• Title/Summary/Keyword: 건설 가설재

Search Result 28, Processing Time 0.121 seconds

Cyclicality of Inter-Industry Wage Gaps and Segmented Labor Market Hypotheses (산업간 임금격차의 경기변동상 변화 패턴과 분단노동시장 가설)

  • Shin, Donggyun
    • Journal of Labour Economics
    • /
    • v.26 no.3
    • /
    • pp.77-114
    • /
    • 2003
  • Analyses of the special data sets constructed from the National Longitudinal Survey of Youth and the Panel Study of Income Dynamics reveal that, compared with an annual wage measure, survey week wages are significantly counter-cyclically biased due to selecting workers with strong labor market attachment. We also find that survey week wages are more counter-cyclically biased in high-wage industries than in low-wage industries, that is, inter-industry gaps of survey week wages are counter-cyclically biased. Unlike existing longitudinal studies, the current study concludes that real wages are much more procyclical in high-wage industries than in low-wage industries, which is attributed to our adoption of annual wages that is less subject to the selectivity bias. Our finding is consistent with the empirical regularity that real wages are much more procyclical for men than for women, as men are overrepresented in industries with greater real wage procyclicalities. Overall, current results do not support the predictions of segmented labor market theories for the cyclicality of real wages.

  • PDF

A Preliminary Study on the Reused Channel-Type Lining Board with Corrosion-Damage (부식 강재 복공판의 재사용성 평가에 관한 기초적 연구)

  • Kim, In-Tae;Kim, Dong-Woo;Choi, Hyoung-Suk;Cheung, Jin-Hwan
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.4 s.56
    • /
    • pp.170-179
    • /
    • 2009
  • Channel-type lining board(CLB) is a welded steel structure used in the field of open cut subway excavation and building basement construction. Lining board is generally installed at the underground environment which is exposed to corrosion factors such as humidity, temperature and corrosive gases. This study evaluates reusability of the corroded lining board by experimental and analytical method. Static loading tests were performed to know serviceability of corroded CLB after checking thickness loss of the used CLB parts. Strain of the plates and middle point deflection was measured simultaneously. According to experimental test results and comparison with numerical analysis, the thickness loss of the plates by corrosion makes more vertical displacements and stresses in members under the DB vehicle load considering impact factor. As a result, this paper is proposed a way to evaluate used and corroded CLB by checking the plates thickness and it makes construction engineers easy to know optimal time to replace their old CLBs with new one.

A Study on the Self-contained Earth Retaining Wall Method Using Bracing (브레이싱을 이용한 자립식 흙막이 공법에 관한 연구)

  • Kim, Jong-Gil
    • Journal of Digital Convergence
    • /
    • v.17 no.3
    • /
    • pp.205-213
    • /
    • 2019
  • In a construction site, excavation work has a close relation with temporary earth retaining structure. In order to build the underground structure most effectively in a narrow space, prevent soil relaxation of the external behind ground in excavation work, and maintain a ground water level, it is required to install a temporary earth retaining structure that secures safety. To prevent soil washoff in underground excavation work, the conventional method of temporary earth retaining structure is to make a temporary wall and build the internal support with the use of earth anchor, raker, and struct for excavation work. RSB method that improves the problem of the conventional method is to remove the internal support, make use of two-row soldier piles and bracing, and thereby to resist earth pressure independently for underground excavation. This study revealed that through the field application cases of RSB method and the measurement result, the applicability of the method for installing a temporary earth retaining structure, the assessment result, and displacement all met allowable values of measurement, and that the RSB method, compared to the conventional method, improved constructability and economy.

The Inclination Characteristics of PSC BOX in FCM Bridge Construction Method (FCM 교량 가설 공법에서 주두부의 기울음 특성)

  • Hyun-Euk Kang;Wan-Shin Park;Young-Il Jang;Sun-Woo Kim;Hyun-Do Yun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.3
    • /
    • pp.12-20
    • /
    • 2023
  • This study presents basic data on how to secure stability by analyzing the change in tensile force of steel rod and the inclination characteristics of PSC BOX in the "Temporary fixation system using internal prestressing tendon", which is mainly applied to construction of superstructures by FCM. To date, it has been difficult to confirm the changes in tension force of the steel rod and the inclination of the PSC BOX because the steel rod was installed vertically inside the pier and the PSC BOX. Therefore, measurement of the change in length of the steel rod and the displacement of PSC BOX were performed using a micro-measured FBG sensor. Comparisons of the calculated tensile force and the residual tensile force of the steel rod revealed that the safety factor decreased in all bridges. The cause was mainly identified to be the loss of tensile force in fixation~1segment, and countermeasures are suggested. The analysis of the inclination characteristics showed that the inclination increased with the segment progresses even in bridges with sufficient safety factor, and the difference before and after the segment was confirmed. In addition, the increase in inclination was related to the loss of tension force in the steel rod, and the stress on the opposite sides of the inclination was further reduced. It is believed that upward tensile force is generated in the steel rod on the opposite side of the inclined side due to the unbalanced moment, causing the difference in stress of the steel rod between the two sides.

Examination of Lateral Torsional Bucling Strength by Increasing the Warping Strength of I-Section Plate Girder with Concrete Filled Half Pipe Stiffener (콘크리트 충전 반원기둥보강재가 적용된 플레이트 거더의 뒤틀림 강도)

  • Cheon, Jinuk;Lee, Senghoo;Baek, Seungcheol;Kim, Sunhee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.5
    • /
    • pp.577-585
    • /
    • 2023
  • Lateral torsional buckling causessafety accidentssuch as collapse accidents during erection. Therefore, anaccurate safety designshould be conducted. Lateral torsional buckling canbe prevented by reinforcing the end orreducing the unbraced length. The method ofreducing the unbraced length by installing a crossframe has high material and installation costs and low maintenance performance.In addition, structuralsafety may be deteriorated due to cracks. The end reinforcement method using Concrete Filled Half Pipe Stiffeneris a method ofreinforcing the end of a plate girder using a stiffenerin the form of a semi-circular column. This method increasesthewarping strength ofthe girder and increasesthe lateral torsional buckling strength.In thisstudy, the effect ofincreasing the warping strengthof plate girders with concrete filled half pipe stiffeners was confirmed. To verify the effect, the results ofthe designequationand the finite element analysis were compared and verified through a experiment. As a result, the plate girderwithCFHPS increased thewarping strengthand confirmed that the lateral torsional buckling strength was increased.

An Experimental Study on the Performance and Field Application of Low Noise Beam-slab Formwork using Table Type Multi-stage Drop System (테이블형 다단 드롭 시스템을 이용한 저소음 보-슬래브 거푸집의 구성부재 성능 및 현장적용에 관한 실험적 연구)

  • Ryu, Hwa-Sung;Jeong, Woo-Jin;Kim, Deuck-Mo;Song, Seong-Yong;Shin, Sang-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.349-360
    • /
    • 2017
  • In concrete construction work, formwork is an important process that accounts for 10% of the total construction cost. Recent buildings are becoming bigger and higher. In order to maximize the efficiency and safety of this formwork, the system of formworking has been systematized. However, the human accidents and the noise complaints arise from dismantling processes frequently occur. In order to solve these problems, most of them are dependent on foreign technology, but they do not take into consideration the conditions of domestic construction site. In this study, we developed a table type multi-drop system form for a slab and beam which can improve the process, safety and reduction of disassembly noise, and evaluated the physical properties of the main members which are used in the system. The results of this study show that there is sufficient strength to be used as a slab and a laying material for both a yoke beam and a supporting post. The noise level is improved compared to existing method.

Stress Variation Characteristics of Temporary Fixed Steel Rod in FCM Bridge Construction Method (FCM 교량 가설 공법에서 임시 고정 강봉의 응력 변화 특성 )

  • Hyun-Euk Kang;Wan-Shin Park;Young-Il Jang;Sun-Woo Kim;Hyun-Do Yun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.3
    • /
    • pp.21-29
    • /
    • 2023
  • In this study, the stress characteristics of temporary fixed steel rods were analyzed in the "temporary fixing system using internal prestressing tension", which is mainly applied to the construction of superstructures by FCM. It was difficult to confirm the changes in initial tensile force in this system because the steel rod was internally connected to the pier and the PSC BOX. Therefore, measurement was performed before and after the completion of each segment using an FBG sensor to measure the change in the micro length of the steel rod. The results of the analysis showed that 75% to 90% of the maximum vertical contraction of the steel rod that occurred until the completion of the cantilever segment occurred in the fixing ~ 1segment, and the maximum loss of initial prestressing force was 39%. Such excessive loss of tension force to 1 segment means that tension is needed to improve the precision of construction during the fixation, and re-tension is needed to secure stability for conduction of cantilever segments after the completion of 1segment. In the 2 ~ last segment, the stress of the steel rod decreased gradually, and in the summer, the decrease in stress tended to partially recover due to the increase in the length of the steel rod corresponding to the increase in the vertical volume of PSC BOX. The dominant factor in the stress change in 2~ last segment in this phenomenon is judged to be the change in the length of the steel rod according to the temperature. Unlike the change in length, the relaxation was 1.2-2.7%, which was mostly offset by the opposite stress corresponding to the temperature stress. Therefore, a plan was proposed to improve the internal stress, such as adjusting the fixation time.

Construction Methodology for Chum-Sung-Dae Validation through the Present Configuration (첨성대 건립에 대한 시공방법론 첨성대의 얼개를 통한 논증)

  • Kim, Jang Hoon;Park, Sang Hun
    • Korean Journal of Heritage: History & Science
    • /
    • v.42 no.2
    • /
    • pp.40-61
    • /
    • 2009
  • A new construction methodology has been proposed on a scientific basis to reason a rational explanation for the structure and the present configuration of Chum-Sung-Dae. This is because there is no way to otherwise explain the gap between our expectation that the people in Shilla are assumed to be and the problems, such as the use of a temporary supporting structure including falsework, the use of a conveying device for stonework and the practice of soil fill, raised when the construction method in nowadays is applied to the structure. Furthermore, it is because the questions, such as the difference of an azimuth angle between the southward opening and the square podium, the skewed circular plan in layers of the body, misalignment between neighboring layers of the body, disagreement between the inclination due to slight sidesway and the eccentricity in each layer of the circular body, perfectly aligned vertical and horizontal joints and the existence of soil fill, raised from the present configuration of Chum-Sung-Dae, also require a reasonable explanation based on scientific evidences, if any. Therefore, the proposed new construction methodology, in which the soil hill outside as well as the soil fill inside the Chum-Sung-Dae may have been utilized as a temporary scaffolding system for construction, is the highly probable one that the builders of Chum-Sung-Dae might have inevitably employed. The existence of great tombs, scattered in Hwang-Nam-Dong close to Chum-Sung-Dae, implies that the people of Shilla might have accepted the proposed new construction methodology as a natural one.