An Analysis on the Propriety of Labor Input at Design Stage in Construction Management (건설사업 관리에 있어서 설계이전단계의 인력투입 적정성 분석)

  • An, Yang-Hoan;Kim, Young-Ai;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.32-41
    • /
    • 2009
  • In the execution of construction management, such pre-design steps as a planning stage, a basic design stage, and a work design stage are regarded as more important than an actual construction stage. However, the manpower input criterion from the aspect of construction management price standard in the Construction Engineering Management Law does not attach weight to the pre-design stage. In this regard, the aim of this study was to examine the propriety of manpower input in the pre-design stage of construction management and then present an improvement strategy of it. For this, the investigator examined the criterion of service price prescribed in the Construction Engineering Management Law and then comparatively analyzed four sites of construction management services. Study findings are as follows: 1) the actual state of manpower input based on the stepwise average price criterion of construction management service is presented with such steps as the newly established planning step (6.6%), the basic design stage (3.9%$\rightarrow$5.6%), the practical design stage(7.6%$\rightarrow$13.5%), the construction stage (88.5%$\rightarrow$64.0%), and the newly established maintenance stage (10.3%). The average price criterion is classified by total construction expenses and calculated by improved rates and stage; and 2) the three-step criterion of the Construction Engineering Management Law is classified into five stages including the planning stage and the maintenance stage by dividing it with the stepwise construction businesses. Study findings show that the calculation of price criterion in the actual site of construction management services must be operated in a practical and flexible manner and the systematic improvement of stepwise manpower input must be carried out actually.

인천국제공항철도 건설사업관리 수행체계

  • Yoon Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.13-18
    • /
    • 2003
  • 국내 건설프로젝트의 대부분은 설계, 시공, 운영이 별도의 체계로 운영이 되이온 경향이 많은 바, 이를 개선하기 위해선, 기획단계에서 운영단계에 이르는 건설생애주기 단계별로 수행업무절차를 체계적으로 정립하여야 한다. 본 고에서는 이를 위하여 인천국제공항철도사업을 모델로 바람직한 대형공사에서의 사업관리 수행체계에 대하여 알아보았다.

  • PDF

A Study on Estimating Process of Conceptual Cost based on BIM at the Early Stage of Construction Project (건설 프로젝트 초기단계 BIM기반의 개략공사비 산출 프로세스에 관한 연구)

  • Jun, Yeong-Jin;Park, Do-Young;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.218-221
    • /
    • 2010
  • 발주자는 건설 프로젝트의 주요 의사결정을 초기단계에 내리게 되므로 정확한 예산을 예측하는 것이 중요하다. 그러나 건설 프로젝트의 대형화, 복잡화 그리고 건설산업계의 새로운 패러다임인 BIM(Building Information Modeling)의 등장에도 불구하고, 초기단계에서 정확한 공사비를 예측할 수 있는 표준화된 산출방법이 없어 아직까지도 대부분의 설계사무소에서는 실시설계단계에서 확정된 설계안에 따른 견적을 이용하며 초과된 비용에 대해 통합품질을 저해하는 행위를 통해 조정하고 있다. 초기단계에서 보다 정확한 공사비를 예측하므로써 발주자는 의사결정을 함에 있어 올바른 판단을 내릴 수 있으며, 이 단계에서 발생한 정보를 활용하여 이후 단계에도 유용하게 쓰일 수 있을 것이다. 본 연구에서는 발주자 의사결정 지원시스템 상에서 BIM기반으로 개략공사비를 산출할 수 있는 프로세스를 제안한다.

  • PDF

A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement (양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향)

  • Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.5-12
    • /
    • 2008
  • The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.

  • PDF

CM으로 효율적인 건설안전관리 체계구축 방안에 관한 연구

  • 김영수;안병수;강경식
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2002.05a
    • /
    • pp.23-30
    • /
    • 2002
  • 최근 우리나라의 건설산업은 Project의 규모가 대형화됨에 따라 기계화 시공 신공법 도입등 공정작업이 다양해지고 새로운 방법들이 많이 시도되고 있으며 건설산업도 기획, 설계, 발주, 시공, 유지관리라는 연속적 단계를 통하여 각 단계가 상호 유기적 연관성을 가지므로 건설현장의 근원적 안전성 확보를 위해서 건설 시설물의 Life cycle 전 단계를 걸쳐 안전관리 개념과 기법이 도입되어야 한다. 따라서 본 연구에서는 CM에 의한 단계로 안전성 확보에 주력하고 미국 CMAA의 단계별 기능별(phase, 6Function) 업무내용에서와 같이 Safety Management를 한다. 또한 CM제도 정착에 따른 초기단계를 규정하는 안전관리 법령 재정을 하여 단계적으로 자율적 안전 관리를 유도하여 재해예방을 하도록 해야한다.

  • PDF

Analyzing Planning Performance of Road Construction Projects Using Preliminary Feasibility Analysis Data (예비타당성조사 결과를 활용한 도로건설사업의 계획단계 성과 분석 연구)

  • Mun, Junbu;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.3-11
    • /
    • 2023
  • According to the post evaluation scheme in Korea of a public construction project which is more than 30 Billion KRW, project performance is evaluated by investigating outcomes and effects of the construction after the completion of the project. The current post evaluation results can be used for planning and estimating a construction project in the future. However, it is not easy to utilized for an on-going project because the system does not provide the phase-based performance of a project. Although project planning performance is important for project initiation, few attempt has been made to evaluate planning performance in Korea. The purpose of this study is to provide a conceptual performance evaluation of planning performance using preliminary feasibility study conducted by Korea Development Institute. This study developed a planning performance database using data extracted from preliminary feasibility study reports of the completed 354 road construction projects. This study analyzed the performance of the planning stage of road projects by developing absolute metrics such as standard construction cost and standard construction schedule based on a Lane-Km. Using the standard construction cost and schedule metrics, the planning performance was analyzed by project characteristics. The results of this study can be used for phase-based performance evaluation from planning phase to construction phase.

Environmental Impact Assessment of Agricultural Water Facilities using LCA Technique (전과정평가(LCA)기법을 이용한 농업수리시설의 환경영향 분석)

  • Kim, Young-Deuk;Choi, Yo-Han;Kim, Hae-Do;Jo, Jin-Hoon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.1656-1660
    • /
    • 2010
  • 저수지와 양수장은 우리나라에서 용수공급면적기준으로 전체 공급량의 78%를 차지하는 중요한 용수 공급시설이다. 본 연구의 목적은 저수지와 양수장의 환경영향을 LCA기법을 이용해 비교 분석함으로써 두 시설들의 환경영향을 정량적으로 평가하는데 있다. 연구대상 수리시설로서 경기도 안성에 위치한 이동저수지와 은산양수장을 선정하여 각각에 대하여 농업수리시설의 전과정평가를 실시하였다. 평가를 위하여 네덜란드 Pre사가 개발한 소프트웨어 Simapro 7.1를 이용하였다. 두 시설에 대한 원료물질 취득 단계부터 건설, 운영, 유지관리 및 폐기단계까지 전과정의 환경영향을 분석한 결과, 두 종류의 시설 설치에 따른 토지이용, 상 하류의 생태적 영향 등이 고려되지 않았지만 저수지에 의한 농업용수 공급이 양수장에 의한 용수 공급보다 환경친화적이라고 볼 수 있다. 저수지의 경우 건설단계의 환경영향이 크고, 양수장의 경우, 운영단계에 환경영향이 큰 것으로 분석되었다. 단계별로 환경영향은 저수지는 건설단계에 건설재료 예를 들어 레미콘, 시멘트 등이 환경부하를 크게 발생시키기 때문이고, 양수장은 이용 단계에서 용수공급을 위한 전력사용에서 기인하는데, 이는 전력생산시 화석연료와 같은 자원소비가 많기 때문이다. 이번 연구는 토목시설물중 농업 용수 공급시설의 전과정에서 환경영향을 종합적으로 평가하는데 LCA가 활용되었다는 점에서 의의가 있으며, 향후 하드웨어적인 시설뿐만 아니라 농업용수 공급에 따른 전과정평가를 수행하고, 농업용수 LCI D/B 구축에 기초자료를 제공할 수 있을 것으로 예상된다.

  • PDF

Development of Fairness Evaluation Index for the Construction Industry (건설산업의 공정성 평가지수 개발)

  • Lee, Chijoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.16-27
    • /
    • 2022
  • This study analyzed both the legal system regarding fair trade and the types of unfair trade in the construction industry. Then, it derived the factors with which to evaluate the level of fairness. These factors were classified by each type of participant in the construction industry, such as general contractors and subcontractors, and each construction stage, such as bidding, contracting, and construction. The perceived fairness level of factors was analyzed using a survey of 238 employees of general contractors and subcontractors. Next, the study developed a fairness index for the construction industry. The index showed that subcontractors perceived the level of fairness more negatively than general contractors, but both perceived the construction stage of the industry as having the lowest level of fairness. General contractors perceived the bidding and contracting stages as having the highest fairness levels, and subcontractors perceived the contracting stage as having the highest level of fairness. The developed fairness index identified the evaluation factors that need improvement and the fairness level perceived by each type of participant at each stage of construction. The results of this study can contribute to establishing measures that improve the level of fairness in the construction industry.

시스템정보-일반건설사, 현장관리시스템 구축(3)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.2 s.211
    • /
    • pp.56-60
    • /
    • 2008
  • 일반건설사들이 최근 시공 합리화를 통한 고부가가치 창출을 위해 건설현장의 전 과정을 데이터화한 정보시스템 개발 및 도입에 들어갔다. 건설사들이 선보인 현장관리시스템은 건설 프로젝트의 전 과정을 데이터화 및 공유하는 건설관리 정보화 시스템이다. 최근 들어 건설 산업의 전산화·정보화는 건설업무 진행 단계인 기획, 설계, 시공, 유지관리 절차에 따라 다양한 형태로 개발·활용되고 있다. 특히 시공단계에서 협력업체들 간의 다양한 정보공유로 불필요한 노동력 및 재정 낭비를 줄여 생산성 향상을 꾀하고 있다. 이번호에는 롯데건설(주)의 현장관리시스템을 살펴본다.

  • PDF

일반건설사, 현장관리시스템 구축(1)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.9 s.206
    • /
    • pp.42-45
    • /
    • 2007
  • 일반건설사들이 최근 시공 합리화를 통한 고부가가치 창출을 위해 건설현장의 전 과정을 데이터화한 정보시스템 개발 및 도입에 들어갔다. 건설사들이 선보인 현장관리시스템은 건설 프로젝트의 전 과정을 데이터화 및 공유하는 건설관리 정보화 시스템이다. 최근 들어 건설 산업의 전산화·정보화는 건설업무 진행 단계인 기획, 설계, 시공, 유지관리 절차에 따라 다양한 형태로 개발.활용되고 있다. 특히 시공단계에서 협력업체들 간의 다양한 정보공유로 불필요한 노동력 및 재정 낭비를 줄여 생산성 향상을 꾀하고 있다. 이번호에는 GS건설(주)의 현장관리시스템을 살펴본다.

  • PDF