• Title/Summary/Keyword: 건설 PMIS

Search Result 73, Processing Time 0.03 seconds

Developing a Project Management Information System for Construction Claims (건설 클레임에 대비한 정보관리시스템 개발)

  • Wang, Hankyeom;Park, Junil;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.70-81
    • /
    • 2018
  • Claims in the construction industry can have a serious impact on the profitability of the project or can even result in project failure if it fails to take appropriate prevention. In order to properly prevent and respond to the potential claims and legal disputes throughout the project execution, it is necessary to continuously accumulate informations and clearly define the roles and responsibilities of the important activities systematically. Based on these needs, this study develops and verifies the project information management system(PMIS) that can prevent and respond possible claims for construction projects. Developed system includes such management modules as schedule, cost, PM/CM, design, collaboration, and claims. The system was validated by adopting it to the practical projects. The results showed that information systems tailored to the construction claim need to elevate users' familiarity to be more useful. Besides, the system can be more functional when used by both owners and contractors.

BIM-based Smart BOM by the Configuration Management of the Life-cycleconsidering the Railway Construction Project Management System and Method (BIM 기반/스마트 BOM의 형상관리에 의한 전 생명주기를 고려한 철도건설사업관리 시스템 및 방법에 관한 고찰)

  • Chung, Su-Young;Lee, Jong-Seong;Park, Soo-Choong;Lee, Geun-Young
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2280-2285
    • /
    • 2011
  • As the prefecture railroad construction accelerates, unmanned system's reliability and safety is increasing in demand. Accordingly, effective management of construction projects for the PM and SE techniques are being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. This study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.

  • PDF

The Development of Urban Metro Maintenance Facility System Using Construction Classification System Management (공종분류체계를 활용한 도시철도 시설물 유지관리시스템 개발)

  • Hyun, Ji-Hun;Yang, Byong-Soo;Moon, Sung-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.69-77
    • /
    • 2012
  • The construction data should be controlled from the life-cycle perspective. The current PMIS (Project Management Information System) usually focuses on the construction operation stage. The PMIS does consider the utilization of the construction in the maintenance of constructed facilities. This paper tries to interface the construction data with the maintenance data for effective use of construction data in the life-cycle perspective. To achieve the research objective, a maintenance breakdown structure is established and connected to the work breakdown structures. The connection of the two breakdown structures provide a structured utilization of construction data for efficient maintenance work activities. A prototype suggests that the interface of maintenance and work breakdown structures can help provide a construction and maintenance data in a more efficient way for maintenance activities.

Interface Management Practices for Minimizing Design Change - Focusing on the Case Study - (설계간섭 최소화를 위한 인터페이스 관리방안 - 사례현장 적용 내용을 중심으로 -)

  • Ahn, Sanghyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.22-29
    • /
    • 2013
  • As construction projects are getting larger, more complex and specialized, the size and scale of the structures are increasing and large-scale projects with multiple participants involved have continuously been ordered. Due to the nature of a large-scale construction project, when there are interferences and conflicts in process, schedule and area among project participants, the project requires more time and efforts to resolve the issues as it progresses further. This study suggests the interface management model that is time-saving and physically beneficial in solving interface issues based on case study. This study provides a practical management model including the organization of interface consultative group, checklist preparation, LIST management and PMIS application, which will be useful for the construction sites seeking effective know-how to manage design interferences and changes.

A Case Study of Construction Management for Pusan National University Children's Hospital (부산대학교 어린이병원 건립사업 CM 수행사례)

  • Yang, Jin-Kook;Ri, Min-Hyeon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.13-18
    • /
    • 2007
  • The construction by the ministry of health and welfare support of the first special hospital for only children in busan and gyeong-nam is under building with YPNUH(Yangsan Pusan National University Hospital) for the best medical treatment town and is to improve the productivity and efficiency by eliminating unproductive and inefficient fact through the construction management, systemic and scientific management technique. So in this study we would like to suggest the generated effect to apply project management technique to all stage such as from pre-design phase, turn-key enterprise choice, construction, design VE(Value Engineering), PMIS (Project Management Information System) construction to maintenance phase and cost and schedule reduction effect through basic, execution design VE by using engineer of field.

  • PDF

Diligence and Indolence Management System for Specialty Contractor on Construction Site -Using GPS of Smart Phone- (스마트 폰의 위성항법시스템(GPS)를 활용한 전문건설업체 현장 근태관리 체계 구축)

  • Ahn, Chi-Sun;Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.56-66
    • /
    • 2012
  • The Recent Specialty Contractor in construction of the reduced quantity due to the recession, but competitive in order to increase the number of companies that are increasingly competitive. The field work of one person to perform the work of employees and multiple sites, workforce supply flow that occurs at each stage of information transfer is not made a late staffing. Therefore this research has proposed a new alternative that can overcome them and the entire industry in recent issue smart phone features that take advantage of GPS(Global Positioning System). This paper presents a Diligence and Indolence Management System using GPS of smart phone. offering the advantage of Web-based PMIS(Project Management Information System) through integration with real-time information transfer and smart phone applications for query by building a prototype of a professional construction company as their own on-site management measures are proposed to contribute time and attendance.

The Construction Management Plan of Dong Myoung Service Area (동명휴게소 건설사업관리 수행계획)

  • In Chi-Sung;Kim Jeong-Won;Jung Soon-Gil;Park Gwon-su;Lee Sung-Gak;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.40-47
    • /
    • 2003
  • The main purpose of Construction Management(CM) is the improvement of efficiency and effectiveness of the project with construction methodologies systematically and technically. This pilot project Dong Myeong Service Area and Gas Station project among 5 projects designated and supervised by Ministry of Construction and transportation(MOCT), is to reduce cost, to maintain and control schedule, to keep proper quality, Claim and Risk through Partnering, Design Review, Constructability, Value Engineering and Project Management Information System(PMIS) and so on. Major factors of CM Plan are introduction of the phased and classified Construction Management Services from initiation of project to completion and adaptation of CM technologies and guide the implementation methodologies of the CM Pilot Project in CM construction market.

  • PDF

A Platform Design Study of Intelligent Program Management Information System (iPMIS) (지능형 종합사업관리 시스템 플랫폼 디자인 방안에 관한 연구)

  • Yeom, Ji-Woong;Kim, Ju-Hyung;Ahn, Byung-Ju;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.716-719
    • /
    • 2008
  • Yongsan International business Center, Incheon Songdo City, Roppongihill sand Midtown, including the most of latest internal and external construction projects become larger and more complicated than before. Mega project is one of most complicated project type as public and private sectors involve and the space will be construed in all directions i.e. horizontal, vertical, underground and ground. Therefore mega projects need a new program management information system to start the project's success. So this paper proposes a platform design study to intelligent program management information systems to mange mega projects.

  • PDF

The Design and Implementation of Project Management Information System based on 4CM (4CM기반의 건설사업관리 시스템 개발 및 구현)

  • Choi, Sung Youn;Kim, Jae Soo
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.7 no.2
    • /
    • pp.101-113
    • /
    • 2011
  • As information and communication technology advances driving the rapid evolution of e-commerce and e-business becomes on effective marketing means for both business and institutions, the industry deals with these changes and has a profound, positive impact on production and operations management. But the construction industry falls behind compared with other industries in productivity, informationalization, automatization and globalization. Especially even though the informationalization is inevitable in any developing society, a number of construction industries can hardly cope with it properly. As the construction industry gets informationalized and advanced, the introduction of PMIS (Project Management Information System) is making progress actively for the effective construction project control and productivity improvement in construction. With the government officials' political promotion and the rising desire for construction informationalization of enterprises, many are attempting to develop integrated systems or to replace a previous system with a more advanced alternative. Construction Industry, however, has the peculiar properties that the period for the completion of construction is limited and on top of that, most of its data processing systems are seen as being an early stage in the design of management information systems. As a result, there are extremely few applications in the construction industry. In this paper, we propose the PMIS system based on new model 4CM that improves on previous models.

A Conceptual Model for an Administrative and Legal Process Provider of Urban Regeneration using Construction Interactive Electronic Technical Manual (전자매뉴얼을 활용한 도시재생사업의 법.행정절차 제공 시스템의 개념적 모형)

  • Park, Moon-Seo;Jeong, Jin-Wook;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.33-42
    • /
    • 2010
  • Recently construction industry has faced new era as following the advances of IT technology. It becomes possible that information and knowledge among people are exchanged actively thanks to computer-based tools. In fact, the tools, PMIS(Project Management Information System) and KMS(Knowledge Management System) already have been introduced to constuction industry successfully. Lately IETM(Interactive Electronic Technical Manual) is tried to be one of these systems. This trying is being enlarged that the IETM's concept is changed to administrative and legal process provider throughout the lifespan of construction projects. However, it is hard to define construction IETM in mega-scale project like urban regeneration project because construction projects are complex and have diverse stakeholders. These properties may make the IETM ambiguous system. To do define IETM as a administrative and legal process provider, this research will conduct survey and interview, then analyze its own properties and find out design strategies. Based on the properties and strategies, suggesting IETM's system demands and architecture of urban regeneration processes.