Developing a Project Management Information System for Construction Claims (건설 클레임에 대비한 정보관리시스템 개발)

  • Wang, Hankyeom;Park, Junil;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.70-81
    • /
    • 2018
  • Claims in the construction industry can have a serious impact on the profitability of the project or can even result in project failure if it fails to take appropriate prevention. In order to properly prevent and respond to the potential claims and legal disputes throughout the project execution, it is necessary to continuously accumulate informations and clearly define the roles and responsibilities of the important activities systematically. Based on these needs, this study develops and verifies the project information management system(PMIS) that can prevent and respond possible claims for construction projects. Developed system includes such management modules as schedule, cost, PM/CM, design, collaboration, and claims. The system was validated by adopting it to the practical projects. The results showed that information systems tailored to the construction claim need to elevate users' familiarity to be more useful. Besides, the system can be more functional when used by both owners and contractors.

A Reduction of Claims for Efficient Turn-key Project (효율적인 턴키사업 추진을 위한 클레임 저감방안)

  • Oh, Ye-Keun;Sohn, Jeong-Rak;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.122-130
    • /
    • 2012
  • Currently, TK(Turn-key) projects have been implemented, the projects on TK basis still have shown several problems rather than its own merits as a bidding method. Increasing the number of claims being occurred during construction process of the projects is reality because of unclear notice of tender documents and conditions of the contract, design review system, and decision process of the qualified bidder. To establish desirable TK projects in domestic market, not only should resonable alternatives for carrying out design review system and selecting the bid winner be set up, but also proper standards for reforming irrational system of contract, bid, and notice of tender related to TK projects. This study is intended to reduce the number of claims and implement efficient projects of apartment construction on TK basis by identifying potential problems through analysis of claim examples of TK projects which have difficulties of revising contract agreement such as drawings and suggesting improvement methods for contract conditions and notice of tender docuements.

A Study on the Suggestion of Construction Contract Practice in the Public Project through the analysis of Construction Claims (건설클레임 사례분석을 통한 입찰 및 계약제도 개선에 대한 연구)

  • Cho Young-Jun;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.78-87
    • /
    • 2001
  • Recently many construction claims related to the ommission and discrepancy of design document are alleged since 1998 and various dispute resolution methods are appeared. But many contractors alleged claims are not satisfied with the result because of not sufficiently reflecting construction practice. The purpose of this study is to analyze the liability of contract privity from the view point of the contract related law and to analyze the claims and claim factor, and to suggest construction contract practice in the public project. The construction claims related to the design document may be minimized, through (1) the accumulation and retrieval of standard forms by owners' type, (2) the usage of specified specification considering project characteristics, (3) the materialization of detail subsurface design and various contract method in heavy engineering construction.

  • PDF

Development of Checklist to Prevent Claim through Dispute Case Analysis of Public Construction Projects (공공공사의 분쟁사례 분석을 통한 클레임예방 체크리스트 개발)

  • Shin, Chang-Joon;Kim, Yoon-Kyum;Cho, Kyu-Man;Hyun, Chang-Taek;Hong, Tae-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.13-22
    • /
    • 2011
  • Many studies on cause and prevention of claim have been carried out but they were mostly intended to come up with the improvement measures, improvement system or the measures to deal with the claim, which consequently lacked the substantial ways to identify the details of claim for prevention purpose. That is, there's in fact no tool, in preparation for potential claims, to identify and review the major potential causes at design stage to mitigate the claim and thus, it's necessary to develop the tool such as checklist needed to prepare the claim-supporting documents, check the relevant laws as well as to identify the cause of claim. Hence the study, given the fact that cause of claim is mostly generated at the design stage though the claim itself tends to occur at the construction stage, was aimed at developing the checklist based on contract document such as design documents at design stage for public construction projects in a bid to prevent the potential claim occurred at the design stage.

A Study on Dispute Claim to the Apartment Reconstruction Projects (공동주택 재건축 사업의 분쟁 클레임에 관한 연구)

  • Lee, Mi-Ae;Kim, Dea-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.268-273
    • /
    • 2008
  • Because a procedure is complicated and various related parties participate in the redevelopment and reconstruction project, it can be extended to diverse disputes when the relation with the related parties is smoothly adjusted. In particular, when the dispute occurs in a phase of occupancy after the complete construction, the regional residents-centric association must give up many rights of invisible parts caused by the construction company's profit maximization because they are short of professionalism about the business. Accordingly, this study is aimed at providing the construction project manager's dispute and claim process for responding to the dispute or claim reasonably and for obtaining the client's (association) rights for the reconstruction project, and at developing the checklist for obtaining the necessary documents by each phase, when the dispute or claim is made by the association against the construction company after the completion of construction. Through this study, the association can obtain the related documents in advance and can implement the reasonable response data when the dispute or claim occurs due to it. Also, it will enable the construction manager to analyze the project costs reasonably and will reduce the estimated wastes. That is, the work efficiency is expected to be improved.

  • PDF

Benchmarking Research Based on Contract Documents for Successful ADR Implementation to Domestic Construction Industry (ADR 활성화를 위한 건설 계약서의 해외 사례 벤치마킹 연구)

  • Choi Jeong-Won;Kim Sang-Bum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.629-633
    • /
    • 2004
  • The number of claims and disputes among project participants has been steadily increasing last a few years and it creates numerous conflicts and problems in the domestic construction industry. One of the root causes of claims and disputes can be explained by the fact that project objectives of participants are offer different and not aligned. This research is considered as a pre-study of developing a strategy to mitigate conflicts such as claims and disputes in the domestic construction industry by utilizing Alternative Dispute Resolution (ADR) techniques. This research focused on improving standard contrast documents to establish a systematic dispute resolution process which emphasize the ADR method. To do so, several well-recognized contract documents developed by FIDIC, AIA, ECC were throughly investigated and analyzed using a benchmarking process. Result of the research propose needs of improving the domestic construction document's some clauses and the details will be further Investigated through surveys and expert's opinions.

  • PDF

Empirical Study on the Validity of Construction Bond-related Litigations (건설보증(建設保證) 분쟁해결(紛爭解決)의 소송(訴訟) 유효성(有效性)에 관(關)한 실증적(實證的) 연구(硏究))

  • Kim, Jong-Seo;Choi, Jong-Soo;Lee, Jae-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.99-111
    • /
    • 2006
  • Of the numerious dispute resolution methods, Alternative Dispute Resolution(ADR) is the most highly recommended approach for the guarantee bond-related dispute. In reality, however, claims were not resolved satisfactorily through ADR because of the lack of reference materials for negotiation, thus those were frequently had to be resolved through litigation. The above fact implies that, it is required to seek an efficient way to resolve the bond-related claims prior to they progress to litigation. This research paper intensively investigated judicial precedents of 232 cases with regard to construction bond-related disputes that observed during the analysis period(2000-2004). According to the summary statistics, it turned out that litigation were time consuming and potential economic loss was tremendous; on average, it takes 1067 days(the longest case was 1965 days) for dispute resolution. It suggests that litigations should be discouraged considering the magnitude of potential loss of stake holders. Research results revealed that there are some significant differences between categories in some variables affecting to the rate of winning; i) the number of lawsuit deputies of a plaintiff (in the 1st trial), ii) dispute locations (in the 1st and 3rd trials), iii) contract price (in the 1st trial), iv) contractors' operating capability (in the 1st and 2nd trials). For the rest of variables, significance level between categories was too low for preparing efficient improvement plan. Despite the important implications drawn from the analysis, this research has limitation due to the several reasons such as data structure, the depth of Information, etc. Therefore, more systematic research should be followed in the future.

Dispute Settlement in Construction Contracts Under FIDIC (FIDIC에 의한 건설계약 분쟁 해결방안에 관한 연구)

  • Kim, Seong-Chirl;Jung, Byeong-Hwa
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.4
    • /
    • pp.21-29
    • /
    • 2010
  • International construction contractors are often faced with the situation of working in an unfamiliar construction environment. Under FIDIC rules, the contractor has the right to make a claim requesting the consulting engineer for an adjustment to the contract price or the time for completion when a part or parts of the works have changed, or in the event of unforeseeable conditions. Contractors generally have more access to the costs and time implications of such a change or unforeseeable conditions than the consulting engineer or outside neutrals. Due to such an asymmetry of information, the contractor may be motivated to dispute frivolous claims of less merit, expecting erroneous judgments by the consulting engineer or the neutrals. In this paper, a claiming behavior model is presented by using game theory and experience data to study the manner in which frivolous claims develop into disputes. The model also analyzes the impacts of DAB/DRB upon the frivolous claims.

The Study on Analysis of the Claim Elements for Preventing the Potential Claim in a Large-Scale Turnkey-Base Building Project - Focused on Cases of Domestic Project - (대형 건축 턴키공사의 클레임예방을 위한 클레임 요인 분석에 관한 연구 - 국내 사례를 중심으로 -)

  • Yoon Jun-Seon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.205-211
    • /
    • 2005
  • Turnkey projects accounting for some $10\%$ of the total volume of the projects in the domestic market have been often implemented without the process of full-scale review or study because of clients' lack of expert and expertise. Moreover, many projects have been executed under the terms and conditions of the contact which were found to be unilaterally in favor of the clients. The study, as part of effects to mitigate the claims that would possibly be caused by the potential problems with the typical turnkey projects, were intended to identify the elements of the claims virtually being occurred at the construction sites, and then analyze the degree of influence on the project so as to be able to incorporate the outcome into the plan at the working-levels. As a result of experts' review, through the survey, of the elements once extracted, those having relatively higher degrees of influence on turnkey projects were determined, and the investigation aimed at estimating the amount of claims in terms of value were conducted to eventually identify, evaluate and verify the elements that had affected the Project together with the degree of influence.