Blog-based Schedule Risk Management System (블로그 기반 공정리스크 관리시스템)

  • Jin, Soo-Myeong;Yoon, You-Sang;Jang, Myung-Hoon;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.47-56
    • /
    • 2009
  • As contemporary society becomes information-oriented, major construction companies have recently invested in information management, but small and medium ones have not. Though the small and medium companies recognize the information management is necessary and important, they don't have an ability to possess technical expertises. The purpose of this study is to develop a Schedule Risk Control System based on blogs using IT and web technologies for construction managers in small and medium construction companies. The system makes a chance to identify risk factors and prepare for responses to settle risks happened in preconstruction phases, and enables the managers and headquarters to predict and handle schedule risks by sharing information about risks on the blogs.

A Study on the Perceptions and Current Practices in Estimating Risk Cost of Contractor's Construction Budget - Focused on Building Projects - (종합건설사 실행예산 편성 시 리스크 비용 산정에 관한 인식 및 실태에 관한 연구 - 건축공사를 중심으로 -)

  • Choi, Jeong Won;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.13-24
    • /
    • 2022
  • Construction projects are exposed to various types of risks, which tend to increase. The increasing risks call for contractors' more attentions to forecasting and dealing with these risks. One of the measures to deal with contractors' risks is to forecast or estimate risk cost and include it in the construction budget. Although various researches in relation to risk cost have been observed, little attention has been paid to general contractors' perceptions and current practices in estimating risk cost of construction budget. The objective of the study is to identify and discuss key characteristics and implications based on the survey and analysis of general contractors' perceptions and current practices in estimating risk cost of construction budget. The study shows that there is a gap between the perception and the practice of estimating risk cost, that is, high perception of the importance of risk cost and a relatively low level of practice. It suggests that historical cost data, guidelines and corporate-level standard procedures are required to improve the current practice in addition to sufficient time allocations for risk cost estimating. It discusses that there is a need for using sophisticated estimating techniques including bid data analytics despite a low level of the current adoption, and also proposes that research and development in the field of the sophisticated estimating techniques should be further implemented in order to increase their practicality.

Identifying Risks of Power Plant EPC Business in the Middle East and Analyzing their Priority by the AHP (중동지역 발전플랜트 EPC사업의 리스크 발굴 및 AHP분석방법을 통한 우선순위 도출)

  • Kim, Jongwoo;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.11 no.3
    • /
    • pp.32-45
    • /
    • 2015
  • 중동지역을 필두로 하여, 국내건설사들은 시공분야에서의 높은 경쟁력을 바탕으로 매년 놀라운 속도로 해외 플랜트 EPC 건설시장에서의 점유율을 높여 나가고 있다. 2012년에는 전 세계 건설시장의 8.1%를 점유하며, 이탈리아를 제치고 역대 최고인 세계 6위의 건설 강국으로서의 면모를 과시하기도 하였다. 그럼에도 불구하고, 그간 수주 자체를 목적으로 한 저가입찰 등과 같이 리스크를 간과한 무리한 수주는 폭탄의 뇌관을 건드리는 격이 되었고, 결국 2013년 일부 대형 건설업체들은 해외 사업장에서 대규모 손실을 경험하였다. 이와 더불어, 해외 대규모 EPC 플랜트 사업의 수주금액이 급증하여 한 개의 사업에서 발생되는 손실이 기업의 총체적 경영에도 큰 영향을 미칠 수 있게 됨에 따라, EPC 플랜트 건설사업의 잠재 손실의 원인을 최소화하고 건설사들의 지속적인 성장을 가능하게하기 위해서 리스크를 효율적으로 관리해야 하는 필요성은 더욱 증가하였다. 따라서, 본 연구에서는 해외건설시장 중, 중동지역에서 EPC 형태로 발주되는 발전플랜트 건설사업의 리스크 요인들을 발굴하고, AHP (Analytic Hierarchy Process) 기법을 사용하여 리스크 요인들 간의 우선순위를 정량적으로 도출하여, 국내건설사들이 중동지역의 EPC 사업수행 현장에서 효율적으로 리스크를 관리할 수 있도록 도움을 주고자 하였다.

  • PDF

FREES : Fuzzy Risk Evaluation Expert System (Fuzzy 이론을 활용한 건설프로젝트 리스크 분석 및 평가 시스템)

  • Cho Ick-Rae;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.53-62
    • /
    • 2000
  • This study proposes FREES(Fuzzy Risk Evaluation Expert System) for analyzing and evaluating risks occurring during the construction process. The feasibility of this system model was tested by virtual scenario. For the development of the model, at first, risk breakdown structure was established based on risks identified in the existing researches, that is quantitative and qualitative. FREES can reflect human cognition process in the risk analysis and evaluation by adopting artificial intelligence fuzzy theory, differentiating the existing quantitative analysis model. The FREES can be applied to all the project phases from planning to operation & maintenance stage.

  • PDF

Development of a Risk Management Procedure Model for the Construction Project Using Construction Risk Management System (CRMS를 활용한 건설공사의 리스크관리 절차모형 개발)

  • Kim, Chang Hak;Kang, Leen Seok;Park, Hong Tae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4D
    • /
    • pp.423-432
    • /
    • 2010
  • This study suggested CRMS (construction risk management system) which is a new risk analysis model after analyzing existing risk management process for to guarantee a successful performance at the construction planning and work phase. CRMS is risk management procedures in order that the contractor identify, analyze and administrate the risk during performing construction project. This model may give much help to quantify and be ready the right managing methods about identified risk by the contractor. Especially, the most important and difficult things of all risk management may be to identify risk in the project. This study make more focusing on the developing a procedure that can identify risk more easily in the construction project. The risk is divided into global risk and local risk of a project. Also, this study suggests methods which are using the RBS (risk breakdown structure) related with WBS. This result will be useful as basic materials for developing computerizing system for risk management.

Cash flow Forecasting in International Construction Projects through Categorized Risk Analysis (특성별 리스크 분석을 통한 해외건설공사 현금흐름 예측에 관한 연구)

  • Yeom, Sang-Min;Han, Seung-Heon;Kim, Du-Yeon;Nam, Ha-Na;Park, Hee-Dae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.295-300
    • /
    • 2006
  • In this research, risk factors which can raise project cost are identified in the initial stage and picked out through the decision maker's baseline. And also this probable risks are implemented to the project cash flow to estimate the contingency and to build a risk management system in the level of project. The risks that affect the projects profits were classified in two categories in the risk checklist. Firstly, financial risks derived from the external economic conditions for example exchange rate, escalation, interest rates etc. are analyzed through the stochastic methods, Monte-Carlo Simulation. Secondly, the project individual risks which are come from the project characteristics, for example country risk, clime, owner etc., are evaluated using the utility curve of the decision maker. Finally these risk analysis methods are used to forecast the actual project cash flow and final profit.

  • PDF

Development of System Model for Risk Management (건설공사 리스크관리를 위한 모형 개발 연구)

  • Park Seo-Young;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.418-421
    • /
    • 2003
  • Most construction companies recognize the necessity of risk management. The practical application, however, is not easy because of the absence of systematic procedure for risk management and the difficulty in objectification of subjective risk factors. This study suggests a systematic procedure and a models. In the first place for those researches, this study analyzes the present condition of risk management in the construction industry. The developed model can be used as a risk management tool that enables evaluation of construction risk factors by quantified method, and it provides project managers with the methods to prevent risk and to deal with potential risk factors in the planning and construction phases. The results of this study could be used as references for related researches because this study attempts to develop a systematic tool for risk management including risk identification, risk analysis. risk action phases.

  • PDF

A Risk Management Method Using Fuzzy Theory for Early Construction Stage (퍼지이론을 이용한 초기 건설공사의 리스크 관리 방법)

  • Hwang Ji-Sun;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.136-143
    • /
    • 2004
  • This study presents a risk management methodology using fuzzy theory for early construction stage and is focused on risk identification and risk analysis. This study identifies various risk factors associated with activities clearly construction stage, then establishes the Risk Breakdown Structure(RBS) by classifying the risks into the three groups; Common risks, risks for Earth works, and risks for Foundation works. The risk analysis method presented in this study is based on the RBS that has two levels such as upper level and lower level. The risk exposure of lower level risk factors is assessed by fuzzy inference. The weight of risks is estimated by fuzzy measure. Then, the estimated risk exposures and weights are aggregated to assess the risk exposure of upper level risks by Choquet fuzzy integral. The risk exposure of upper level risks determine the priority of risk factors in view of risk management. This study performs case study to validate the proposed method. The result of case study shows that the methodology suggested in this thesis would be utilized well in evaluating risk exposure.

A Study on the Importance of Risk Factors for Effective Risk Management in the Pre-Project Planning Phase of the Development Projects (국내개발사업 사전기획단계에서의 효율적 리스크 관리를 위한 리스크 인자 중요도에 관한 연구)

  • Shin Kyu-Ho;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.75-86
    • /
    • 2002
  • The construction market is diversely changing because social environmental factors are rapidly transforming. Therefore, Construction projects are becoming complex and diverse. Furthermore, the risk being inherent in construction projects are increasing, and now people are considering about the risk management of construction projects in successfully handling the risk factor. The purpose of this study is first to comprehend the preparation of basic references for objective and systematic identification, categorization, and analysis of risk. Secondly it is to find the principle elements within the risk factors identified and categorized around planning process. Finally it is to manage objectively on the planning process, which forms a lot of uncertainty, in order to accentuate the importance about the risk of pre-planning process stage

Estimation of Key Risk Management Factors for Construction Projects Based on Kano Model (Kano 모델 기반 건설프로젝트 핵심 리스크관리 요인 도출)

  • Cho, Jin-ho;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.2
    • /
    • pp.239-248
    • /
    • 2022
  • Risks in construction projects are increasing remarkably due to recent changes in the construction environment. Active risk management is required to recognize risks as opportunities. The purpose of this study is to propose a risk management model of the importance determination method through comparative analysis using Kano model, Timko CSC (Customer Satisfaction Coefficient), and ASC (Average Satisfaction Coefficient). Based on previous studies, the validity of risk management factor determination is reviewed through a questionnaire modified Kano model through interviews with working-level workers using the Delphi technique. Through this, a suitable risk management model is presented by selecting key risk management factors recognized by domestic construction project practitioners. As a result of the study, the Kano model developed to verify risk management of construction projects was evaluated to be effective in verifying the risk management of practitioners. It is expected that the Kano model presented in this study will be actively used to verify the importance of risk management for construction projects.