A study on the method for the Integrated Cost Estimate based on Project(ICEP) of program management with typical model (기준모델을 사용한 종합사업관리용역비 산정방법(ICEP) 연구)

  • Baek, Myeongchang;Park, Junmo;Park, Gilbeom;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.119-128
    • /
    • 2015
  • Domestic dominant method in subcontract cost estimate for comprehensive program management is estimation by referencing similar cases or relying on the experience and expertise of the engaged. However, this method is not reliable due to lack of accuracy, making it harder for clients to plan and budget the program. Since budget itself is roughly estimated, it becomes a source of cost rise in the course of management due to design modifications. Therefore, the client and service providers shall calculate more accurate service cost by applying objective and scientific method in order to minimize cost rise and cost related dispute. Traditional cases, in estimating program management cost, took Top-Down approach based on precedents and experience. On the contrary, this study will categorize management structure into phases and activities, issue WBS for each phase to estimated schedule and cost for each code, and take Bottom-UP approach. By taking this approach named ICEP (Integrated Cost Estimate based on Project), Set project typical model will be developed for service cost estimating, calculate cost by applying project-specific factors. Also, by analyzing progress data and allocated management cost to complement them, more efficient construction management will take shape based on program management cost standards which reflect project-specific features.

Satisfaction Level and Performance Evaluation for CM Service in Korea (국내 건설사업관리 업무만족도 및 성과평가)

  • Kim, Won-Tae;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.108-117
    • /
    • 2013
  • The domestic CM business market has continued to grow, but its size is relatively small yet in comparison with the total size of the domestic construction industry. Evaluation of CM projects was conducted through questionnaire surveys. Both clients and CM firms showed positive satisfaction levels. Nevertheless, the clients' satisfaction levels were relatively low in safety management, cost management, and document and information management. Superior areas of CM tasks were time management and recovery scheduling, quality control and technical instruction, and design value engineering. On the other hand, inferior areas of CM tasks were claim analysis and dispute resolution, cost estimation, and life cycle costing. Both entities have agreed with the positive effects of CM involvement in terms of cost saving, time reduction, quality improvement, and safety incidents prevention to at least 0~5% extent.

Analysis of Defect Repair Cost by Work Type based on Defect Inspection of Apartments (공동주택의 하자진단에 기초한 공종별 하자보수비용의 분석)

  • Lee, Jin-Eung;Kim, Byung-Yun;Jeong, Byung-Joo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.5
    • /
    • pp.491-500
    • /
    • 2015
  • This study investigated defect status by work type, based on the report data of defect inspection results, acquired by consumers' request to safety inspection agencies, before the expiration of legal defect repair warranty period. In fact, the data was not acquired by centering on suppliers, namely, construction companies in relation with the defects becoming causes to increase construction cost of apartments. This study aims to provide objective and basic data for quality improvement at construction stage and for solution to defect disputes. The study results are presented below: (1) The number of defect cases occurring from architectural work among total work types were 1,986, defect occurrence rate was 62.5%, and defect repair cost was KRW $25,851/m^2$, which stood at 78.2% of the total work types. This means the defect occurrence rate and defect repair cost in architectural work are bigger than those of other work types. (2) Major defects in architectural work were revealed in the following order: cracks from frame work, inferior interior finishing work, inferior finishing work of plaster/masonry works, water leak/damage from waterproof work and withering/omission from landscape work. The total repair cost of the major selected defects was KRW $12,220/m^2$, and was analyzed to take up 37% of the total defect repair cost.

The Estimation of Construction Duration for High School Buildings Based on the Actual Data (실적자료에 의한 고등학교 시설 공기산정)

  • Kwon Dong-Chan;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.138-145
    • /
    • 2004
  • The construction duration for any building or facilities such as high school building influence the quality of the building as well as the total cost for them. Since there are no guidelines to estimate construction duration correctly, an employer(or owner) estimate it by their own experience or intuition. Therefore some conflicts related to construction duration happen between contract parties during construction. The purpose of this study is to suggest a predictive model which helps decision makers calculate exact net working days for high school building construction at the early stage of the construction project. To measure net working days for high school construction, 15 data were collected from actual spot in Incheon region. Multiple linear regression analysis was conducted to obtain the model which calculate construction duration for the substructure, the superstructure and the finishing works. total construction duration could be obtained by adding net working days to non working days which would be based on the meteorological statistics for Incheon region since 1974 to 2003.

Criteria for the Float Distribution (여유시간 분배기준에 관한 연구)

  • Lee Gul-Chan;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.509-512
    • /
    • 2003
  • The Critical Path Method(CPM) is an effective tool used for planning and scheduling. One of strong point in the CPM is what can calculate float. Float is able to prolong without having an effect on overall schedule of project, however concept and scope about ownership is not definite, because it is a by-product of project. Thus participants have had many dispute in using float because of their interests. In recent years, a few theories have evolved in an attempt to solve this problem. But the prior research did not make a reasonable distribution of float because their criteria of distribution was based on ratio for total project time. Actually, an application of float is achieved by participant's delay risk. Therefore. this paper proposes criteria for float distribution using delay risks, and the framework for the assessment of the delay risks.

  • PDF

A Study on the Present Condition about the Management of Repair and Long-term Maintenance Historical Data in the Rental Apartment (임대아파트의 수선 및 장기수선 이력 정보관리에 관한 실태조사연구)

  • Lee Chun-Kyong;Jung Young-Han;Son Sang-Jun;Hwang Young-Sam;Park Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.533-536
    • /
    • 2003
  • Tn improve the quality in apartment houses, it has regarded one of the most important steps as systematic maintenance. Also, repair and long-term maintenance have played an important role in maintenance of the rental apartment. Moreover, the historical data which come from these works have functioned as preventive maintenance in inspection and references in repair and long-term maintenance. To sum up, it would be necessary to get rid of the factors of dispute from sharing a variety of data among occupants, superintendents, and proprietors. Futhermore, it would be possible to show the management methods of repair and long-term maintenance historical data.

  • PDF

Development of Checklist to Prevent Claim through Dispute Case Analysis of Public Construction Projects (공공공사의 분쟁사례 분석을 통한 클레임예방 체크리스트 개발)

  • Shin, Chang-Joon;Kim, Yoon-Kyum;Cho, Kyu-Man;Hyun, Chang-Taek;Hong, Tae-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.13-22
    • /
    • 2011
  • Many studies on cause and prevention of claim have been carried out but they were mostly intended to come up with the improvement measures, improvement system or the measures to deal with the claim, which consequently lacked the substantial ways to identify the details of claim for prevention purpose. That is, there's in fact no tool, in preparation for potential claims, to identify and review the major potential causes at design stage to mitigate the claim and thus, it's necessary to develop the tool such as checklist needed to prepare the claim-supporting documents, check the relevant laws as well as to identify the cause of claim. Hence the study, given the fact that cause of claim is mostly generated at the design stage though the claim itself tends to occur at the construction stage, was aimed at developing the checklist based on contract document such as design documents at design stage for public construction projects in a bid to prevent the potential claim occurred at the design stage.

Comparative Analysis on Repairing Cost of Lawsuit on Concrete Crack Defect in Apartment Building (공동주택 하자소송의 균열하자보수비 비교.분석 연구)

  • Kim, Beop-Su;Park, Jun-Mo;Choi, Jeong-Hyun;Seo, Deok-Seok;Kim, Ok-Kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.142-150
    • /
    • 2011
  • Defect dispute has been increasing to claim by condominium, in increasing to demand and concern in value, quality, and management of apartment building since 2000s. In this study, for checking property of cost in crack issue with precedure of lawsuit on defect, it is analyzing details about repairing cost of concrete crack defect that formed 77 percent of repairing cost. Futhermore, it is studying of composition of repairing cost and difference of repairing cost by repairing method. This is checking details that cost growth has a difference whether court accept a acceptable range of crack width, and repairing method and reinforcement work has to choose between a surface treatment method, a filling method and a injecting method. Meanwhile, it is considerable that disparity of repairing cost whether is a method of painting work.

A Study on the Improvement of Total Cost Change Control in Private Investment Projects (민간투자시설사업에 있어 총사업비 변경관리의 개선방안 연구 - 고속도로 민간투자시설사업을 중심으로)

  • Kim Se-Jong;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.119-126
    • /
    • 2001
  • This paper analyzes problems related to total cost changes in private investment projects, and then proposes an improvement measure for the control of cost changes within the framework of the project management, contract, human resource, project communication, cost, and time management. From the viewpoint of contract management, the basis of cost change ought to be cleared up with standardization of related provisions in the concession agreement, and potentiality of change ought to be excluded with prescription of the private investor's leading role from the design phase. Regarding human resource management, this paper proposes a standard work flow granting much sovereign rights to private parts by putting restriction on work scopes of the entrusted authority of government, and transferring the rights of assignment, contract, and control about the responsible supervisor to the concessionaire. With regard to project communication management the notification of changes on drawings and technical documents ought to be automated and the realtime database ought to be established with DMIS (Drawings & Documents Management Information System). From the cost management point of view, this thesis integrates the control of cost-change-approved items and disapproved items to one cost breakdown system, and then harmonizes the actual progress with EVMS in time management.

  • PDF

A Study on Common/Private Borderline and Renovation of Apartment House (공동주택의 공사구분(共私區分)과 리모델링과의 관계에 관한 연구;한국과 일본의 공동주택 표준관리규약을 중심으로)

  • Lee, Jae-Sauk;Seo, Hyeong-Wook;Nam, Hye-Won;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.562-566
    • /
    • 2007
  • In apartment house renovation project, the project progress held up in perception gap or conflict of interest with residents as usual. These dispute occurs ambiguous borderline ordistinction of Common Useing) Parts and Exclusive Possessed Private Parts. The Maintenance Covenant now in force in Korea and Japan are considered in this paper about theses item. Summarizing the conclusion is as below. 1) In The Maintenance Covenantnow in force, in definition of Ownership, Utilization, Maintenance, Japan is more ostensive than Korea. 2) The Borderline of Common Using Parts with Exclusive Possessed Parts is [Inner line of Exterior Wall] in Korea and in Japan also. But in Korea it is not in unity in purpose and action or definition and description. 3) In Japan, the Subject of Ownership is defined with hierarchically, as Housing complex-residential Building-individual dwelling, But not in Korea. 4) In Japan, [Exclusively using Common Owned Parts] are defined, But not in Korea.