• Title/Summary/Keyword: 건설분쟁해결

Search Result 70, Processing Time 0.029 seconds

Analysis of Defect Repair Cost by Work Type based on Defect Inspection of Apartments (공동주택의 하자진단에 기초한 공종별 하자보수비용의 분석)

  • Lee, Jin-Eung;Kim, Byung-Yun;Jeong, Byung-Joo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.5
    • /
    • pp.491-500
    • /
    • 2015
  • This study investigated defect status by work type, based on the report data of defect inspection results, acquired by consumers' request to safety inspection agencies, before the expiration of legal defect repair warranty period. In fact, the data was not acquired by centering on suppliers, namely, construction companies in relation with the defects becoming causes to increase construction cost of apartments. This study aims to provide objective and basic data for quality improvement at construction stage and for solution to defect disputes. The study results are presented below: (1) The number of defect cases occurring from architectural work among total work types were 1,986, defect occurrence rate was 62.5%, and defect repair cost was KRW $25,851/m^2$, which stood at 78.2% of the total work types. This means the defect occurrence rate and defect repair cost in architectural work are bigger than those of other work types. (2) Major defects in architectural work were revealed in the following order: cracks from frame work, inferior interior finishing work, inferior finishing work of plaster/masonry works, water leak/damage from waterproof work and withering/omission from landscape work. The total repair cost of the major selected defects was KRW $12,220/m^2$, and was analyzed to take up 37% of the total defect repair cost.

Criteria for the Float Distribution (여유시간 분배기준에 관한 연구)

  • Lee Gul-Chan;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.509-512
    • /
    • 2003
  • The Critical Path Method(CPM) is an effective tool used for planning and scheduling. One of strong point in the CPM is what can calculate float. Float is able to prolong without having an effect on overall schedule of project, however concept and scope about ownership is not definite, because it is a by-product of project. Thus participants have had many dispute in using float because of their interests. In recent years, a few theories have evolved in an attempt to solve this problem. But the prior research did not make a reasonable distribution of float because their criteria of distribution was based on ratio for total project time. Actually, an application of float is achieved by participant's delay risk. Therefore. this paper proposes criteria for float distribution using delay risks, and the framework for the assessment of the delay risks.

  • PDF

A Study on the Applicability of the Crack Measurement Digital Data Graphics Program for Field Investigations of Buildings Adjacent to Construction Sites (건설 현장 인접 건물의 현장 조사를 위한 균열 측정 디지털 데이터 그래픽 프로그램 적용 가능성에 관한 연구)

  • Ui-In Jung;Bong-Joo Kim
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.12 no.1
    • /
    • pp.63-71
    • /
    • 2024
  • Through the development of construction technology, various construction projects such as redevelopment projects, undergrounding of roads, expansion of subways, and metro railways are being carried out. However, this has led to an increase in the number of construction projects in existing urban centers and neighborhoods, resulting in an increase in the number of damages and disputes between neighboring buildings and residents, as well as an increase in safety accidents due to the aging of existing buildings. In this study, digital data was applied to a graphics program to objectify the progress of cracks by comparing the creation of cracks and the increase in length and width through photographic images and presenting the degree of cracks numerically. Through the application of the program, the error caused by the subjective judgment of crack change, which was mentioned as a shortcoming of the existing field survey, was solved. It is expected that the program can be used universally in the building diagnosis process by improving its reliability if supplemented and improved in the process of use. As a follow-up study, it is necessary to apply the extraction algorithm of the digital graphic data program to calculate the length and width of the crack by itself without human intervention in the preprocessing work and to check the overall change of the building.

The Study on the Sustainable Sharing Plans of Military Installations for a Civil Military Co-existence (민군상생을 위한 지속가능한 군사시설 공유방안 연구)

  • Park, Young Jun;Son, Kiyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.110-117
    • /
    • 2016
  • This paper shows procedure and strategies to improve military facilities and local residents' welfare through a civil-military sustainable cooperation project. Military installations tend to impede urban developments, so that a few civil compliant have been often filed. Meanwhile, it is sometimes impossible to relocate military units due to their own unique purpose, even though they belong to core sites of civil developments, which are generally indispensible due to urban expansion, magnified road networks and so on. The solution to offset these conflicts between civil and military demands, which are associated with military units and urbanization surrounding them, is to establish sustainable strategies which enable both civil and military be beneficial. In this study, it is described, decision making procedure to make some facilities of a military unit be better as well as promote local residents' welfare through securing high-quality sports facilities. Delphi-technique and Paired Comparison Method are used to collect civil and military opinions regarding sustainable agreements. As a case study, a civil military cooperation project between a military unit and a local government is introduced. With successful projects, it is expected that the better installations could lead positive images of a military unit, provide advanced athletic environments for both local residents and military personnels, and lessen defense cost to maintain them. Moreover, this project will go down as a paragon of civil military sustainable cooperation.

A Study on Differentiation and Improvement in Arbitration Systems in Construction Disputes (건설분쟁 중재제도의 차별화 및 개선방안에 관한 연구)

  • Lee, Sun-Jae
    • Journal of Arbitration Studies
    • /
    • v.29 no.2
    • /
    • pp.239-282
    • /
    • 2019
  • The importance of ADR(Alternative Dispute Resolution), which has the advantage of expertise, speed and neutrality due to the increase of arbitration cases due to domestic and foreign construction disputes, has emerged. Therefore, in order for the nation's arbitration system and the arbitration Organization to jump into the ranks of advanced international mediators, it is necessary to research the characteristics and advantages of these arbitration Organization through a study of prior domestic and foreign research and operation of international arbitration Organization. As a problem, First, education for the efficient promotion of arbitrators (compulsory education, maintenance education, specialized education, seminars, etc.). second, The effectiveness of arbitration in resolving construction disputes (hearing methods, composition of the tribunal, and speed). third, The issue of flexibility and diversity of arbitration solutions (the real problem of methodologies such as mediation and arbitration) needs to be drawn on the Arbitration laws and practical problems, such as laws, rules and guidelines. Therefore, Identify the problems presented in the preceding literature and diagnosis of the defects and problems of the KCAB by drawing features and benefits from the arbitration system operated by the international arbitration Institution. As an improvement, the results of an empirical analysis are derived for "arbitrator" simultaneously through a recognition survey. As a method of improvement, First, as an optimal combination of arbitration hearing and judgment in the settlement of construction disputes,(to improve speed). (1) A plan to improve the composition of the audit department according to the complexity, specificity, and magnification of the arbitration cases - (1)Methods to cope with the increased role of the non-lawyer(Specialist, technical expert). (2)Securing technical mediators for each specialized expert according to the large and special corporation arbitration cases. (2) Improving the method of writing by area of the arbitration guidelines, second, Introduction of the intensive hearing system for psychological efficiency and the institutional improvement plan (1) Problems of optimizing the arbitration decision hearing procedure and resolution of arbitration, and (2) Problems of the management of technical arbitrators of arbitration tribunals. (1)A plan to expand hearing work of technical arbitrator(Review on the introduction of the Assistant System as a member of the arbitration tribunals). (2)Improved use of alternative appraisers by tribunals(cost analysis and utilization of the specialized institution for calculating construction costs), Direct management of technical arbitrators : A Study on the Improvement of the Assessment Reliability of the Appraisal and the Appraisal Period. third, Improvement of expert committee system and new method, (1) Creating a non-executive technical committee : Special technology affairs, etc.(Major, supports pre-qualification of special events and coordinating work between parties). (2) Expanding the standing committee.(Added expert technicians : important, special, large affairs / pre-consultations, pre-coordination and mediation-arbitration). This has been shown to be an improvement. In addition, institutional differentiation to enhance the flexibility and diversity of arbitration. In addition, as an institutional differentiation to enhance the flexibility and diversity of arbitration, First, The options for "Med-Arb", "Arb-Med" and "Arb-Med-Arb" are selected. second, By revising the Agreement Act [Article 28, 2 (Agreement on Dispute Resolution)], which is to be amended by the National Parties, the revision of the arbitration settlement clause under the Act, to expand the method to resolve arbitration. third, 2017.6.28. Measures to strengthen the status role and activities of expert technical arbitrators under enforcement, such as the Act on Promotion of Interestments Industry and the Information of Enforcement Decree. Fourth, a measure to increase the role of expert technical Arbitrators by enacting laws on the promotion of the arbitration industry is needed. Especially, the establishment of the Act on Promotion of Intermediation Industry should be established as an international arbitration agency for the arbitration system. Therefore, it proposes a study of improvement and differentiation measures in the details and a policy, legal and institutional improvement and legislation.

Analysis by Defensive Process Prerequisite and Offensive Cause of Action on the Merits of Lawsuit Cases in Urban and Housing Redevelopment - Based on Affirm-Rate and Staircase Matrix Tables - (도시정비사건 소송의 본안전항변사유와 본안쟁점사항에 관한 분석 - 인용률 및 행렬표식 분석기법을 활용한 -)

  • Kim, Yohan;Jung, Boseon;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.104-114
    • /
    • 2019
  • This study explored to analyze the winning determinants of the lawsuit cases on the urban and housing redevelopment project based on jurimetric methods. Based on affirm-rate and staircase matrix tables, 441 lawsuit judgments are analyzed. Research findings in affirm-rate analysis indicate that past legal relation, no own defect of accreditation, no ownership or association member status, lapse of period of litigation, and no legal interest are identified as higher rate in order for the reason for plea on the merit. And so are defect on calculation of consent rate, defect in relation with written consent, approval before zoning designation, defect in relation with general meeting, and defect on zoning designation for the issue on the merit. It is noteworthy from the staircase matrix table analysis that the criteria for affecting the lawsuit outcome is determined based on key forecasting variables such as past legal relation and no ownership or association member status. This study intends to provide the implication that the unnecessary disputes can be reduced in the urban and housing redevelopment project by the implementation of jurimetric quantitative analysis methodology from the perspective of empirical law.

An Examination of a Risk Assessment Method and Analysis of Defect Types of Apartment Finishing Works (공동주택 마감공사의 하자유형별 분석 및 위험성 평가 방법에 관한 연구)

  • Son, Seunghyun;Lee, Jae-hyeon;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.2
    • /
    • pp.249-260
    • /
    • 2024
  • In recent years, the proportion of medium and small-sized apartments within the housing market has seen a noticeable increase, alongside a corresponding rise in disputes related to construction defects. Such disputes are most prevalent in the finishing works phase of construction, which not only are frequent in occurrence but also impose significant repair costs. Furthermore, there is a noticeable scarcity of research focused on the quality management of finishing work defects prior to the completion of construction. Addressing this issue necessitates a methodology capable of preemptively identifying defects by analyzing their frequency and associated costs across various defect types. Consequently, the aim of this study is to propose a risk assessment methodology by conducting an analysis of defect cases across 3,299 apartment units, considering aspects such as frequency and severity. The outcomes of this research endeavor are expected to offer practical management strategies to enhance the quality of apartment finishing works and serve as an academic foundation for the enhancement of construction management systems pertaining to apartment finishing works.

Evaluation for Applying Low-Cost Mobile Laser System to Earth Volume Calculation at Construction Site (건설현장에서의 토공량산출을 위한 저가형 모바일 레이저시스템의 적용성 평가)

  • Kim, In Seop
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.30 no.6_1
    • /
    • pp.539-547
    • /
    • 2012
  • Volume survey for earthwork is conducted periodically at every month at large scaled construction sites for request payment for the construction. Currently, the earthwork volume is calculated on the overlapped drawing for two cross sections which were created by new and previous surveying data observed by GPS and TS. However the survey is required lots of time and expenses as it is a pin-point surveying method thus surveyors intend to get data only for the heavy undulated topographic features chosen by himself to save time and expenses. Consequently, it causes poor results due to low dense measurement as well as it's not matched with the results by another surveyors. As a result, the conflicts related in earthwork volume calculation often arises among the owner, contractors and sub contractors. In this study, we developed a method to get surveying data for fast and accurate volume calculation using 3D Mobile Laser System and conducted an application test. Also we carried out experiments for topographic survey using MLS to judge for the application additionally. The results showed that we could reduce a time for cross section survey from 48 hours to 2 hours and collected high dense data which have 0.2m interval instead of 3m interval compare with existing method. Also we could make a map which has high accuracy within 10cm in horizontal through topographic survey using MLS.

A Study on Method for Damage Calculation Caused by Bid Rigging in Alternative Tenders for Construction Projects -Utilizing the Difference of the Design Score & Bidding Rate as Factor - (건설공사 대안입찰 담합으로 인한 손해액 산정모델 연구 - 설계점수 및 투찰률 차이 인자 활용 -)

  • Min, Byeong-Uk;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.5
    • /
    • pp.741-749
    • /
    • 2018
  • The purpose of this study is to propose a rational and scientific damage calculation model in relation to damages caused by bid rigging in construction projects. Previous studies and precedents in relation to calculating damages from bid rigging suggest that the main issue was the lack of consideration in standards for deciding successful bids, selection of inadequate standard comparative markets, insufficiency in analyzing the appropriateness of competitive bid price influence factors, and absence of calculation model verification. In order to improve on these issues, a damage calculation method on alternative tenders for construction projects was proposed. For this calculation model, first, a standard market adequate to the successful bid selection standards was determined, second, an appropriate factor was selected by analyzing the correlation between competitive bid price influence factors, and third, a regression analysis was conducted on the selected factor. Lastly, this was demonstrated through verification of appropriateness, significance & normality of the proposed model and application of actual bid rigging cases. Through the proposed calculation model, this study seeks to serve as a base to prevent opportunity damages for parties involved in related court cases by early resolution of disputes and relief from issues of unfair damage burdens on a particular party.

Water resources planning for the Sesan and Srepok river basin in Vietnam using DSS-2S based on MIKE Hydro Basin (MIKE Hydro Basin 기반 DSS-2S를 활용한 베트남 Sesan 및 Srepok 강 유역 수자원 계획 수립)

  • Choi, Byung Man;Ko, Ick Hwan;Kim, Jeongkon;Pi, Wan Seop;Oh, Yoon Keun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.43-43
    • /
    • 2021
  • Sesan강과 Srepok강은 베트남, 캄보디아, 라오스가 공유하는 3S강 유역 (Sesan강, Srepok강, Sekong강)의 일부로 국제 공유하천으로 관리되고 있다. 3S강 유역은 Mekong강의 중요한 지류이며 Mekong강 유역의 상당 부분을 구성한다(Mekong강 유역 면적의 10%, 연간 총 유출량의 20%). 베트남에 속해 있는 Sesan강 유역면적은 11,255km2, Srepok강 유역면적은 18,162km2이다. Sesan강과 Srepok강의 상류는 베트남 중부 고원의 긴 산맥에 위치하고 있으며, 하류는 캄보디아에 위치해 있어 상·하류간 긴밀한 협력이 필요하다. Sesan강과 Srepok강 유역은 기후변화에 따른 홍수, 가뭄, 수력발전소 건설로 인한 유출량 변동에 따른 상·하류 분쟁, 사면침식 및 퇴적 등 많은 문제와 도전에 직면할 것으로 예측되고 있다. 본 연구에서는 World Bank의 "Viet Nam Mekong Integrated Water Resources Management (M-IWRM) Project의 일환으로 베트남 정부 차원에서 처음으로 구축한 수자원관리 의사결정지원시스템인 "DSS-2S"를 활용하여, Sesan-Srepok강 유역의 수자원 계획을 수립하였다. DSS-2S는 MIKE Hydro Basin을 기반으로 SWAT모델 등과 연계 하여 구축되었다. DSS-2S는 2S 유역의 모든 주요 하천과 지류를 반영하였으며. 여기에는 17개의 수력발전 댐과 주요 지류에서 용량이 3백만 m3 이상인 기타 저수지가 포함되었다. 이 보다 작은 용량의 저수지는 대표적인 저수지로 그룹화 되어 반영되었다. 기후변화 및 사회-경제적 발전계획 등을 반영하여, 2030년과 2050년을 목표연도로 생활, 공업, 농업, 관광, 유지용수 등 용수 수요를 추정하였다. 50% 및 85% 빈도의 공급 가능성을 고려하여 물 배분은 물 수요를 충족하고 지하수 개발 최소화를 기준으로 고려되었다. 분석 결과에 의하면 2S강 유역의 총 수자원은 32.2억 m3으로 그중 지표수자원은 29.2억 m3, 안정적으로 이용 가능한 지하수자원은 2.97억 m3으로 분석 되었으며, 지표수와 지하수 연계를 고려하면 전체 2S 강 유역에 물 부족하지는 않으나, 개별 공급 지점을 고려할 때 4월과 5월에 일부 지역에서 물 부족이 나타날 것으로 예측 된다. 장래 물 부족 해결을 위한 대안들을 제시하였으며, 본 성과는 베트남 중앙 정부의 장기수자원 종합계획 수립의 기본 자료로 활용 될 예정이다.

  • PDF