• Title/Summary/Keyword: 건설참여주체

Search Result 124, Processing Time 0.022 seconds

Definition of an Integrated Contract Package for Application of Multi-Trade Subcontract System (다공종 통합발주방식 적용을 위한 통합공종 규명에 관한 연구)

  • Song Hyung-Suk;Kim Kyoon-Tai;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.385-388
    • /
    • 2002
  • The construction industry has complicated production processes with diverse disciplines and subcontractors, which is the major cause of lowered productivity. To solve this problem, multi-trade subcontract system is recently suggested. Some general construction companies have applied this method to some sections of work process. However, this is in the early stage of application. The purpose of this study is to define an integrated contract package for improving both contractor and subcontractor efficiency. First, this study recognizes construction company to need of multi-trade subcontract system. Finally, it suggests feasible activities which can be useful for a construction company to apply to this subcontract system.

  • PDF

Development of BIM-based CPLM System for Civil Project Management (토목 프로젝트 관리를 위한 BIM 기반 CPLM 시스템 개발)

  • Lee, Kwang-Myong;Lee, Chang-Woo;Han, Song-Yi;Kang, Hyoung-Seok;Noh, Sang-Do
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.24-29
    • /
    • 2011
  • BIM technology, based on 3D model of civil engineering structures, creates and manages information of the structures throughout four stages: Planning, design, construction, and maintenance. BIM is now used around the globe for improvement of the construction productivity. However, in order to expect the efficient engineering work, collaboration system between participants in a construction project is necessary. Therefore, in this paper BIM based CPLM (Construction project lifecycle management) system was designed and developed by analyzing the requirements of participants of a construction project. CPLM system offers an environment which enables the sharing and management of information according to the each stage of construction. CPLM is expected to aid cooperative decision-making during the overall construction process through the process innovation and the efficient data management.

업계소식 - 제3차 건설산업 공생발전위원회 개최 - 하도급 부당특약 유형 확대 및 산재은폐 강요 행위 근절 추진

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.258
    • /
    • pp.46-48
    • /
    • 2012
  • 국토해양부는 지난해 12월 23일 권도엽 국토해양부장관 주재로 제3차 건설산업공생발전위원회 회의를 개최했다. 건설산업공생발전위원회는 지난해 10월 출범 이후 그동안 3차례의 본 위원회와 11차례의 실무위원회를 개최하여 ${\bigtriangleup}$건설산업 이미지 제고 ${\bigtriangleup}$건설산업 참여주체간 공생발전 정착 ${\bigtriangleup}$건설산업의 경쟁력 제고 및 미래시장 창출 등을 위한 다양한 과제들을 발굴하여 검토해 왔다. 이번 회의에서는 이들 과제 중에서 중요성, 시급성, 파급효과, 이해관계자 간 합의도출 가능성 등을 종합적으로 고려하여 우선적으로 추진이 필요한 과제들을 선정하여 조속히 추진해 나가기로 했다.

  • PDF

Business Process Model for Urban Regeneration Project using BPMN Modeling Method (BPMN 모델링 방식을 활용한 도시환경정비사업 업무프로세스 모델)

  • Kim, Jae-Wook;Ryu, Han-Kuk;Son, Bo-Sik;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.41-50
    • /
    • 2010
  • From 2000s, the development to improve space use of urban area has been requested because of unorganized urban development in 1960~70s. For this reason Urban Redevelopment projects have been changed to urban regeneration project based on the renewed law. Recent urban regeneration Projects are bigger and more complex than ever. These kinds of projects need good communication between projects stakeholders, however there are problems in processing project for the lack of standardized business process. The purpose of this study is to provide common business process of urban regeneration projects for stakeholders to improve understanding project business process through analyzing association way of urban regeneration project and modeling business process by BPMN (Business Process Modeling Notation) method. And also it is expected to improve communication between stakeholders and to shorten project time through prompting project participation with the proposed business process.

A Model on the Feasibility Analysis for the Apartment Reconstruction (재건축사업의 타당성분석 절차의 모델링)

  • Jung Jung-Man;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.460-464
    • /
    • 2003
  • A reconstrucion project is very complex and requires technical knowledges and experiences, however due to not having any related knowledge consortium usually does not have any related knowledge. So in this study, we have suggested a systematic procedure to execute a reconstruction project focused on the profitability analysis. a model is developed to identify and calculate all relevant cost and revenue to the project using the IDEF0 methodology.

  • PDF

A Study on the Feasibility Analysis for the Reconstruction Apartment Projects (아파트 재건축사업의 타당성분석절차에 관한 연구)

  • Lee Jae-Young;Jung Jung-Man;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.267-272
    • /
    • 2001
  • The purpose of this study is to suggest the process and calculating method of feasibility study for the reconstruction apartment projects, and the results of this study is fundamental knowledge for the exact and exquisite plan. The process of this study are as following : 1. Research for the process and peculiar character of reconstruction project. 2. Investigate input and output item and suggest the calculating methods that are generally accepted. 3. Suggest the general process on feasibility study for reconstruction apartment project.

  • PDF

Reliability and Validation of the Measurement Tool of SSEIT Emotional Intelligence Model for Construction Worker (건설현장 근로자 SSEIT감성지능모델 측정도구의 신뢰도와 타당성검증)

  • Moon, Yoo-Mi
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.99-100
    • /
    • 2023
  • 최근 중대재해처벌법의 목적은 건설업 주체 구성원들의 안전불감증을 방지하기 위해 CEO의 안전참여 문화를 강조하고 있다. 선행연구에서는 리더의 감성 수준이 높을수록 업무 능력에 긍정적인 영향을 미치며, 감성능력을 요구하는 추세라고 주장하였다4). 본 연구에서 경영자 (CEO) 리더십 및 안전관리 연구에 사용할 수 있는 감성안전 측정으로 건전하고 간단한 EI 측정개발도구에 대해 신뢰도를 검증한다. Schutte Self-Report Emotional Intelligence Test (SSEIT)의 감정 조절 모델을 적용하면 리더와 안전관리자의 EI가 안전업무 수행과 태도에 긍정적인 영향을 미쳐야 한다. 또한 건설 안전관리 직업의 재해피해가능성스트레스 감정 노동이 EI-활용훈련 결과 감정조절이 가능하다는 것을 제안한다.

  • PDF

A Development of BIM Planning Framework for BIM Based Collaboration (BIM 기반 협업을 위한 BIM Planning 체계 개발 - 가상건설 연구단의 CPLM 시스템 중심으로)

  • Yoon, Su-Won;Kim, Seong-Ah;Chin, Sang-Yoon;Choi, Cheo-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.369-374
    • /
    • 2010
  • 최근 건설 산업에서 BIM이 각광 받으면서, BIM 기반의 다양한 엔지니어링 기술 도입 및 프로세스 적용이 시도 되고 있다. 이중 BIM 기반의 프로젝트 운영을 위해서는 BIM의 데이터의 저장, 수정, 배포뿐만 아니라, 관련 주체간의 협업이 가능한 환경이 요구되고 있으며, 이러한 환경 구축을 위해 제조업에서 활용되고 있는 PDM(Project Data Management) 또는 PLM (Product Life-cycle Management) 시스템을 벤치마킹한 CPLM (Construction Project Life-cycle Management)과 같은 BIM 기반 협업 시스템이 등장하고 있다. 하지만 기존의 이러한 협업 시스템의 경우, 건설 프로젝트가 가지는 다양한 계약 방식, 관리 단계, 관련 정보의 체계 등에 대한 종합적 계획 없이 프로젝트의 각 참여 주체들의 기존 관리 방식을 도입함으로써, 당초 BIM 기술을 도입하여 달성하고자 하는 원활한 협업 환경을 구축하는데 한계를 가지고 있다. 따라서 본 연구에서는 최근 BIM 가이드라인의 도입 등에서 시도되고 있는 BIM Planning이라는 개념을 활용하여, BIM 기반 협업 시스템의 구축 이전에 BIM을 관리하기 위한 관리 구조, 방식, 데이터 체계 등을 효과적으로 계획하고, 이를 시스템에 반영시킴으로써 보다 효과적인 BIM 기반 협업 환경이 구축될 수 있는 체계를 제안하였다.

  • PDF

A Study For An Improved BTL Project Delivery Method (BTL 사업주체별 문제분석과 해결방안에 관한 연구)

  • Kim, Chang-Duk;Park, Hye-Sin;Lee, Mun-Jae;Yu, Jeong-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.53-63
    • /
    • 2006
  • Since 2005, the government began to introduce and promote a new project delivery system, BTL(Build, Transfer, and Lease), in order to provide high level of public services for the upgraded quality of life and to boost the domestic and local construction economy. However, the lack of experiences in the new system by the constituents from diverse economic sectors brought a number of drawbacks from each constituent's perspective such as improperly low earning rate, excessive expenses for preparation of the project proposal, imbalanced regulations, heavy cost and procedures to establish SPC, the ineffective structure of the consortium, the short-term oriented evaluation criteria for the selection and so forth. These drawbacks turned out to be obstacles for the successful BTL projects. Hence, this paper analyzes the above issues and conducts the interviews with the professionals from the diverse sectors in order to propose the changes to resolve those for the improvement and finally to deliver the successful BTL projects for the diverse public owners.

A Study on the Risk Reduction of Real Estate Development Projects and Improvement Schemes of Main Participant's Role - A Case Study Focused on Housing Development Projects - (부동산 개발사업의 리스크 저감 및 사업 주체간 역할의 개선방안에 관한 연구 - 주택개발사업을 중심으로 한 사례연구 -)

  • Roh Jae-Hyun;Hwang Uk-Sun;Kim Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.135-143
    • /
    • 2005
  • The purpose of this study is to diminish the risk through identifying the risk factors occurring in the process of real estate development projects, and analyzing and coping with the risk factors, and enable stable advance in the development process by improving the roles and work distribution of the project investor. The results of this study are as follows : 1) identifying the risks of contractions from the step of selecting the sites must be made possible through supplemental human resources expertise in plan and construction of the operation 2) as an improvement scheme, heightening the penetration wall of development projects from the investors, proposing a registration law and a selection standard of construction companies to investors' cooperating companies enabling the growth of superior investors.