Browse > Article
http://dx.doi.org/10.6106/KJCEM.2010.11.2.15

Effective Areas for DAT Utilization in Construction Projects  

Seo, Keun-Sol (토펙엔지니어링 CM사업본부, 명지대학교)
Park, Jong-Soon (토펙엔지니어링 CM사업본부, 단국대학교)
Jung, Young-Soo (명지대학교 건축대학 건축학부)
Publication Information
Korean Journal of Construction Engineering and Management / v.11, no.2, 2010 , pp. 15-24 More about this Journal
Abstract
The managerial effort to acquire and maintain detailed construction control data has been the major barrier to improving the effectiveness of construction project management. Therefore, utilizing data acquisition technologies (DAT) can greatly improve the construction management processes by automating the data collection. Even though many researches attempted to explore the DAT utilization in construction, there has been no comprehensive study that examine the viability of DAT usage from a comprehensive perspective. In this context, the purpose of this study is to investigate the current efforts and future recommendation of DAT implementation in the construction industry.
Keywords
construction projects; productivity; DAT(Data Acquisition Technology); Utilization;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Jaselskis, E.J. Gao, Z. and Walters, R.C. (2005). "Improving Transportation Projects Using Laser Scanning", Journal of Construction Engineering and Management, ASCE, 131(3), 377-384   DOI   ScienceOn
2 Chang, K.T. Chang, J.R. and Liu, J.K. (2005). 'Detecting of Pavement Distresses Using 3D Laser Scanning Technology", Proceedings of Computing in Civil Engineering 2005
3 이남수, 송제홍, 윤수원, 진상윤, 권숙욱, 김예상 (2006), "RFID와 무선네트워크 기술을 이용한 자재위치파악 방안", 한국건설관리학회 학술발표대회 논문집, 523-528
4 임문규 (2007), "첨단 IT기술을 활용한 고속도로 건설관리", U-건설 국제컨퍼런스
5 한재구, 권순옥, 조문영 (2007). 'RFID 기술을 활용한 건설현장의 노무관리시스템 프로토타입구축", 한국건설관리학회 학술발표대회 논문집, 853-858
6 한용우, 조훈희, 이유섭, 강태경, 김종선 (2004). "멀티미디어와 RFID 등 IT를 활용한 지능형 타워크레인 개발 기초연구" 한국건설관리학회 학술발표대회 논문집, 625-628
7 Esin, E. Burcu, A and Rafael, S. (2007). 'Tracking and Locating Components in a Precast Storage Yard Utilizing Radio Frequency Identification Technology and GPS", Automation in Construction, 16(3), 354-367   DOI   ScienceOn
8 Jung, Y. and Gibson, G.E. (1999). "Planning for Computer Integrated Construction." Journal of Computing in Civil Engineering, ASCE, 13(4), 217-225   DOI
9 Navon, R. and Goldschmidt, E. (2002). "Monitoring Labor Inputs: Automated-Data-Collection Model and Enabling Technologies", Automation in Construction, 12(2), 185-199
10 Peyret, F. Betaille, D. and Hintzy, G. (2000). 'High-precision Application of GPS in the Field of Real-time Equipment Positioning", Automation in Construction, 9(3), 299-314   DOI   ScienceOn
11 Sacksl, R. Navon, R. and Brodetskaia, I. (2006). "Interpretation of Automatically Monitored Lifting Equipment Data for Project Control", Journal of Computing in Civil Engineering, ASCE, 20(2), 111-120   DOI   ScienceOn
12 Kang, S. and Jung, Y. (2009). "Automated Progress Measurement for Construction Projects", Proceedings of the 3rd International Conference on Construction Engineering and Management (ICCEM-ICCPM 2009), 1068-1074.
13 Navon, R. and Goldschmidt, E. (2003). "Can Labor Inputsbe Measured and Controlled Automatically?", Journal of Contruction Engineering and Management, ASCE, 129(4), 437-445   DOI   ScienceOn
14 Navon, R. (2005). "Automated Project Performance Control of Construction Projects", Automation in Construction, 14(4), 467-476   DOI   ScienceOn
15 Sacks, R. Navon, R. and Goldschmidt, E. (2003). "Building Project Model Support for Automated Labor Monitoring", Journal of Computing in Civil Engineering, ASCE, 17(1), 19-27   DOI   ScienceOn
16 이재현, 박광호, 윤석헌, 백준홍 (2006). 'RFID/USN 기술을 이용한 건설재해 저감방안에 관한 연구", 대한건축학회 학술발표대회 논문집, 26(1), 605-608
17 이웅균, 조호규, 김광희, 강경인 (2005). "건축공사 흑막이 계측관리를 위한 유비쿼터스 시스템 구축 방안에 관한 연구", 한국건축시공학회 학술,기술논문발표회 논문집, 4(2), 67-70
18 Jaselskis, E.J. Anderson, M.R. Jahren, C.T. Rodriguez, Y. and Njos, S. (1995). "Radio-Frequency Identification Applications in Construction Industry", Journal of Construction Engineering and Management, ASCE, 121(2), 189-196   DOI   ScienceOn
19 Navon, R. (2007). ''Research in Automated Measurement of Project Performance Indicators", Automation in Construction, 16(2), 176-188   DOI   ScienceOn
20 Sacks, R. Navon, R. Brodetskaia, I. and Shapira, A. (2005). "Feasibility of Automated Monitoring of Lifting Equipment in Support of Project Control", Journal of Contruction Engineering and Management, ASCE, 131(5), 604-614   DOI   ScienceOn
21 이슬기, 전상민, 유정호, 김창덕 (2007). "건설폐기물의 적정 처리 및 관리를 위한 RFID기술 적용방안", 한국건설관리학회 학술발표대회 논문집, 774-780
22 이정호, 박성진, 오세욱, 김영석 (2002). "CPS 및 머신비전을 활용한 타워크레인 양중작업 효율화 방안", 대한건축학회 논문집, 18(11), 133-140
23 유지연, 최누리, 김창완, 김형관, 한승헌, 김문겸 (2007). 'RFID/USN 연동 시스템의 건설 산업 적용을 위한 성능 설험에 관한 연구", 한국건설관리학회 학술발표대회 논문집, 880-885
24 Navon, R. and Berkovich, O. (2005). 'Development and On-Site Evaluation of an Automated Materials Management and Control Moder', Journal of Contruction Engineering and Management, ASCE, 131(12), 1328-1336   DOI   ScienceOn
25 Navon, R. Goldschmidt, E. Shpatnisky, Y. (2004). "A Concept Proving Prototype of Automated Earthmoving Control", Automation in Construction, 13(2), 225-240   DOI   ScienceOn
26 Navon, R. and Shpatnitsky, Y. (2005). 'Field Experiments in Automated Monitoring of Road Contruction", Journal of Contruction Engineering and Management, ASCE, 131(4), 487-493   DOI   ScienceOn
27 한재구, 권순옥, 조문영 (2006). 'RFID 기술을 활용한 자재관리 시범시스템 구축 및 현장실험", 대한건축학회 논문집, 22(10), 121-128
28 Esin, E. Burcu, A. Bill, E. and Jeff, K. (2007). "Tracking Components and Maintenance History within a Facility Utilizing Radio Frequency Identification Technology", Journal of Computing in Civil Engineering, 21(1), 11-20   DOI
29 Navon, R. and Kolton, O. (2007). "Algorithms for Automated Monitoring and Control of Fall Hazards", Journal of Computing in Civil Engineering, 21(1), 21-28   DOI
30 장문석, 윤수원, 진상윤, 김예상 (2004). 'RFID를 이용한 커튼월 프로세스 관리방안', 대한건축학회 춘계학술발표대회 논문집, 24(1), 487-490
31 Jaselskis, E.J. and Elmisalami, T. (2003). "Implementing Radio Frequency Identification in the Construction Process", Journal of Construction Engineering and Management, ASCE, 129(6), 680-688   DOI   ScienceOn
32 Chin, S.y. Yoon, S.W. Choi, C.H. and Cho, C.Y. (2008). ''RFID+4D CAD for Progress Management of Structural Steel Works in High-Rise Buildings", Journal of Computing in Civil Engineering, 22(2), 74-89   DOI   ScienceOn
33 주현태, 김경환, 이윤선, 김재준 (2007). 'RFID/USN의 적용을 통한 건축물 관리방안', 한국건설관리학회 학술발표대회 논문집, 331-336
34 McCullouch, G. and Lueprasert, K. (1993). "2D Bar-Code Applications in Construction", Journal of Construction Engineering and Management, ASCE, 120(4), 739-752
35 Du, J. and Teng, H. (2007). "3D Laser Scanning and GPS Technology for Landslide Earthwork Volume Estimation", Automation in Construction, 16(5), 657-663   DOI   ScienceOn
36 Song, J.C. Haas, C.T. and Caldas, C.B. (2006). 'Tracking the Location of Materials on Construction Job Sites", Journal of Construction Engineering and Management, ASCE, 132(9), 911-918   DOI   ScienceOn
37 Caldas, G.H. Torrent, D.G. and Haas, C.T. (2006). "Using Global Positioning System to Improve Materials-Locating Processes on Industrial Projects", Journal of Construction Engineering and Management, ASCE, 132(7), 741-749   DOI   ScienceOn