A Comparative Study of the Productivity through the Cost of the Precast Span Method(PSM) and Movable Scaffolding System(MSS) -By the Central Example of Company H on the Korea Train Express (KTX) (공사비 비교를 통한 Precast Span Method(PSM) 공법과 Movable Scaffolding System(MSS) 공법의 생산성 연구 -경부고속철도 H사의 사례를 중심으로)

  • Lee Tai Sik;Lee Sung Hyun;Kim Gil Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.535-540
    • /
    • 2001
  • In the early construction phase of the Korea Train Express (KTX), the Movable Scaffolding System (MSS) for the top structure of the bridge was the predominant construction method. But the method had to be changed due to arising problems and an alternative method had to be found. Company H that participated in Korea Train Express construction project achieved excellent results of performance through the introduction of the Precast Span Method (PSM), which has been previously successfully employed in foreign express train projects. This study intends to verify the superior performance of PSM over MSS in the KTX construction process by conducting a comparative analysis on PMS and MSS based on the field experience of company H. This study will not only help to understand PSM, which is expected to expand its future scope of application, but also contribute to solve the problems of PSM that occurred during the construction phase.

  • PDF

3D Digital Design Optimization Process Considering Constructability of Freeform Structure (비정형 구조물의 시공성을 고려한 3차원 디지털 설계 최적화 프로세스)

  • Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.35-43
    • /
    • 2013
  • Nowadays the widely used media in architecture include visualizations, animations and three-dimensional models. 3D digital methods using active CAM(Computer Aided Manufacturing) and CNC(Computerized Numerical Control) imaging have been developed for accurate shape and 3D measurements in freeform buildings. In contrast to a conventional building using auto CAD system and others, the proposed digital optimization method is based on a combination of 3D numerical data and parametric 3D model for design and construction. The objective of this paper is therefore to present digital optimization process for constructability of freeform building. The method can be useful in the effective implementation of an error-proofing process of freeform building during design and construction phase. 3D digital coordinate data can be used effectively to identify correct size of structural and finish members and installation location of each members in construction field. In addition, architects, engineers and contractors can evaluate design, materials, constructability and identify error-proofing opportunities. Other project participants can also include representatives from all levels of management, departments as well as workers and key subcontractors' personnel, if necessary. The 3D digital optimization process is therefore appropriate to serious variations in freeform shape. For future study, the developed digital optimization method is necessary to be carried out to verify the robustness and accuracy for constructability in construction field.

A study on the effective operation&selection of the BTL project (BTL사업자의 효율적인 선정 및 운영에 관한 연구)

  • Kim, Kyung-Suk;Choi, Moon-Bok;Cho, Young-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.599-602
    • /
    • 2007
  • To enhance the competition of National power, the investment of SOC is an essential factor for infrastructure construction. The capital for SOC is so gigantic and the national finance is limited, engagement of various subject is necessary. So, Government is promoting the private sector to invest capital in SOC development. Nevertheless the increasement of SOC investment, various problems were issued in selection & operation of BTL. Therefore, to raise the probability of success for BTL project, escalation, unification and specialization of BTL affairs, BTL selection process were suggested in this study.

  • PDF

A Study on the Benefit cost Analysis of the Safety Cost in Construction Work (건설공사의 안전관리비 사용에 대한 투자효과 분석에 관한 조사 연구)

  • 이영섭;김남훈;박종근
    • Journal of the Korean Society of Safety
    • /
    • v.16 no.3
    • /
    • pp.111-116
    • /
    • 2001
  • This study is conducted to review the ratio of direct and indirect cost accompanied by industrial accident in construction sites. It is surveyed that how to use safety cost in construction work is most efficient in comparison with several items of safety cost through the regression analysis.

  • PDF

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.

Process Planning for Finishing Works of High-rise Residential Buildings Project (고층 공동주택 마감공사의 공정계획 프로세스)

  • Baek, Tae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.110-117
    • /
    • 2017
  • In the construction of high-rise residential buildings in which the finishing works are done repetitively in each housing unit, the construction period and cost can be reduced, while maintaining the quality, if the work process is properly managed in order for the resources to be input continuously. Time management methods such as the Bar Chart, CPM and LOB are not appropriate, due to the difficulties involved in the diagraming of repetitive works and applying them to the project. The Tact method also has difficulties in maintaining a constant work flow and needs significant effort and cooperation from the subcontractors to allocate the resources consistently. Partitioning, base works for finishing, floor mortar plastering and the final finishing work are done sequentially in residential buildings projects, and there are many repetitive activities which differ in terms of the work method, work area and productivity. If these repetitive activities are synchronized or converged toward the last work area, the goal of process management can be achieved effectively. Therefore, a process planning method for the finishing works of residential building projects is proposed, which takes into consideration elements, such as the sequential relation between the activities in each housing unit and classification of repetitive works in terms of their management method, work area and production rate, for the continuous input of resources into the housing units.

A Study on Risk Factor Identification by Specialty Construction Industry Sector through Construction Accident Cases : Focused on the Insurance Data of Specialty Construction Worker (건설재해사례 분석에 의한 전문건설업종별 위험요인 탐색 : 전문건설업 근로자 공제자료를 중심으로)

  • Lee, Young Jai;Kang, Seong Kyung;Yu, Hwan
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.24 no.1
    • /
    • pp.45-63
    • /
    • 2019
  • The number of domestic construction company is expanding every year while the construction workers' exposure to disaster risk is increasing due to technological advancements and popularity of high-rise buildings. In particular, the industry faces greater fatalities and severe large scale accidents because of construction industry characteristics including influx of foreign workers with different language and culture, large number of aged workers, outsourcing, high place work, heavy machine construction. The construction industry is labor-intensive, which is to be completed under given timeline and consists of unique working environment with a lot of night shifts. In addition, when a fixed construction budget is not secured, there is less investment in safety management resulting in poor risk management at the construction site. Taking account that the construction industry has higher accident risk rate and fatality rate, risky and unique working environment, and various labor pool from foreign to aged workers, preemptive safety management through risk factor identification is a mandatory requirement for the construction industry and site. The study analyzes about 8,500 cases of construction accidents that occurred over the past 10 years and identified risk factor by construction industry sector to secure a systematic insight for risk management. Based on interrelation analysis between accident types, work types, original cause materials and assailing materials, there is correlation between each analysis factor and work industry. Especially for work types, there is great correlation between work tasks and industry type. For reinforced concrete and earthwork are among the most frequent types of accidents, and they are not only high in frequency of accidents, but also have a high risk in categories of occurrence.

Feasibility Study to Apply Automated Trench Cutter (지하연속벽 공법 자동화 도입 타당성 검토)

  • Park, Kyoung-Soon;Koo, Ja-Kyung;Lee, Tai-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.364-367
    • /
    • 2007
  • According to increase of construction projects which is accomplished in the town, diaphragm wall method was proposed. This method diminished noise and vibration. And it is able to excavate deeper than other methods. But excavation work is difficult to maintain vertical and requires much time to work. Also the work result depends on know-how, experience and intuition of excavating machine operator. We interviewed technical experts related with slurry wall method and find equipment's characteristics. We used cost-concern matrix to investigate the propriety for the introduction of trench cutter automation. Through the research, it is proper to apply trench cutter automation.

  • PDF

An Analysis of Relationship between Unsafe Acts and Human Errors of Workers for Construction Accident Prevention (건설사고 예방을 위한 근로자의 불안전한 행동과 휴먼에러와의 관계 분석)

  • Min, Kwangho;Cha, Yongwoon;Han, Sangwon;Hyun, Changtaek
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.5
    • /
    • pp.161-168
    • /
    • 2019
  • Construction industry is becoming more advanced, but safety accidents are not decreasing and unsafe act (UA) and human errors (HE) are the main causes of safety accidents. Therefore, this study aims to analyze the relationships between unsafe acts and human errors for construction accident prevents. Specifically, the Correlation Analysis is used to quantify 24 combinations of the relationship between the UA and HE. Then, the Kano Model, and Timko Satisfied Coefficient was utilized to find 6 combinations for construction accident prevention plans. As the result of Timko Satisfied Coefficient, an interview was conducted with three safety managers and 6 safety prevention plan is proposed. Through these results, it is expected that the combination of 24 accidents will be basic data of safety management. Especially, the proposed safety prevention plans considering the characteristics of 6 combinations with high correlation can contribute to prevention of safety accidents at the construction site.

Development of Estimation System for Housing Remodeling Cost through Influence Analysis by Design Elements (설계요소별 영향분석을 통한 공동주택 리모델링 공사비개산견적 산출 시스템 개발)

  • Kim, Jun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.65-78
    • /
    • 2018
  • In As urban apartment are aging, the necessity of reconstruction or remodeling to extend the life of buildings is increasing. In such a case, a co-housing association is formed to implement decisions on reconstruction or remodeling projects. At this time, the most important thing for the co-housing association is the business feasibility based on the input of the construction cost.In the case of reconstruction, it is possible to estimate the construction cost by using the accumulated construction cost data, and then evaluate the feasibility using the construction cost. However, in case of remodeling, it is difficult to calculate the accurate construction cost because the number of accumulated construction cost data is small. In addition, non-specialist clients often require estimates of various design factors, often negatively impacting the accuracy of estimates and the duration of estimates. Therefore, in this study, proposed method to reflect the opinion of the owner who is a non-expert, as a design element, and a method of calculating the expected construction cost according to the design element, and constructed this system so that it can be easily used by the non-specialist owner. In order to clearly reflect the requirements of the non-specialist owner in the estimates, extracts the design elements from the existing remodeling cases, classify them, and suggest a plan for the client to choose. In order to reflect the design factors to the estimates, the existing apartment house remodeling cases were investigated and the design factors were extracted to have a large effect on the construction cost. Finally, developed system based on MS Excel so that the above contents can be easily used by a non-specialist client. In order to verify the accuracy of the proposed estimate in this study, verified the accuracy of 80% of the results by substituting the case of remodeling quotations and obtained a positive result from the questionnaire survey to examine the ease of use of the non-specialist customer. In this study, propose an estimate estimation method using four cases. If the remodeling cases are accumulated continuously, the expected effect of this study will be higher.