• Title/Summary/Keyword: 건설공사비

Search Result 585, Processing Time 0.021 seconds

An Experimental Study on the Performance and Field Application of Low Noise Beam-slab Formwork using Table Type Multi-stage Drop System (테이블형 다단 드롭 시스템을 이용한 저소음 보-슬래브 거푸집의 구성부재 성능 및 현장적용에 관한 실험적 연구)

  • Ryu, Hwa-Sung;Jeong, Woo-Jin;Kim, Deuck-Mo;Song, Seong-Yong;Shin, Sang-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.349-360
    • /
    • 2017
  • In concrete construction work, formwork is an important process that accounts for 10% of the total construction cost. Recent buildings are becoming bigger and higher. In order to maximize the efficiency and safety of this formwork, the system of formworking has been systematized. However, the human accidents and the noise complaints arise from dismantling processes frequently occur. In order to solve these problems, most of them are dependent on foreign technology, but they do not take into consideration the conditions of domestic construction site. In this study, we developed a table type multi-drop system form for a slab and beam which can improve the process, safety and reduction of disassembly noise, and evaluated the physical properties of the main members which are used in the system. The results of this study show that there is sufficient strength to be used as a slab and a laying material for both a yoke beam and a supporting post. The noise level is improved compared to existing method.

Process Planning for Finishing Works of High-rise Residential Buildings Project (고층 공동주택 마감공사의 공정계획 프로세스)

  • Baek, Tae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.110-117
    • /
    • 2017
  • In the construction of high-rise residential buildings in which the finishing works are done repetitively in each housing unit, the construction period and cost can be reduced, while maintaining the quality, if the work process is properly managed in order for the resources to be input continuously. Time management methods such as the Bar Chart, CPM and LOB are not appropriate, due to the difficulties involved in the diagraming of repetitive works and applying them to the project. The Tact method also has difficulties in maintaining a constant work flow and needs significant effort and cooperation from the subcontractors to allocate the resources consistently. Partitioning, base works for finishing, floor mortar plastering and the final finishing work are done sequentially in residential buildings projects, and there are many repetitive activities which differ in terms of the work method, work area and productivity. If these repetitive activities are synchronized or converged toward the last work area, the goal of process management can be achieved effectively. Therefore, a process planning method for the finishing works of residential building projects is proposed, which takes into consideration elements, such as the sequential relation between the activities in each housing unit and classification of repetitive works in terms of their management method, work area and production rate, for the continuous input of resources into the housing units.

Weathering Properties of Shale Aggregate in Daegu-Kyeongbuk region and Freezing-Thawing Characteristics of Concrete in response to Usage of Shale Aggregate (대경권 셰일 골재의 풍화특성 및 셰일 골재 사용량에 따른 콘크리트의 동결융해 특성)

  • Lee, Seung-Han;Jung, Yong-Wook;Yeo, In-Dong;Choi, Jong-Oh
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.8
    • /
    • pp.4033-4038
    • /
    • 2013
  • Sedimentary rocks from construction waste are discarded through open storage and landfilling, which causes an increase in construction cost and inefficient of execution of works. Some sandstone are selected and utilized as aggregates, but shale is buried as industrial waste. Therefore, in this research, we evaluated weathering properties of shale aggregate that is widely distributed throughout Daegu-Kyeongbuk region and freeze-thaw characteristics of concrete according to the replacement ratio of shale aggregate, in an effort to stabilize aggregate supply-demand in Daegu-Kyeongbuk region and develop alternative aggregates. We used red shale and black shale in the experiment, which were exported from a construction site in Deagu. We verified the usage of shale as a concrete aggregate by comparing andesite, which is broadly used as a thick aggregate for concrete, to hornfels, which is a metamorphic sedimentary rock. As a result of the experiment, we observed no degradation phenomenon for andesite and hornfels. However, a part of country rock containing black shale was found to be exfoliated. Red shale started having cracks in the direction of stratification after 1.5 months of direct exposure, and it broke into smaller pieces after approximately 4 months. After 300 cycles of freeze-thaw process on the concrete manufactured according to the replacement ratio of shale aggregate, the modulus of elasticity was 97% for plain and 95% for hornfels. In the case of RS_100, it was 57% after 210 cycles, and for BS_100, it was 54% after 240 cycles. Therefore, we established that, as the number of repetition increases, the freeze-thaw resistance decreases dramatically.

A Study of Loudspeaker Specifications by the Back Cavity and a change of Electrical Load (스피커의 후면기공과 입력부하의 변화에 따른 스피커의 음향특성)

  • Yon Ju-Bong;Yi Han-Ryang
    • Proceedings of the Acoustical Society of Korea Conference
    • /
    • autumn
    • /
    • pp.233-236
    • /
    • 2001
  • 일반적으로 스피커를 동작시키게 되면, 스피커 보이스 코일에 열이 발생하게 되고, 열에 의한 보이스코일의 저항의 증가가 나타나게 되는데, 기존의 연구는 저음용 스피커(Woofer) 만을 대상으로 스피커의 음향특성 변화들에 관해 수행되었다. 그러나, 현대의 스피커는 A/V시스템분야의 발전에 따라 고음재생의 충실도가 강조되고 있는 경향이므로, 고음용 스피커(Tweeter)에 대한 열 발생의 영향을 조사하였다. 본 연구에서는 고음용 스피커의 입력전력에 따른 특성 변화를 조사하고, 입력전력의 증가로 인한 보이스코일(voice coil)의 저항 증가에 따른 고음용 스피커의 특성변화에 관해 실험하였다. 그리고, 스피커의 진동에 의한 펌프(pump) 역할을 이용하는 냉각용 구멍을 뚫어 스피커의 특성변화를 검토하였다. 실험대상으로는 직경 25mm의 돔(Dome)형 진동판을 가진 고음용 스피커와 이 스피커의 후면 중심부에 구멍을 뚫어 열 방출구가 형성된 3종의 시료를 대상으로 특성변화를 비교$\cdot$측정하였다. 여기에서, 사용된 시료는 국내 Y사의 판매용 고음용 스피커로 제품의 원 상태인, 구멍이 없는 것을 기준시료로 하고, 이와 동일한 제품들의 후면에 각각 직경 5mm, 10mm, 15mm의 구멍을 가공하여 비교시료로 하였다. 기준 및 비교시료의 스피커 특성을, 한국산업규격 KS C 6027의 측정법에 따라, 입력 1W 상태에서 기준시료의 사양을 측정하였고[1], 입력을 0.5W, 1W, 2W, 4W, 8W, 16W로 가하여, 시료별 입력증가에 따른 스피커의 주파수 응답특성, 임피던스(Impedance), 조화 왜(Harmonic Distortion)의 변화율 측정을 통해 스피커의 특성변화 정도를 검토하였다. 향후, 본 연구의 결과는 고음용 스피커의 특성 열화에 대한 예측 및 개선 방안을 제시하는 기본 자료로 활용이 가능할 것으로 사료된다.용하여 현금흐름예측을 할 수 있는 Model을 제시하였다. 특히 건설공사의 현금흐름 예측의 중요한 요소인 Cash-Out에 대하여, 공사비 구성요소인 자재, 노무, 중기, 외주, 경비등 각 Resource의 보할(Weights)을 실 공사원가에 따른 보할의 변화와 Resource들의 Time Lag를 적용 기존 연구자의 Model과 다른 Model을 제시하였다. 또한 기존 연구자들의 Model과 비교하여 편리성, 정확도 및 신뢰성이 높은 Model임도 증명하였다.세대까지도 발현수준이 유지될 것으로 판단된다. 이러한 연구결과는 계통으로 확립된 형질전환 동물에 부여된 새로운 유전형질은 지속적으로 후대로 유전될 수 있음을 제시한다.잖⨀瘀Ā퀇Āゑ잖⨀Ā퀇Ԁ￿™잖⨀䌀Ā퀇ĀꄏĀꀏꄏĀꀏ₱?⨀Ā Ԁ￿䂱?⨀ऀĀ耀Ā삱?⨀؀Ā Ā?⨀ጀĀ耀Ā?돀ꢘ?⨀硩?⨀ႎ?⨀?⨀넆돐쁖잖⨀쁖잖⨀/ࠐ?⨀焆덐瀆倆Āⶇ퍟ⶇ퍟ĀĀĀĀ磀鲕좗?⨀肤?⨀⁅Ⴅ?⨀쀃잖⨀䣙熸ጁ↏?⨀

  • PDF

Case Study for Telecommunication Network Design based on Optimal Path Algorithm (최적경로 알고리듬을 활용한 경제적인 통신망 설계 적용 사례)

  • Jung, Ju-Young;Choi, Yun-Soo;Jun, Chul-Min;Cho, Seong-Kil
    • Journal of Korea Spatial Information System Society
    • /
    • v.8 no.1 s.16
    • /
    • pp.107-118
    • /
    • 2006
  • In this paper, several network algorithms were tested to find an optimal one for telecommunication network design. Algorithms such as Dijkstra's shortest path algorithm, Ford-Bellman's shortest path algorithm, Prim's minimum spanning tree algorithm, and Kruscal's minimum spanning tree algorithm were reviewed and compared in terms of feasibility and resulted network construction cost. Then an optimal algorithm that is most suitable for telecommunication network design was selected. For more specific and quantitative analysis of the selected algorithm, it was implemented to a real telecommunication network construction site. The analyzed results showed that the suggested design method when compared with the conventional one, reduced the network construction cost considerably. The total network length estimated by the conventional method were 5267 meters while the suggested method resulted in 4807 meters. Thus the new method reduced the total network length by 8.7 percent which is equivalent to 97,469,000 Won of construction cost. Considering the frequent telecommunication network constructions, due to new urban developments in the nation, the economic benefit of the suggested telecommunication network design method will be significant. In addition to the construction cost savings, the suggested telecommunication network design procedure possesses several other economic benefits. Since the design procedure can be standardized and automatized, it can reduce the design cost itself and the skill acquirement periods required for new or inapt design crews. Further, due to the standardized and automatized design procedure, any telecommunication network design results can accessed more objectively.

  • PDF

A Feasibility Study of Green Frame(GF) for the Implementation of Low-carbon Emissions & Long-life Housing (저탄소 및 장수명 공동주택 구현을 위한 Green Frame(GF)의 타당성 분석)

  • Hong, Won-Kee;Kim, Sun-Kuk;Kim, Hyung-Geun;Yoon, Tae-Ho;Yune, Dai-Young;Kim, Seung-Il
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.57-63
    • /
    • 2010
  • The bearing wall apartments which occupy the majority of multi-residential apartment buildings built in Korea, are known for having limited architectural plan flexibility, posing challenges in terms of maintenance and remodeling. The economic losses and environmental issues resulting from the reconstruction of bearing wall apartments are now accumulating to the extent that they are becoming a national concern. Multi-residential apartment buildings, which are now the dominant form of residence in Korea, must accommodate diverse customer needs and changes in life style. A new concept of Rahmen structure with architectural flexibility is Green Frame. GF multi-residence housing is expected to reduce construction costs and shorten the construction schedule by overcoming the shortcomings of conventional bearing wall apartments. This goal is consistent with the national policies that target the reduction of resource and energy consumption. In addition, GF will be established as a core contributor to achieving a reduction in $CO_2$ emissions, which will enable the sustainable growth of domestic construction industry, and address the low-carbon green growth drive implemented by the government.

Cost Allocation of River Water Quality Management Considering Development in Upper Basin and Total Pollution Load Management System (상류지역 개발과 오염총량관리제를 고려한 하천수질관리 비용분담 방안)

  • Yeo, Kyu-Dong;Kim, Gil-Ho;Jung, Young-Hun;Lee, Sang-Won
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.822-822
    • /
    • 2012
  • 본 연구는 상류의 개발행위와 더불어 현재 수질관리의 기준이 되는 오염총량관리제를 대상으로 '규모의 경제'의 논리를 따른다는 가정 하에, 지자체간에 협조를 통해 비용을 절감하여 서로 혜택을 볼 수 있도록 상 하류 지자체와 중앙정부 등 관련 당사자들 간의 비용배분 방안을 도출하는 것을 목적으로 하였다. 이를 위해서 광주광역시에 위치한 평동산업단지와 영본B, 영본C를 대상으로 광주, 전남, 중앙정부를 이해당사자로 하여 협조적 상황 하에서 대상 비용배분 문제를 정의하였고, 협조적 게임이론에 근거한 SCRB법 및 샤플리법을 적용하여 비용배분 결과를 제시하였다. 우선 광주와 전남이 각각 삭감해야 할 오염량을 산정하고, 해당 삭감량 만큼 처리하기 위한 하수처리시설의 규모를 설정하였다. 또한 하수처리시설의 건설비와 하수관거 공사비, 유지관리비를 산정하였으며, 하수처리시설의 내용연수인 20년간의 총비용을 2010년 현재가치 기준으로 산정하였다. 상 하류 지자체가 공동으로 대처할 경우 20년간 총비용은 416,311.8 백만원, 개별로 대처할 경우 464,439.6 백만원이며, 공동 대처가 42,359.3 백만원이 절감되므로 양 지자체 모두 협조적 게임에 응할 기본배경은 성립되었다. SCRB법에 의한 지자체별 비용배분율을 산정 결과, 광주 74.24%, 전남 25.76%로 산정되었으며, 2001~2010년 하수도 세입현황을 기준으로 중앙정부의 지원 비율은 10년간 최소 23.98%, 평균 29.22%, 최대 34.17%로, 각각의 비율별로 중앙정부, 광주, 전남의 비용분담액을 도출하였다. 본 논문에서는 개략적으로 비용을 산정하였으나 오염총량관리 사업은 막대한 예산을 필요로 하기 때문에 실제로 두 지자체가 협조하여 비용배분을 하게 된다면 하수처리시설의 수질개선효과, 하수처리시설 위치선정, 사업비용 등을 세밀하게 분석해야 할 것이다. 본 논문은 오염총량관리제에서 제시하는 목표수질을 대상으로 하였으나, 지자체의 정책에 따라 친수활동 증대와 생태 자연환경 개선 등과 같은 수질개선에 따른 간접적인 효과를 고려하여 오염 총량관리제의 목표수질보다 더 나은 수질을 원할 수도 있을 것이다. 협조적 게임의 상황을 복잡하게 하여 해결 가능성이 낮아질 수 있으나, 수질개선에 의한 다양한 효과를 편익으로 산정할 수 있다면 이를 협조적 게임에 적용하여 전반적인 수질개선에 대한 지자체의 적극적 활동을 유도할 수도 있을 것이다.

  • PDF

Analysis of Causes and Impact of Change Orders in the U.S. Military Construction Projects (미군 시설공사 설계변경 요인과 영향에 대한 연구)

  • Park, Insung;Kim, Harim;Lee, Hak-Ju;Kim, Do-Hyung;Min, Yoon-Gi;Cho, Hunhee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.3
    • /
    • pp.213-219
    • /
    • 2021
  • Change orders that occur frequently during the construction phase, af ect the construction performance in terms of cost, time, quality, safety and environment, and place a huge burden for stakeholders of given projects. This study analyzed the causes of change orders and their impact on the basis of 721 cases and a questionnaire of 164 domestic U.S. military construction participants in a total of 24 U.S. military projects. Important factors for change orders in the US military construction projects were engineering change due to design errors (348 cases, 48.3%), user requests change(86 cases, 11.9%), and different site conditions (69 cases, 9.6%). In addition, due to the change orders, construction cost increased by 6.56% on average and construction period was extended by 21.1% compared to the original schedule. As a result, it is anticipated that domestic construction companies can obtain a better understanding of change orders and construction performance, which may be difficult due to accessibility and limitations to military facilities. Also, it is proposed a successor study that guides in the right direction for the U.S. Military Construction.

An Experimental Study on the Structural Performance of Lateral Resistance in Steel Elevator Pit (강재엘리베이터 피트 측압저항 구조성능에 관한 실험적 연구)

  • Hong, Seong-Uk;Kim, Tae-Soo;Baek, Ki-Youl
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.3
    • /
    • pp.1-8
    • /
    • 2019
  • Steel elevator pit was developed for the purpose of minimizing the excavation, simplifying the construction of the frame and economical efficiency by improving the problems that occurred in the existing reinforced concrete. It is common to apply conventional RC method through excavation to underground structures such as underground floor collector well and elevator pit. In recent years, the use of steel collector well and steel elevator pits to reduce construction costs by minimizing the materials of steel and concrete has been continuously increasing. The steel elevator pit is an underground structure and then the performance of the welding part and the structure system is important. Specimen with only steel plate and concrete without studs could support the load more than 3 times than the specimen with deck only. Therefore, even if there is no stud, the deck (steel plate) rib is formed and the effect of restraining the steel plate and the concrete during the bending action can be expected. However, since sudden fracture in the elevator pit may occur, stud bolt arrangement is necessary for the composite effect of steel plate and concrete. It is expected that the bending strength can be expected to increase by about 15% or more depending with and without stud bolts.

Accuracy Evaluation of Earthwork Volume Calculation According to Terrain Model Generation Method (지형모델 구축 방법에 따른 토공물량 산정의 정확도 평가)

  • Park, Joon Kyu;Jung, Kap Yong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.1
    • /
    • pp.47-54
    • /
    • 2021
  • Calculation of quantity at construction sites is a factor that has a great influence on construction costs, and it is important to calculate accurate values. In this study, topographic model was created by using drone photogrammetry and drone LiDAR to estimate earthwork volume. ortho image and DSM (Digital Surface Model) were constructed for the study area by drone photogrammetry, and DEM (Digital Elevation Model) of the target area was established using drone LiDAR. And through accuracy evaluation, accuracy of each method are 0.034m, 0.35m in horizontal direction, 0.054m, 0.25m in vertical direction. Through the research, the usability of drone photogrammetry and drone LiDAR for constructing geospatial information was presented. As a result of calculating the volume of the study site, the UAV photogrammetry showed a difference of 1528.1㎥ from the GNSS (Global Navigation Satellite System) survey performance, and the 3D Laser Scanner showed difference of 160.28㎥. The difference in the volume of earthwork is due to the difference in the topographic model, and the efficiency of volume calculation by drone LiDAR could be suggested. In the future, if additional research is conducted using GNSS surveying and drone LiDAR to establish topographic model in the forest area and evaluate its usability, the efficiency of terrain model construction using drone LiDAR can be suggested.