Analyzing Planning Performance of Road Construction Projects Using Preliminary Feasibility Analysis Data (예비타당성조사 결과를 활용한 도로건설사업의 계획단계 성과 분석 연구)

  • Mun, Junbu;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.3-11
    • /
    • 2023
  • According to the post evaluation scheme in Korea of a public construction project which is more than 30 Billion KRW, project performance is evaluated by investigating outcomes and effects of the construction after the completion of the project. The current post evaluation results can be used for planning and estimating a construction project in the future. However, it is not easy to utilized for an on-going project because the system does not provide the phase-based performance of a project. Although project planning performance is important for project initiation, few attempt has been made to evaluate planning performance in Korea. The purpose of this study is to provide a conceptual performance evaluation of planning performance using preliminary feasibility study conducted by Korea Development Institute. This study developed a planning performance database using data extracted from preliminary feasibility study reports of the completed 354 road construction projects. This study analyzed the performance of the planning stage of road projects by developing absolute metrics such as standard construction cost and standard construction schedule based on a Lane-Km. Using the standard construction cost and schedule metrics, the planning performance was analyzed by project characteristics. The results of this study can be used for phase-based performance evaluation from planning phase to construction phase.

A Study on Competency Evaluation and Improvement Plan of Electrical Construction Management Using Importance-Performance Analysis (IPA를 활용한 전기공사 건설사업관리 역량 평가 및 개선방안 연구)

  • Kim, Seungbeum;Byun, Jeongyoon;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.103-112
    • /
    • 2014
  • Since recent construction projects become larger and complicated, the level of difficulty of management skill is rising, and the risk is increasing accordingly so the necessity of improving management skill of projects is increasing. In order to solve this problem, Construction Management system was preferentially introduced in construction projects but in case of domestic construction industry, separate contracts by business boundary are being made so the actual state is that the function of the Construction Management system is not properly operated over the overall projects. The partial operation of Construction Management system like this may impose many restrictions on converged and combined projects such as smart grid and intelligent buildings etc. in the future. For improvement of management skill of domestic construction projects, the competence of project management skill by work areas that can overcome heterogeneity of the current project management skill shall be secured, and any factor that impedes cooperation ability shall be found and that shall be solved. Therefore, the difference of work competency of project management system of construction and electrical construction is to be analyzed by utilizing IPA model in this study, and a plan to introduce the project management system of electrical construction for efficient operation of projects is to be looked into.

The necessity of Program Management in Urban Regeneration (도시재생사업에서 종합사업관리의 필요성)

  • Kwon, Hae-Rim;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.583-586
    • /
    • 2008
  • As We experienced the onrush of industrialization, unplanned cities that had been grown rapidly are declining. The Urban Redevelopment is an alternative which is physical and functional improvement of declined cities. It has many types of undertaking by related law in Korea. But this undertaking has a problem. Whole designated district is separated several zones. And these zones are managed individually Therefore it has a difficulty to achieve overall goal of the urban redevelopment. The Urban Redevelopment should be managed over all. So we suggest application possibility of Program Management in Urban Redevelopment.

  • PDF

Research on the Plans of Construction Information for National Infrastructure in Public Construction Projects (공공건설사업에서의 국가기반시설 건설정보 서비스 방안에 관한 연구)

  • Ok, Hyun;Kim, Jin-Uk
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.12
    • /
    • pp.1026-1035
    • /
    • 2013
  • The construction field is implementing cost savings and business process improvements by adopting and applying various information technologies to secure the construction sector's technological competitiveness amid the economic recessions inside and outside South Korea. Therefore, affiliated agencies of the Ministry of Land, Infrastructure, and Transport are reinforcing transparency and efficiency in construction project management through informatization. These agencies are also performing construction project management and maintenance and management businesses by constructing various information systems to create higher added values and secure competitiveness. However, as the application of the constructed information system is limited to a portion of public construction projects, it is not yet possible to understand the whole status of the national infrastructures. Therefore, this paper aims to propose a construction information service plan, its future promotion method and procedure of application on the entire national infrastructures. This plan would be carried out by collecting, linking and fabricating the main construction information from the information systems of the affiliated agencies around the construction project information system(Construction CALS System) being applied at the organizations under the Ministry of Land, Infrastructure, and Transport. Such a plan is expected to facilitate effective project management and maintenance of public construction projects and serve as a useful tool for major decision making endeavors such as future policy planning. The proposed plan is also expected to facilitate the management and application of construction information from the construction up to the maintenance management of the national infrastructures.

Identifying Risks of Power Plant EPC Business in the Middle East and Analyzing their Priority by the AHP (중동지역 발전플랜트 EPC사업의 리스크 발굴 및 AHP분석방법을 통한 우선순위 도출)

  • Kim, Jongwoo;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.11 no.3
    • /
    • pp.32-45
    • /
    • 2015
  • 중동지역을 필두로 하여, 국내건설사들은 시공분야에서의 높은 경쟁력을 바탕으로 매년 놀라운 속도로 해외 플랜트 EPC 건설시장에서의 점유율을 높여 나가고 있다. 2012년에는 전 세계 건설시장의 8.1%를 점유하며, 이탈리아를 제치고 역대 최고인 세계 6위의 건설 강국으로서의 면모를 과시하기도 하였다. 그럼에도 불구하고, 그간 수주 자체를 목적으로 한 저가입찰 등과 같이 리스크를 간과한 무리한 수주는 폭탄의 뇌관을 건드리는 격이 되었고, 결국 2013년 일부 대형 건설업체들은 해외 사업장에서 대규모 손실을 경험하였다. 이와 더불어, 해외 대규모 EPC 플랜트 사업의 수주금액이 급증하여 한 개의 사업에서 발생되는 손실이 기업의 총체적 경영에도 큰 영향을 미칠 수 있게 됨에 따라, EPC 플랜트 건설사업의 잠재 손실의 원인을 최소화하고 건설사들의 지속적인 성장을 가능하게하기 위해서 리스크를 효율적으로 관리해야 하는 필요성은 더욱 증가하였다. 따라서, 본 연구에서는 해외건설시장 중, 중동지역에서 EPC 형태로 발주되는 발전플랜트 건설사업의 리스크 요인들을 발굴하고, AHP (Analytic Hierarchy Process) 기법을 사용하여 리스크 요인들 간의 우선순위를 정량적으로 도출하여, 국내건설사들이 중동지역의 EPC 사업수행 현장에서 효율적으로 리스크를 관리할 수 있도록 도움을 주고자 하였다.

  • PDF

Institutional Research for the Introduction of Construction Management at Risk in the Public Sector (시공책임형 CM의 국내 공공부문 도입을 위한 제도적 기반 수립 연구)

  • Park, Jiho;Kim, Kyungrai;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.20-28
    • /
    • 2021
  • The Domestic Construction Industry is in the process of changing from a one-sided production method centered on the contractor to a production method in which the order and the contractor can collaborate. Depending on the delivery method, the bid/success method, the contract method, and the degree of business involvement of the order may also vary. In this thesis, in order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bid process analysis, contract fulfillment and management analysis, post management analysis, and related laws and regulations for legalization In order to suggest a plan for the efficient operation of the system, a system and case analysis of domestic and international construction responsibility type construction project management was conducted. 'Construction Responsible Construction Project Management' defined in the Framework Act on the Construction Industry is divided into the main contract transfer contract, which is a service contract performing pre-con work, and the main contract, which is construction project management and construction contract. Therefore 'Construction Management at Risk' should be regarded as one of the ordering methods rather than a successful bid system, as in the case of overseas, and legalization as a bidding system equivalent to design/construction batch bid and technology proposal is necessary for introduction. In order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bidding process analysis, contract fulfillment and management analysis, and follow-up management analysis are conducted. A method for efficient operation was suggested so that it can be applied in the domestic market while maintaining the original merits of this system.

Effective Areas for DAT Utilization in Construction Projects (건설 사업관리 DAT 활용분야 및 적용방법 분석)

  • Seo, Keun-Sol;Park, Jong-Soon;Jung, Young-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.15-24
    • /
    • 2010
  • The managerial effort to acquire and maintain detailed construction control data has been the major barrier to improving the effectiveness of construction project management. Therefore, utilizing data acquisition technologies (DAT) can greatly improve the construction management processes by automating the data collection. Even though many researches attempted to explore the DAT utilization in construction, there has been no comprehensive study that examine the viability of DAT usage from a comprehensive perspective. In this context, the purpose of this study is to investigate the current efforts and future recommendation of DAT implementation in the construction industry.