• Title/Summary/Keyword: 건축공사표준시방서

Search Result 35, Processing Time 0.028 seconds

Proposing the Revision of Ondol Construction in the Standard Specification for Heritage Repair (문화재수리표준시방서의 온돌공사 개정 제안에 관한 연구)

  • Lim, Jun-Gu;Kim, Young-Jae
    • Journal of architectural history
    • /
    • v.32 no.5
    • /
    • pp.43-50
    • /
    • 2023
  • Ondol is a traditional underfloor heating system designated as a national intangible cultural heritage of Korea. The Cultural Heritage Administration (CHA) publishes a standard specification for the repair of cultural properties, including ondol. This standard specification is used as a guide for contractors who repair ondol in the field. However, the standard specification for ondol repair has some errors and is difficult to understand in the field. This paper proposes a revision of the standard specification for ondol repair. This study found that the standard specification for ondol repair has some problems in terms of the terminology and structure of ondol. These problems were sufficient to confuse ondol repairers in the field. Therefore, this study proposes to revise the standard specification to correct these errors and make it easier for ondol repairers in the field to understand. This study is expected to help recognize and preserve ondol as a cultural property and not just as a building.

A Consideration of Installation Method of Debris Net and Horizontal Safety Net (낙하물 방지망 및 추락 방호망의 설치방법에 관한 고찰)

  • JI, Suk-Won;Chol, Soo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.131-132
    • /
    • 2019
  • In the Public Notice No. 2019-15 of the Ministry of Employment and Labor, the safety net and regulations on them have been deleted. The performance criterion of the debris net, which also functions as a horizontal safety net in the regulations on the criteria of occupational safety and health, is unclear. When installing a debris net that also functions as a horizontal safety net, a net that meets the performance criteria of KS F 8082 must be installed in accordance with KOSHA C-31-2017. The Korean Standard Specification for Construction Works, which specifies debris net and horizontal safety net, should be revised as soon as possible.

  • PDF

A Review of Current Status and Applications of Korean Industrial Standards (KS) on the Floor Slip Resistance Testing (바닥의 미끄럼 시험에 관한 한국산업표준(KS) 현황 및 적용 실태)

  • Baik, Kwon-Hyuk;Ji, Suk-Won;Choi, Soo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.19-20
    • /
    • 2021
  • Although various laws and regulations have been put in place to prevent slips and falls, many accidents still occur. In this study, the root cause of slips and falls not decreasing were investigated. There are five types of slip resistance test methods in the Korean Industrial Standards (KS). Namely, KS F 2375:2016, KS F 2601:2020, KS F 2602:2016, KS L 1001:2020, and KS G 5821-1:2020 are listed. These test methods are cited in building certification standards (BF and G-SEED), construction specifications, and other documents that specify slip safety criteria. As a result of the investigation, a number of errors in KS regulations and legal text, errors in the manufacture and operation of slip testers, and errors in the use of measured values were found. These errors threaten the public life safety and disrupt industrial sites, and must be corrected immediately.

  • PDF

A Study of the law-suit requesting the guarantee against defects in the Apartment Buildings (공동주택 하자보증금 청구소송의 연구)

  • Yoon, Hyung-In;Jo, Byung-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.2 s.24
    • /
    • pp.67-76
    • /
    • 2007
  • The purpose of this study is to propose the efficient improvement in the lawsuit to request the guarantee against defect. This study points out several problems about related act and subordinate statue and judgement by analyzing the character of contract in apartment house, related laws and regulations, appraisals and judicial decisions. This study deduces the necessity of the establishment of the specification and the breakdown cost for repair and maintenance work to provide the standard for the detached judgement.

Analysis of the Work Breakdown Structure and Cost-Rate for Small Interior Works in Apartment (아파트 소규모 인테리어공사의 공종별 분류와 보할의 분석)

  • Kim, Chae-Yong;Lee, Jong-Gyu;Lee, Jae-Yong;Lee, Soo-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.213-219
    • /
    • 2010
  • The research, based on 200 cases of small interior works in6 different floor area types of apartment in Busan, intended to compare the architectural work with the breakdown structure and analyze the cost of general small-scale interior work, by work type. The outcome of the research is outlined as follows. (1) Given the cost of small interior works for apartmentsranges from 10 million to 15 million won, which correspond to apartments ranging in size from $79.2m^2$ (24PY) to $105.6m^2$, it is necessary to implement a cost analysis for material cost and labor cost for these two types. (2) Given that small interior work for apartments comprises mostly finishing work, unlike the categoriesof general architectural work, it is more reasonable to classify the works into 9 categories,which include embellishment, wood, tile, paint, metal, toilet, sink & furniture, electric & mechanical and other works, instead of the 22 divisions stipulated in the Korean Architectural Standard Specification. (3) After reviewing the average cost of small interior work and rate by floor area, it was found thatthe average cost of 24PY was 10.5 million won, of which metal work accounts for 12.8%, embellishment work 17.8%, and toilet 19.7%, while sink & furniture appeared to be the highest with 22.1%, while for 32PY, average cost was 12.5 million won,which comprises 7.4% wood work, sink & furniture 20.2%, toilet 23.4% and embellishment work the highest at 28.6%, indicating that embellishment work accounts for the greater portion.

A Study on the ConstructionCALS/EC Future Applying Methodologies of Its Key Technologies (국내 건설CALS/EC 관련 표준기술의 적용방안에 관한 연구)

  • 이주남;김인한;노대원;김운태
    • The Journal of Society for e-Business Studies
    • /
    • v.9 no.2
    • /
    • pp.87-108
    • /
    • 2004
  • The current construction industry mainly uses paper-based construction documents which are produced during the whole life cycle. The paper-based information hinders to reuse the construction information, due to the inefficiency to exchange and share the construction information between designers and constructors. To overcome these problems, construction CALS/EC (Continuous Acquisition and Life Cycle Support/Electronic Commerce) has been proposed by the government. It supports efficient reusing, sharing and exchanging the construction information using digitalized drawings and documentations. This study intends to show the future applying methodologies of using the standardized key technologies in the construction CALS/EC based on the case study of Korea and several countries.

  • PDF

Period of the Strength Correction of the Concrete with the Temperature Level Based on Meteorological Data (기상자료를 이용한 콘크리트의 단계별 기온보정강도 적응기간 산정)

  • Han, Min-Cheol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.107-112
    • /
    • 2008
  • According to Korean Architectural Standard Specification (KASS) , at the design stage of the specified concrete strength, strength correction with each temperature level should be considered to secure required strength at 28 days even in low temperature condition, In this paper, the period for the strength correction at the stage of mixture design of the concrete using ordinary Portland cement(OPC) specified in KASS was determined with each region of south Korea based on the meteorological data of KMA(Korea meteorological administration) by applying KASS-5 regulation. In case of 28 days of strength control age, the period for strength correction with 6MPa was calculated to $50{\sim}60$ days and, with 3 MPa. to around 80 days. The period for the strength correction was shown to be decreased with the rise of altitude. The period to consider the delay of the strength development due to low temperature including the period of cold weather concrete was nearly 7 months around 1 year. References for determining the strength correction factors with each region of south Korea was provided in this paper. Further investigation of strength correction of the concrete containing blended cement is to studied.

Determination of the Strength Correction with the Temperature Level in Each Region of Korea (우리나라 각 지역의 단계별 기온보정강도 적용기간 설정)

  • Baek, Dae-Hyun;Kim, Sung-Il;Kim, Jung-Jin;Lee, Gun-Cheol;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.19-23
    • /
    • 2007
  • In this paper, the period for the strength correction was determined with each region of south Korea based on the meteorological data of KMA(Korea meteorological administration) by applying KASS-5 regulation. In case of 28 days of strength control age, the period for strength correction with 6MPa was calculated to 50-60 days and, with 3 MPa. to around 80 days. The period for the strength correction was shown to be decreased with the rise of altitude. The period to consider the delay of the strength development due to low temperature including the period of cold weather concrete was nearly 7 months around 1 year. References for determining the strength correction factors with each region of south Korea was provided in this paper.

  • PDF

Integration of Temporary Fences for Demolition and Construction (해체${\cdot}$신축용 가설울타리의 통합방안)

  • Sin Dong-Sung;Jeon Jae-Man;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.258-261
    • /
    • 2003
  • Demolition is mort dangerous than construction and causes a lot of harmful environmental factors. But temporary fences used on demolition sites cannot play out their roles of blocking harmful environmental factors or securing stability and work space. They only block the view from the outside. This study begins with the possibility that the temporary fence can be installed prior to demolition. As a preceding step. we performed research on the actual conditions of using it. We then realized that it can be installed according to our research plan. First, we focused on actualizing the integration of temporary fences for demolition and construction. Here are the results of this study. First, we need to grasp the limiting factors of integration. Second, we ought to revise the Korean Architecture Standard Specification. Third, we should prepare against damage and transformation of fences. Finally, we can expect to reduce harmful environmental factors, cut down expenses, improve the working environment and raise the image of demolition by the integration of these fences.

  • PDF

Effect of Plant Roots Penetration and Watertightness of Asphalt Sheet according to the Cracks Width of Press Concrete (콘크리트 균열폭에 따른 녹화 식물 뿌리 침입 및 방수층의 수밀성에 미치는 영향)

  • Um, Tae-Ho;Kim, Young-sam;Lee, Jong-suk;Shin, Hong-chul;Kim, Young-geun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.1
    • /
    • pp.112-117
    • /
    • 2016
  • For artificial ground greening construction without root-proofing layer, this research reviewed the effect on watertightness of asphalt waterproofing layer by plant roots penetration based on crack width, and crack penetrated roots. Experiment on concrete crack width was performed with three conditions such as 0.15, 0.30, and 0.45 mm, and all three conditions confirmed that all plant roots penetrations were made through crack area in 12 ~ 18 months. In addition, according to evaluation of effects on waterproofing layer by crack penetrated plant roots and in condition of 0.45 mm crack width, it indicated that penetration is made on asphalt waterproofing layer in 12 months due to roots penetration.