This CW(Construction wastes) are increasing as construction industry is growing, so many countries make efforts to recycle CW. Korea also made a stipulation for recycling CW. But the main content of this stipulation is for using recycled aggregates. Advanced countries try to increase reuse rate of not only recycled aggregate but also other kinds of wastes. So they are adopting SDM(separating dismantlement) method and we are also planning to make the system for SDM. This study is about SDM analysis through construction field investigation and difference analysis between SDM and UDM comparing predictive amount by UDM with real generated amount by SDM. First, the generated amount of construction wastes by SDM is more than estimated amount by UDM, and mixed waste was specially reduced more than UDM. The warehouse is easier than the office building to applicate SDM. But still there is no manual for SDM in the site, so establishment of SDM is demanded.
Korean Journal of Construction Engineering and Management
/
v.23
no.2
/
pp.33-44
/
2022
The simulation function by the 4D system is a representative BIM function in the construction stage. For the 4D simulation, schedule information for each activity must be created and then linked with the 3D model. Since the 3D model created in the design stage does not consider schedule information, there are practical difficulties in the process of creating schedule information for application to the construction stage and linking the 3D model. In this study, after extracting the schedule information of the construction stage using the HDBSCAN algorithm from the 3D model in the design stage, authors propose a methodology for automatically generating schedule information by identifying precedence and sequencing relationships by applying the topological alignment algorithm. Since the generated schedule information is created based on the 3D model, it can be used as information that is automatically linked by the common parameters between the schedule and the 3D model in the 4D system, and the practical utility of the 4D system can be increased. The proposed methodology was applied to the four bridge projects to confirm the schedule information generation, and applied to the 4D system to confirm the simplification of the link process between schedule and 3D model.
In the construction phase, the existing schedule management system by 4D CAD has been difficult to check for a status and progress of construction product in real-time because it simulates only VR (virtual reality) object based on a planned schedule. This study suggests a construction schedule management system by telepresence technique that can visualize progress status in real-time by using 4D CAD system based on remote monitoring. The telepresence methodology and system were developed in the study and they were verified for a railway construction project. The developed system can examine the status and progress of construction because it can compare 4D simulation based on planned schedule with real-time site images through web-camera.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.137-142
/
2001
The traditional schedule management system provides project manager with analysis reports, such as progress control, earned value management and resource management, including schedule chart. However, the reports and functions in the traditional system are still limited in 2D concept. Recently, the scheduling method is using 4D concept that time of construction schedule is linked to space of drawings. This study presents the limitation of those systems and an improved method for developing 4D system through the comparative analysis of representative 4D systems that are developed up to date.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.722-726
/
2006
Last Planner System (LPS) developed by Lean Construction Institute consists of four steps: Master Schedule, Phase Schedule, Lookahead Planning and Weekly Work Plan. This paper focuses on the process of measuring Percent of Plan Completed (PPC) at the Weekly Work Plan stage. PPC means the percentage of weekly assignments completed. According to the results of the researches that deal with PPC from many other countries, we can assure the benefits of using PPC. However, the concept of PPC is unfamiliar in Korea construction industry. This paper analyzes the cases in which PPC is applied in other countries and compares them with the production control system in Korean construction industry. The results of this research will provide the time management system for using PPC in Korea.
Proceedings of the Korean Institute of Industrial Safety Conference
/
1999.06a
/
pp.69-72
/
1999
공정상에서 화재 및 폭발위험을 최소화하기 위해서는 공정의 안전과 최적화조작이 이루워 져야 하는데, 우선 작업 조건하에서 취급물질의 연소특성치 파악이 필요하다. 화학공정에 있어서 설계의 요지는 공정모사 프로그램이다. 최근에는 공정모사 프로그램에 응용하기 위해 열역학적 물성치 데이터베이스 연구에 화재ㆍ폭발 특성치 연구가 활발히 진행되고 있다. 이는 공장을 건설하기 전에 안전성 평가가 이루어져야 하기 때문이다. (중략)
Bulletin of the Korean Institute for Industrial Safety
/
v.1
no.1
/
pp.40-48
/
2001
화학 공정 설계의 요지 가운데 하나는 공정모사 프로그램이다. 최근에는 공정모사 프로그램에 적용하기 위해 화재·폭발 특성치 연구가 활발히 진행되고 있다. 이는 공장을 건설하기 전에 안전성평가가 먼저 이루어져야 하기 때문이다. 이러한 안전성평가에 관한 관심은 더 정확한 자료뿐만 아니라 더 많은 성분에 대한 자료의 필요성을 증대시키고 있다. 공정에서 가연성물질을 취급에 있어 밸브의 조작실수, 배관접합부파손 등으로 인해 주위에 공기와 혼합되어 착화원에 의해 화재 및 폭발이 발생할 수도 있으며, 또한 유해물질이 유출되는 경우도 있다. 산업현장에서 화재 및 폭발의 위험을 최소화하기 위해서는 공정의 안전과 최적화 조작이 이루어져야 하는데, 이를 위해 우선 작업 조건 하에서 취급물질의 연소 특성치 파악이 필요하다.(중략)
Hong Young-Tak;Yu Jung-Ho;Lim Gyeong-Ho;Lee Hyun-Soo
Korean Journal of Construction Engineering and Management
/
v.6
no.2
s.24
/
pp.92-101
/
2005
The duration of highrise building projects is more shorter than its increasing of the numbers of floors. The project is liable to overrun of the time in which the project must be complete. AS highrise buildings are increased, time management has been reorganized as critical success factor. To improve time management, time management softwares are introduced and the software's education is made lively in construction company. However a large amount of time management works still have been based on not the software but scheduler's experience. We often can find the time overrun risk of highrise building because of the shortage of scheduler's experience. To diminish the mistake of the scheduler who does not have much experience, we suggested HRB Expert which uses expert's knowledge to make the time plan of highrise building. We made an example of knowledge acquiring and knowledge usage which cased on reinforced concrete work of highrise building by literature review and interview with scheduling expert. The precision of time plan will be enhanced and time overrun will be prevented on condition that HRB Expert is constructed and used
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.40
no.5
/
pp.403-412
/
2022
As the 4th industrial revolution is in full swing and next-generation ICT(Information & Communications Technology) convergence technology is being developed, various smart construction technologies are being rapidly introduced in the construction field to respond to technological changes. In particular, since the earth-volume calculation process for site design accounts for a large part of the design cost at the construction site, related researches are being actively conducted to improve the efficiency of the process and accurately calculate the earth-volume. The purpose of this study is to present a method for quickly constructing the topography of a construction site in 3D and efficiently calculating earth-volume using the results. For this purpose, the construction site was constructed as a 3D realistic model using large-scale aerial photos obtained from UAV(Unmanned Aerial Vehicle). At this time, since the constructed 3D realistic model has a surface model structure in which volume calculation is impossible, the structure was converted into a 3D solid model to enable volume calculation. And we devised a methodology to calculate earth-volume based on CAD(Computer-Aided Design and Drafting) using the converted solid model. Automatically calculating earth-volume from the solid model by applying the method. As a result, It was possible to confirm a relative deviation of 1.52% from the calculated earth-volume from the existing survey results. In addition, as a result of comparative analysis of the process time required for each method, it was confirmed that the time required is reduced of 60%. The technique presented in this study is expected to be utilized as a technology for smart construction management, such as periodic site monitoring throughout the entire construction process, as well as cost reduction for earth-volume calculation.
Korean Journal of Construction Engineering and Management
/
v.24
no.2
/
pp.50-58
/
2023
Bid-rigging is a common issue in public construction projects, and appropriate sanctions are required from the relevant authorities. This study analyzes the need for an optimal enforcement model to prevent bid-rigging by considering both civil and criminal aspects. Recently, there have been overlapping sanctions under the Fair Trade Act, such as fines imposed by the Fair Trade Commission and civil lawsuits filed by the client for damages. The purpose of this study is to evaluate the effectiveness of penalty surcharges and compensation systems for preventing bid-rigging, and to consider the possibility of overlapping sanctions in public construction projects. It was found that overlapping sanctions under the Fair Trade Act can be helpful in improving the system. However, in cases where the state is the plaintiff for damages in a lawsuit, it is necessary to consider the penalty surcharge and sentence, reduce the penalty surcharge for joint acts, refund the surcharge after a final judgment, and consider the damage compensation system when imposing a surcharge. This study contributes to the development of an efficient enforcement model to suppress bid-rigging in public construction projects by analyzing the improvement effects of sanctions and compensation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.