DOI QR코드

DOI QR Code

Effective Areas for DAT Utilization in Construction Projects

건설 사업관리 DAT 활용분야 및 적용방법 분석

  • 서큰솔 (토펙엔지니어링 CM사업본부, 명지대학교) ;
  • 박종순 (토펙엔지니어링 CM사업본부, 단국대학교) ;
  • 정영수 (명지대학교 건축대학 건축학부)
  • Published : 2010.03.31

Abstract

The managerial effort to acquire and maintain detailed construction control data has been the major barrier to improving the effectiveness of construction project management. Therefore, utilizing data acquisition technologies (DAT) can greatly improve the construction management processes by automating the data collection. Even though many researches attempted to explore the DAT utilization in construction, there has been no comprehensive study that examine the viability of DAT usage from a comprehensive perspective. In this context, the purpose of this study is to investigate the current efforts and future recommendation of DAT implementation in the construction industry.

건설 사업관리의 자료 수집 및 분석에 있어 아직도 많은 부분이 현장관리자의 수작업에 의존하고 있다. 이런 수작업에 의한 관리 방법의 대표적인 문제점으로서는, 자세한 현장자료의 획득이 어려울 뿐만 아니라, 가능하더라도 이를 위해서는 상당한 비용과 노력이 소요된다. 따라서 효율적인 사업관리를 위한 첨단 DAT(Data Acquisition Technology) 기술이 적용을 통한 자료수집 자동화가 시도되고 있으나, 대부분 기존 연구가 단일 공종이나 혹은 일부 주요 관리만을 대상으로 한 DAT 적용 연구로 이루어져 프로젝트 전체관점에서 분석한 종합적 연구는 전무한 상태이다. 따라서 본 연구는 DAT를 건설 사업관리와 관련하여 포괄적으로 분석함으로써 활용분야를 살펴보고 대체 활용 방향을 제안한다.

Keywords

References

  1. 이웅균, 조호규, 김광희, 강경인 (2005). "건축공사 흑막이 계측관리를 위한 유비쿼터스 시스템 구축 방안에 관한 연구", 한국건축시공학회 학술,기술논문발표회 논문집, 4(2), 67-70
  2. 이남수, 송제홍, 윤수원, 진상윤, 권숙욱, 김예상 (2006), "RFID와 무선네트워크 기술을 이용한 자재위치파악 방안", 한국건설관리학회 학술발표대회 논문집, 523-528
  3. 이정호, 박성진, 오세욱, 김영석 (2002). "CPS 및 머신비전을 활용한 타워크레인 양중작업 효율화 방안", 대한건축학회 논문집, 18(11), 133-140
  4. 이재현, 박광호, 윤석헌, 백준홍 (2006). 'RFID/USN 기술을 이용한 건설재해 저감방안에 관한 연구", 대한건축학회 학술발표대회 논문집, 26(1), 605-608
  5. 이슬기, 전상민, 유정호, 김창덕 (2007). "건설폐기물의 적정 처리 및 관리를 위한 RFID기술 적용방안", 한국건설관리학회 학술발표대회 논문집, 774-780
  6. 임문규 (2007), "첨단 IT기술을 활용한 고속도로 건설관리", U-건설 국제컨퍼런스
  7. 유지연, 최누리, 김창완, 김형관, 한승헌, 김문겸 (2007). 'RFID/USN 연동 시스템의 건설 산업 적용을 위한 성능 설험에 관한 연구", 한국건설관리학회 학술발표대회 논문집, 880-885
  8. 장문석, 윤수원, 진상윤, 김예상 (2004). 'RFID를 이용한 커튼월 프로세스 관리방안', 대한건축학회 춘계학술발표대회 논문집, 24(1), 487-490
  9. 주현태, 김경환, 이윤선, 김재준 (2007). 'RFID/USN의 적용을 통한 건축물 관리방안', 한국건설관리학회 학술발표대회 논문집, 331-336
  10. 한재구, 권순옥, 조문영 (2006). 'RFID 기술을 활용한 자재관리 시범시스템 구축 및 현장실험", 대한건축학회 논문집, 22(10), 121-128
  11. 한재구, 권순옥, 조문영 (2007). 'RFID 기술을 활용한 건설현장의 노무관리시스템 프로토타입구축", 한국건설관리학회 학술발표대회 논문집, 853-858
  12. 한용우, 조훈희, 이유섭, 강태경, 김종선 (2004). "멀티미디어와 RFID 등 IT를 활용한 지능형 타워크레인 개발 기초연구" 한국건설관리학회 학술발표대회 논문집, 625-628
  13. Caldas, G.H. Torrent, D.G. and Haas, C.T. (2006). "Using Global Positioning System to Improve Materials-Locating Processes on Industrial Projects", Journal of Construction Engineering and Management, ASCE, 132(7), 741-749 https://doi.org/10.1061/(ASCE)0733-9364(2006)132:7(741)
  14. Chang, K.T. Chang, J.R. and Liu, J.K. (2005). 'Detecting of Pavement Distresses Using 3D Laser Scanning Technology", Proceedings of Computing in Civil Engineering 2005
  15. Chin, S.y. Yoon, S.W. Choi, C.H. and Cho, C.Y. (2008). ''RFID+4D CAD for Progress Management of Structural Steel Works in High-Rise Buildings", Journal of Computing in Civil Engineering, 22(2), 74-89 https://doi.org/10.1061/(ASCE)0887-3801(2008)22:2(74)
  16. Du, J. and Teng, H. (2007). "3D Laser Scanning and GPS Technology for Landslide Earthwork Volume Estimation", Automation in Construction, 16(5), 657-663 https://doi.org/10.1016/j.autcon.2006.11.002
  17. Esin, E. Burcu, A. Bill, E. and Jeff, K. (2007). "Tracking Components and Maintenance History within a Facility Utilizing Radio Frequency Identification Technology", Journal of Computing in Civil Engineering, 21(1), 11-20 https://doi.org/10.1061/(ASCE)0887-3801(2007)21:1(11)
  18. Esin, E. Burcu, A and Rafael, S. (2007). 'Tracking and Locating Components in a Precast Storage Yard Utilizing Radio Frequency Identification Technology and GPS", Automation in Construction, 16(3), 354-367 https://doi.org/10.1016/j.autcon.2006.07.004
  19. Jaselskis, E.J. Anderson, M.R. Jahren, C.T. Rodriguez, Y. and Njos, S. (1995). "Radio-Frequency Identification Applications in Construction Industry", Journal of Construction Engineering and Management, ASCE, 121(2), 189-196 https://doi.org/10.1061/(ASCE)0733-9364(1995)121:2(189)
  20. Jung, Y. and Gibson, G.E. (1999). "Planning for Computer Integrated Construction." Journal of Computing in Civil Engineering, ASCE, 13(4), 217-225 https://doi.org/10.1061/(ASCE)0887-3801(1999)13:4(217)
  21. Jaselskis, E.J. and Elmisalami, T. (2003). "Implementing Radio Frequency Identification in the Construction Process", Journal of Construction Engineering and Management, ASCE, 129(6), 680-688 https://doi.org/10.1061/(ASCE)0733-9364(2003)129:6(680)
  22. Jaselskis, E.J. Gao, Z. and Walters, R.C. (2005). "Improving Transportation Projects Using Laser Scanning", Journal of Construction Engineering and Management, ASCE, 131(3), 377-384 https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(377)
  23. McCullouch, G. and Lueprasert, K. (1993). "2D Bar-Code Applications in Construction", Journal of Construction Engineering and Management, ASCE, 120(4), 739-752
  24. Navon, R. (2005). "Automated Project Performance Control of Construction Projects", Automation in Construction, 14(4), 467-476 https://doi.org/10.1016/j.autcon.2004.09.006
  25. Navon, R. (2007). ''Research in Automated Measurement of Project Performance Indicators", Automation in Construction, 16(2), 176-188 https://doi.org/10.1016/j.autcon.2006.03.003
  26. Navon, R. and Berkovich, O. (2005). 'Development and On-Site Evaluation of an Automated Materials Management and Control Moder', Journal of Contruction Engineering and Management, ASCE, 131(12), 1328-1336 https://doi.org/10.1061/(ASCE)0733-9364(2005)131:12(1328)
  27. Navon, R. and Goldschmidt, E. (2002). "Monitoring Labor Inputs: Automated-Data-Collection Model and Enabling Technologies", Automation in Construction, 12(2), 185-199
  28. Navon, R. and Goldschmidt, E. (2003). "Can Labor Inputsbe Measured and Controlled Automatically?", Journal of Contruction Engineering and Management, ASCE, 129(4), 437-445 https://doi.org/10.1061/(ASCE)0733-9364(2003)129:4(437)
  29. Navon, R. and Kolton, O. (2007). "Algorithms for Automated Monitoring and Control of Fall Hazards", Journal of Computing in Civil Engineering, 21(1), 21-28 https://doi.org/10.1061/(ASCE)0887-3801(2007)21:1(21)
  30. Navon, R. and Shpatnitsky, Y. (2005). 'Field Experiments in Automated Monitoring of Road Contruction", Journal of Contruction Engineering and Management, ASCE, 131(4), 487-493 https://doi.org/10.1061/(ASCE)0733-9364(2005)131:4(487)
  31. Navon, R. Goldschmidt, E. Shpatnisky, Y. (2004). "A Concept Proving Prototype of Automated Earthmoving Control", Automation in Construction, 13(2), 225-240 https://doi.org/10.1016/j.autcon.2003.08.002
  32. Peyret, F. Betaille, D. and Hintzy, G. (2000). 'High-precision Application of GPS in the Field of Real-time Equipment Positioning", Automation in Construction, 9(3), 299-314 https://doi.org/10.1016/S0926-5805(99)00058-8
  33. Sacks, R. Navon, R. and Goldschmidt, E. (2003). "Building Project Model Support for Automated Labor Monitoring", Journal of Computing in Civil Engineering, ASCE, 17(1), 19-27 https://doi.org/10.1061/(ASCE)0887-3801(2003)17:1(19)
  34. Sacks, R. Navon, R. Brodetskaia, I. and Shapira, A. (2005). "Feasibility of Automated Monitoring of Lifting Equipment in Support of Project Control", Journal of Contruction Engineering and Management, ASCE, 131(5), 604-614 https://doi.org/10.1061/(ASCE)0733-9364(2005)131:5(604)
  35. Sacksl, R. Navon, R. and Brodetskaia, I. (2006). "Interpretation of Automatically Monitored Lifting Equipment Data for Project Control", Journal of Computing in Civil Engineering, ASCE, 20(2), 111-120 https://doi.org/10.1061/(ASCE)0887-3801(2006)20:2(111)
  36. Song, J.C. Haas, C.T. and Caldas, C.B. (2006). 'Tracking the Location of Materials on Construction Job Sites", Journal of Construction Engineering and Management, ASCE, 132(9), 911-918 https://doi.org/10.1061/(ASCE)0733-9364(2006)132:9(911)
  37. Kang, S. and Jung, Y. (2009). "Automated Progress Measurement for Construction Projects", Proceedings of the 3rd International Conference on Construction Engineering and Management (ICCEM-ICCPM 2009), 1068-1074.