills of quantities in ten apartment projects executed during 2010~2013 were collected, and the possible waste types and reasonable material loss ratio for each item from temporary works to owner-supplying material area were defined and compared through the workshops and interviews with the experts and on-site environmental managers. The results of this study will contribute to establishing the categories of construction waste for construction trades and proper generation rates by the indirect estimation method in new apartment construction in the follow-up study.

A Case Study on Construction Cost Comparison for On-Site Construction and Off-Site Construction of Plant Project (플랜트 건설의 현장시공 및 모듈시공에 대한 공사비 비교 사례연구 - Pipe Rack을 대상으로 공사비 산정 -)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.4
    • /
    • pp.25-34
    • /
    • 2023
  • The purpose of this study is to calculate and compare construction costs for On-Site Construction and Off-Site Construction in Plant Project. For this purpose, the target for calculating the construction cost was limited to the Pipe Rack(Steel Structure and Piping). The results derived according to the purpose of the study are as follows. 1)The direct construction cost for On-Site Pipe Rack construction was KRW 56 billion, with Steel Structure KRW 25.1 billion and Piping KRW 30.8 billion won. 2)Comparing the rate of change between On-Site Construction and Off-Site Construction, material costs increased by 1.9% and expenses by 192.1%, but labor costs decreased by -9.1%, resulting in a total direct construction cost increase of 8.4%. These results can be used as reference data to check the current status of the increase or decrease in construction costs when constructing Pipe Racks as Off-Site Construction.

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.