• Title/Summary/Keyword: 건축경제

Search Result 765, Processing Time 0.026 seconds

A Study on the economic analysis of the standing water level control system (SAL상수위 제어시스템의 경제성 분석에 관한 연구)

  • Hong, Jong-In;Hong, Seong-Wook;Kim, Sang-Won;Yang, Jin-Kook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.281-283
    • /
    • 2013
  • In this paper, standing water level control system and a comparison of existing methods (anchor, PDD, DM) and economic analysis was conducted. 1) Cost PDD method (6%), DM system (4%), and the SAL standing water level control system (4%), except for the anchor system is similar to the construction of three methods based on the portion of the anchor system was analyzed that. 2) construction and maintenance costs compared with the sum of the partial was, anchor system (100%), PDD method (39%), DM system (37%), the SAL standing water level control system (21%), the SAL standing water level control system was identified as the lowest cost method of.

  • PDF

Study on feasibility analysis for ground source heat pump system using the building foundation (건물기초 이용 지열시스템의 도입 타당성 분석에 관한 연구)

  • Chae, Ho-Byung;Nam, Yujin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.155-157
    • /
    • 2013
  • Ground source heat pump(GSHP) systems have been attracted as high-efficient energy-saving technology, but the building clients and designers have hesitated to use GSHP systems which is a expensive initial installation and a uncertain economic feasibility. Therefore In order to reduce the initial cost, many researchers have focused on the energy-pile system using the structure of the building as a heat exchanger. Even though many of experimental studies for energy pile system have been conducted, there was not enough data of a quantitative evaluation with the economic analysis and comprehensive analysis for energy-pile. In this study, the feasibility study for the energy pile system with a barrette pile was conducted by the performance analysis and LCC assessment.

  • PDF

Development of Staggered Grip Type Coupling for Improving the Workability in Reinforcing Bar (철근공사 작업성 향상을 위한 엇물림 그립 타입의 이음장치 개발)

  • Woo, Jong-Yeol;Hong, Seong-Wook;Yang, Jin-Kook;Park, Seung-Hwan
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.295-297
    • /
    • 2013
  • Reinforcing bar coupling method has a variety of ways including lap-splice method. However, there are problems that need to be improved in terms of constructability, economics analysis. We should be improved about the problems of the existing methods. Accordingly, this study were developed a new type of staggered grip type reinforcing bar coupling. The proposed method show the following effects than existing methods. First, this method can be reduce time through improved workability. Second, increasing safety through the slip removal. Third, improving economic efficiency by reduce the manufacturing costs.

  • PDF

THE CONSIDERATION ABOUT DESIGN & CONSTRUCTION FOR LIGHTNING PROTECTION OF STRUCTURE (건축물의 낙뢰보호를 위한 광역피뢰침(ESE) 설계-시공 고찰)

  • Moon, Byong-Ju;Jang, Young-Hoo;Lee, Hyun-Hwa;Kim, Dong-Jin
    • Proceedings of the KIEE Conference
    • /
    • 2004.05b
    • /
    • pp.203-206
    • /
    • 2004
  • IEC에 의하면 낙뢰의 보호효율은 1등급(최대98%), 2등급(최대95%), 3등급(최대90%), 4등급(최대80%)으로 나타내고 있으며, 광역피뢰침은 다수설치해야 하는 돌침형 피뢰침의 수량을 기술적으로 최소화 하여 건축물의 안전성과 경제성 등을 향상시키는 역할을 담당하고 있다. 그러나 이런 보호 능력은 설계 및 시공시 세심한 배려가 필요하다. 프랑스에서는 피격거리 60M를 한계로 하며 미국에서는 안전성을 좀더 신경 써 괴격거리 45M를 한계로 가능한 보호효율을 높이고 있는 실정이다. 광역피뢰침의 선정시 보호범위의 최대치 적용은 지양하고 보호 효율을 높여 적용함이 바람직하다. 또한 초고층 빌딩 및 APT단지의 경우 가급적 보호등급을 1등급으로 적용하는 세심한 배려가 필요하다. 시공시 광역피뢰침은 수평면 최고 돌출물(예:옥탈 및 안테나 등)의 설치 높이의 차는 2M이상이 필요하며 이격거리 또한 가급적 최대로 하는 것이 바람직하다.

  • PDF

장기방치공사 재개시 공사계획 및 관리

  • Cho, Sang-Young;Jung, Yong-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.1
    • /
    • pp.8-15
    • /
    • 2004
  • 1997년 11월 IMF 영향에 따른 ○○건설사의 부도로 인해 1년동안 ('97. 11∼'98. 11) 공사가 중단된 채 방치되어 많은 문제점을 안고 공사를 재개하지 못하고 있는 현장이 전국에는 아직도 100여개 정도 산재해 있는 것으로 알고 있다. 이와 같은 현장의 공사재개를 위해서는 다음과 같은 문제점을 검토해야 한다. 첫째 기술적 문제점으로는 기초와 지하주차장 골조공사가 일부 시공중 중단되어 철근이 1년 동안 방치된 채 부식되어 있어 구조물 안전진단은 물론 부도에 따른 기 시공 협력업체들의 채무정리(22개사)에 대한 문제가 해결되지 많아 공사의 재개에 많은 어려움이 있으므로 충분한 사전검토가 필요하다. 둘째 외부적 문제점으로는 그동안 공사중단으로 인한 입주자들에 대한 신뢰확보 즉 조합 및 분양자들이 건설사의 부도로 인한 중도금 납입 거부상태는 물론 선납금, 연체이자 등의 경제적 피해 손실로 발주처에 대한 집단소송 진행 등에 따른 건설사 및 발주처에 대한 불신 해소를 어떻게 하느냐가 공사재개의 중요한 관건이었다.(중략)

Study on building room fire development stages (건축물 실내화재의 단계에 대한 연구)

  • Cha, Jong-Ho
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.169-172
    • /
    • 2008
  • The purpose of this paper is to summarize characteristics of fire growth stages, combustion proceeding, human behavior factors against fire, fire active protections, fire alarms in order to perform public safety and protection, personnel property protection, with identification of economic analysis aspects based on respective stages classified as fire generation- fire growth- flashover- fire extinction, which is differ from previous studies that based on distinct concepts such as fire stages, escapes, building construction, fire sensing.

  • PDF

Manufacture of Bending die System for the Manufacturing of Metal Panel Coner (금속패널코너가공을 위한 벤딩다이시스템 제작)

  • Kim, Woo-Ki;Kim, Seung-Kyeum;Choi, Kye-Kwang
    • Proceedings of the KAIS Fall Conference
    • /
    • 2008.05a
    • /
    • pp.293-295
    • /
    • 2008
  • 본 연구에서 개발할 설계기술은 부가가치가 매우 높은 소량 다품종 건축용 내 외장재의 금속 패널 코너가공법에 관한 것이다. 금속 금구류 및 건축용 내 외장재로 사용되는 2.5mm이상 되는 금속강판을 사용함에 있어서 가장 문제가 되는 직각코너링 접합부위에서 발생되는 내식성(수명성), 내후성, 및 미려성(디자인)을 향상시키므로 품질의 향상뿐만 아니라 소량 다품종의 생산성을 증대시킬 수 있는 국내 최초 금속패널 코너가공을 할 수 있는 벤딩다이시스템(Bending Die System)를 설계, 제작하여 경제적, 기술적으로 고부가가치를 창출하여 수출증대에 기여할 수 있다.

  • PDF

종합건설업체 탐방 ⑩-「Self 디자인」개념으로 아파트 건축의 혁신을 주도하는 벽산건설(주)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.2 s.199
    • /
    • pp.66-70
    • /
    • 2007
  • 벽산건설(주)은 1958년‘한국스레트공업주식회사’로 출발하여 우리나라 경제성장 시기를 함께하며 발전해왔다. 1991년 벽산건설(주)로 상호를 변경, 현재까지 국내 건설부문의 일익을 담당하고 있다. 벽산건설(주)은 특히 아파트 건설부문에서 두각을 나타내고 있다. 2005년 벽산건설(주)의 아파트 브랜드인“블루밍”에 대해 SDP(Self Design Project)를 런칭해 그동안 일률적이던 아파트 내부 건축에 대해 변화를 줘 고객에게‘자신만의 아파트’라는 이미지를 심어준 것이다. 끊임없이 발전하려는 벽산건설(주)의 노력이 지금의 벽산건설(주)을 만들게 된 원동력이다. 벽산건설(주)은 2007년을“내실기반의 지속성장을 하는 해”로 설정하고 올해 경영방침을 △수익기반의 다변화 △고객 만족 경영 △Software 경쟁력 강화로 정했다. 이에 따른 구체적인 경영전략으로 △전략적 제휴확대로 양질의 수주 확보 △Before Service 전사적 확대 △인적자원 경쟁력 강화 △핵심기술의 확보 및 개발 등 더 나은 기술과 고객만족을 위해 오늘도 정진하고 있다.

  • PDF

Comparison of Reinforced Concrete Construction Technology between North and South Korea (남북한 철근콘크리트 시공기술 비교)

  • Baek, Cheong-Hoon;Kim, Eun-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.208-209
    • /
    • 2020
  • There is no disagreement that the construction sector will play an important role in inter-Korean economic development cooperation. However, very few studies have been made at North Korea's construction technology. North Korea shows a lot of differences from South Korea, from the quality standards of building materials to construction technology. It is clear that these differences will be a stumbling block to the promotion of construction projects in the inter-Korean cooperation stage. Therefore, the start of inter-Korean economic development cooperation should be preceded by work to clearly recognize each other's differences and lay the foundation for integration or compatibility. The purpose of this study is to compare the construction technology of rebar concrete construction. We compared the differences with Korea's construction method based on the construction books recently published in North Korea, and derived the characteristics of North and South Korea for each detailed process of reinforced concrete construction.

  • PDF

A Study on the Economic Assessment Through Case Study of Remodeling (건축물 리모델링 사례 분석을 통한 경제성 평가에 관한 연구)

  • 김천학;양극영
    • Journal of the Korea Institute of Building Construction
    • /
    • v.1 no.2
    • /
    • pp.154-164
    • /
    • 2001
  • This research is aiming to specify the requirement of the investment such as intial cost, running cost earning rate to make effective investment considering the purpose of remodeling and economical value of store building enough to meet the initial purpose of remodeling. The review of earning for economical evaluation was performed by the on-site auditing on the structure and function of the building and applying the assessment simulation program, which is to find the possible business model to identify the requirement of building owner through case study. After the research, the following results are obtained. First, it is important that many aspects should be carefully analysis and the best method should be selected as characteristics of remodeling can be defer each other in their implementations. Second, though the remodeling of exist building to promote the functions has been applied, no suitable assessment tool has bee developed for deciding the level of remodeling in the view of economical efficiency so far. Third, the economical benefit was evaluated by analysing annual earning rate which is applied by investment items and recovery period for the investment. More specific date base should be established to apply the suggested economic acessments in business enough ti forecast the future circumstances. More researches should be promoted on the area continuously as well as the integrated economic evaluation of remodeling on existing building.

  • PDF