• Title/Summary/Keyword: 건설관리프로세스

Search Result 573, Processing Time 0.023 seconds

A Study on the Establishment of Project Planning Process of the Commercial Builing Remodeling - Focused on the Small to Medium Scale Builings - (상업건축물 리모델링의 사업개발 기획단계에서의 프로세스 구축에 관한 연구 - 중${\cdot}$소규모 건축물 중심으로 -)

  • Kim Sung-Gi;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.642-645
    • /
    • 2003
  • The growth of Korea's construction industry is on the decrease, and it has caused the market of remodeling to be boosted up. But it's not that long people to get interested in the business of remodeling. So, the understanding and recognition in each remodeling process are not systematically formed yet and of which study and experience are insufficient as well, which may produce lots of problem after finishing these businesses. For resolving these problems, the make-up of remodeling process in the plan of operation will help us to reasonably and efficiently construct the basis of the business of remodeling which can be a way for efficient management and corresponded to national construction surroundings. The result of this study is as follows.

  • PDF

An Analysis of Core Competency of Construction Field Engineer for Cost Management (건설기술자의 원가관리 업무역량 분석 연구)

  • Choi, Jae-Hong;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.26-34
    • /
    • 2013
  • Recently, many companies recognize the individual human resource as a core asset of the corporate value creation and devote a lot of effort to develop and manage competency-based human resource in order to strengthen the corporate competitiveness. As the integrated construction company taking the major portion in Korean construction industry, its construction engineers perform the construction supervision task with various related parties at each stage of the life cycle of the construction project. Therefore, the competency of a construction engineer is an important factor which have a direct impact on the success of the construction project. However, the current capability evaluation scheme of the domestic construction engineers is mainly oriented on the qualification factors such as the certificates or the seniority and this is quite different from evaluating the actual ability for construction management tasks. In this point of view, this study proposes the appropriate level of proficiency in cost management by analyzing the work process and its detailed items of the cost management that is the one of the basic management items of the construction industry. Based on this, this study analyzes the current competency level of the construction engineer by comparing with the required competency of each job position and also performs the engineer's work competency analysis of each work step.

A Qualitative Analysis of Construction Projects From Supply Chain Management Perspective

  • Min Jung-Ung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.80-87
    • /
    • 2004
  • This paper presents an analysis of construction project management from supply chain management perspective to gain insight from all constituents and to identify areas of improvement. In order to suggest opportunities for improvement, interviews with the members of a typical urban office building project in US were held. Based on that, a qualitative analysis of construction projects is presented. Focusing on electrical and mechanical sub-systems, this study illustrates the roles of subcontractors, suppliers, distributors, and manufacturing representatives as well as the complexity that a general contractor fares in managing its supply chain. The author$^{\circ}\phi$s recommendations are focused on process restructuring and automation, which include some quantifiable performance measures, incentives, and their alignment with each other

A Study on Development for Construction Management System of Private Infrastructure Project (SOC민간투자사업의 CM 운영체계 개발에 관한 연구)

  • Park Young-Min;Kim Soo-Yong;Kim Dae-Young;Cho Hun-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.404-407
    • /
    • 2004
  • This Research suggested direction of development and analyzed necessity and given condition of CM(Construction Management) operation system of SOC private infrastructure project which is judged to grow up continuously from now on, Direction of development which is suggested in this research is largely there, (1)development of SOC private infrastructure project CM work standard process guide, (2)development of SOC Private Investment project feasibility study Performance standard, (3)checklist of SOC by stages and functionally private investment projects risk. Through this development, later we judge effect not only supply of a model case to artivate CM system but heightening of efficiency in domestic construction industry.

  • PDF

Development of Decision Model and Management System to minimize Pavement Utility Cut for Road Facility (도로시설 재굴착 방지를 위한 의사결정모델 및 관리시스템 개발)

  • Cho, Jin-Young;Jang, Oun-Sung;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.164-171
    • /
    • 2013
  • In urban planning, road facility is used not only for the transportation purpose but also for the utility line space purpose such as electrical, gas, tele communication, heating, water, sewer, and so on. However, since these utilities are built by many different groups, it becomes very difficult to communicate each other. Delay in one party can cause another party's schedule delay but they don't commuicate often. Also, some delay in utility work can cause frequent pavement cut. And, this will impact on construction cost, schedule delay, low quality, user complain and cost. This study developed spatiotemporal decision model to prevent prequent utility cut for mega project such as new urban development project. In addition, this study developed utility cut management system to manage utility cut schedule under pavement. Finally, developed system was applied to new urban development project and verified there effectiveness.

A Case Study of the Risk Identification in Construction Project (건설사업의 리스크 식별에 관한 사례연구)

  • Ahn, Sanghyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.15-23
    • /
    • 2015
  • In the construction industry, risk management has gained constant attention as the factor not only to evaluate global competitiveness of the country but also to secure competitiveness of public institutions and private companies. For effective construction risk management, the specific work process improvement that can be employed in the field in terms of risk management of the entire corporation such as financial, insurance and safety management is necessary. To manage construction risks, what is important is the step to identifying inherent risks in the construction project. The identification of risks will be followed by the step to seeking ways to establish and manage strategies responding to the risks. This study suggests ways and processes to make a checkslit to identify risks through case studies. To that end, the focus will be placed on working process improvement of risk identification among stages to manage construction risks such as risk identification and analyses, planning to respond to risks, risk monitoring and management. The case study checklists show that setting up the system to classify risks by stage is helpful to figure out causes of risks to reduce or eliminate risk factors. The checklist making process that considers features of the project is expected to contribute to successful completion of the project by enabling effective risk identification and systematic risk management.

Economic Evaluation of Eco-friendly Demolition Work and Case study in Remodeling Project (친환경 리모델링 철거공사의 경제성 평가 및 사례적용)

  • Kim, Yoon-Duk;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.45-53
    • /
    • 2010
  • When increasing quantity of construction wastes, how to deal with construction wastes and environmental problems relating to disposal of construction wastes are discussed as social issues, treatment of construction waste and subsidiary issues are raised as important problems. The demolition work produce construction wastes most in construction industry. Various researches on eco-friendly treatment of construction wastes, recycling rates and recycled materials were conducted aspect of sustainability in developed countries, however, domestic remodeling projects were performed demolition work with first-demolition and second-classification method which emphasize productivity focused on efficiency. It caused not only environmental problems, but also economical problems such as increasing disposal cost of construction wastes. Solving these problems, the previous study, suggested the process model of eco-friendly demolition work to recycle materials. This paper applied eco-friendly remodeling process to practical projects and economic feasibility on eco-friendly remodeling process. Moreover these results expect to contribute the revitalization of eco-friendly demolition work in remodeling projects.

A Plan for Better Productivity of Sub-Contractors through Improvements of Daily Reporting Process (작업일보 작성프로세스 개선을 통한 협력업체 생산성 향상방안에 관한 연구)

  • Kim Bong-Nyoun;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.375-378
    • /
    • 2002
  • Most construction works in a building site are progressed by many work categories and sub-contractors. Therefore there are many difficult things of management of construction-information because variable occurrences are happened to manpower and material resources. For this reason, various management systems are suggested, but the application of these systems are difficult because only construction company manages these systems and sub-contractor's participation, understanding and financial ability are insufficient. In addition to that, there are other problems such as lost information when it is carried, perversion and distrust of information by hand and lots of time and labor are necessary for collection, analysis, and management of information which are offered for daily report. so the purpose of this study is for improvement of reporting process with making an analysis of productivity effects and an analysis of function and problem of daily report. I intend to suggest the direction of improved daily report system for better productivity of construction work through input information and management of cooperation enterprises.

  • PDF

The Design and Construction Management of Exposed Concrete Finish Work through the Construction Process Analysis (노출콘크리트 마감공법의 시공 프로세스 분석을 통한 설계 시공관리 방안)

  • Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.160-170
    • /
    • 2005
  • Because designers want to express various elevation, architectural concrete has recently paid attention to finish material and has increasingly used in the construction. architectural concrete needs more careful and professional supervision works such as controling quality of color, texture, construction plan, and design plan. none the less, It is not clear to define process and manage methods for the construction life-cycle, which causes the expense to increase and the quality to be poor. this study will analyze concrete finish method by dividing three parts which are common, exposed and architectural concrete finish method. definition and the limit of application in architectural concrete finish method will be present by comparing three methods. Throughout an interview with a staff in charge and a case study, this paper shows the requirement and the keynote of management which are divided by three steps; the design, construction and maintenance. finally, this research provides management methods of individual steps for effective construction.

A Case Study on the Improvement of Real-Time Facility Safety Management Using Sensor (센서를 이용한 실시간 시설물 안전관리 개선에 대한 사례연구)

  • Choi, Suwon;Yoon, Yousang;Lim, Susang;Park, Yongbok;Suh, Sangwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.38-45
    • /
    • 2020
  • Presently, safety management of facilities is conducted as a site-oriented safety inspection, but depending on the facilities, there are difficulties in access to the site, and the cost and time of inspection are inefficient due to excessive reliance on human resources. Therefore, the necessity of sensor-based safety management is being raised to ensure the safety of the facility at all times, and various studies on sensor safety management are being conducted, but the research on verification of practicality is still insufficient. Therefore, the improvement points were presented through analysis of domestic and international studies, and additional processes for setting sensor attachment location and threshold were derived by analyzing the H city sensor safety management process, and practicality of sensor safety management was verified through sensor data measurement values. It is expected that efficient, sensor-based facility safety management will be possible if clear criteria and ongoing practicality verification for the additional processes presented in this study should be carried out in the future.