Proceedings of the Korean Institute Of Construction Engineering and Management (한국건설관리학회:학술대회논문집)
- autumn
- /
- Pages.418-421
- /
- 2003
Development of System Model for Risk Management
건설공사 리스크관리를 위한 모형 개발 연구
- Published : 2003.11.01
Abstract
Most construction companies recognize the necessity of risk management. The practical application, however, is not easy because of the absence of systematic procedure for risk management and the difficulty in objectification of subjective risk factors. This study suggests a systematic procedure and a models. In the first place for those researches, this study analyzes the present condition of risk management in the construction industry. The developed model can be used as a risk management tool that enables evaluation of construction risk factors by quantified method, and it provides project managers with the methods to prevent risk and to deal with potential risk factors in the planning and construction phases. The results of this study could be used as references for related researches because this study attempts to develop a systematic tool for risk management including risk identification, risk analysis. risk action phases.
본 연구에서는 건설공사에서 발생할 수 있는 리스크 요인의 효율적 잔치론 위해 리스크관리 절차에 대해서 중점 검토하여 국내 실정에 가장 적합한 세부 리스크관리 절차를 제시하기 인한 모형을 개발한다. 본 연구에서 제시하는 건설공사 리스크관리 모형(CRMM, Construction Risk Management Model)은 리스크관리를 위해 리스크관리 준비단계부터 리스크 요인의 확인, 분석, 대응 및 관리단계의 총괄적인 작업을 수행하기 위한 모형으로 구축한다. CRMM에서는 리스크관리를 위한 3단계 모형(리스크 확인 모형, 리스크 분서 모형, 리스크 대응 모형) 구성으로 리스크관리 단계별 모형을 구축한다. 구축된 단계별 모형은 전산화의 기본 구성절차와 모듈 구성의 초기 자료로 사용되며, 기존 리스크관리의 세분화되고 전문화된 절차로 사용될 수 있다.