Park, Won-Young;Seo, Jong-Won;Kang, Sang-Hyeok;Choi, Bong-Joon
Korean Journal of Construction Engineering and Management
/
v.10
no.4
/
pp.50-57
/
2009
The Korea Standard of Estimate which has been used as the only basis of Cost estimate of public construction projects is failed to reflect the fluctuation of current construction cost. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004 and to reduce the use of Korean Standard of Estimate. This paper presents a series of process and the methodology for computing Actual Cost and analyzing the fluctuation patterns based on not only previous contract prices which made a successful bid but also all of the other bid prices. Also, this paper mainly handles a device for extracting strategic bid price such as low price bid for assuring reliable data and for predicting the construction cost which is built by Wavelet Analysis of Time series Analysis data and Neural Network. It is anticipated that the effective use of the proposed process for estimating actual unit cost would make the cost estimation more current and reasonable.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.48-57
/
2003
BAT Korea's Factory is the one of the major projects that clearly confirms and demonstrates that Construction Management (CM), provided by a Korean CM Company to the foreign clients, enables them to successfully complete projects; with savings in time and reduction in cost, which it is $15\%$ lower than the cost of the overseas construction. Also, throughout the thorough schedule management, it was possible to commence with manufacturing one month after the completion date. The Key Success Factors was generated by the excellent construction management skills, and more importantly by the confidence gained by the client in giving a CM company full authority for the construction management of the project. This study has focus on elements of construction management applied to this project throughout the concept of 'One Stop Shop', including cost managements, contract management and value engineering etc. We hope that this study will provide useful data to enable public clients to take advantages of construction management, in a similar way to. the private clients, who have already implemented CM actively.
Journal of the Korea Institute of Building Construction
/
v.6
no.3
s.21
/
pp.115-122
/
2006
This study is aimed to get clear model for CM fee level in public construction project. For the practical use and main target, CM for fee contract only is assessed and analysed. Cost estimate by percentage of total contract sum and method based on the historical construction data have significant deficiency. An regression model and probabilistic model are suggested with 9 independent variables. In the case of limited work scope, an element based floor area model is suggested and concluded with fish-bone scheme.
Lee Jin-Man;Kang Jae-Wang;Son Yong-Geun;Kim Chang-Duk
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.491-494
/
2003
Curtain wall (for the outside wall) must be designed and constructed to resist weather condition of nature like rain. wind and surrounding environment. So, Now days, Mock-up test of curtain wall's total capability is generally used for skycraft building. But, Mock-up test specification in korea is so weak that there are lots of disputation. Also, lacking of clearness in specification causes many trouble in adaptation. Therefore, I would like to consider the problem of Mock-up test specification by inspecting and comparing with other country's works. and I will mention the way of approvement in our specification.
The environmental management is essential for construction projects. The environmental management cost for construction projects is used for various purposes to control the environmental pollution and treat the wastes generated from the construction sites. Six construction cases were analyzed to compare the environmental management cost. The proportion of environmental management cost for total construction budget should be higher than 0.70% in redevelopment projects and 0.30% in newly constructed buildings, respectively, but every six construction cases did not meet the legal requirement. Redevelopment projects expanded more environmental management cost than the newly constructed projects especially in noise control and wastes treatment. In case of apartment construction projects, the proportion of environmental management cost of redevelopment buildings is 2.4 times higher than the newly constructed buildings, but in all cases, paid more attention to the noise and waste controlling measures than the wastewater treatment. It is needed to ensure the cost-effectiveness of environmental management for achieving the eco-friendly construction sites.
Korean Journal of Construction Engineering and Management
/
v.5
no.6
s.22
/
pp.170-178
/
2004
Public construction companies have strictly followed a rule that they should not work in the wet area such as structural frame for a certain period during the winter season. It is usually known that the non-working period during the winter causes increase of the project duration, and the project cost escalation. Also, it makes negative effects on national economy because it reduces workers income. Therefore, the site work for the structural frame should be performed even during the whiter season. But the site work for the structural frame during that period cannot proceeds in the same way as during other periods, and requires a different method for estimating project duration. Through an analysis of time scheduling mechanism, actual working days are obtained for 1 cycle of typical floors in the structural frame during these periods, and non-working days of 5 years average are calculated based on calendar day using data of 5 years weather forecasts for that season. This study proposes an optimized way of estimating project duration for 1 cycle of typical floors in the structural frame during these periods. This estimating method uses the combined actual working days and non-working days of 5 years' average, and the estimated results are confirmed by being compared with field data. This study is expected to be used in estimating the construction duration of the structural frame during the winter season.
Korean Journal of Construction Engineering and Management
/
v.10
no.6
/
pp.135-145
/
2009
The main goal of construction projects from the past has been enhancing efficiency by reducing cost and time. but, seeing the current condition of safety management of many construction companies nowadays, it is true that not much attention has been paid to safety management for a long time. However, there are paradigm shift from the cost and term of works to safety management in the construction industry, from this circumstance the safety management is evaluated more importantly. Though less accident happens compared to past, the accidents are getting greater because construction projects nowadays are bigger and more complex and monetary loss from the accidents are increasing. Also, the severity is getting greater and even fatal. For this reason, more improved safety management is very necessary. Therefore, we are to propose more efficient system for safety management in this thesis. Technical parts for developing system include many technique such as Real Time Locating system, and other techniques like Monitoring module based on BIM, Data Mart, Alarm are also applied together. Through this system, in the construction site, safety management is performed more effectively and widely because the system can manage the human resource and fluid situation. Also, safety manager can conduct more systematically and advanced safety management through human resource dominated safety management.
Proceedings of the Korea Information Processing Society Conference
/
2011.11a
/
pp.1507-1509
/
2011
공익사업 수행시 발생하는 용지보상은 매년 20조원에서 30조원에 이르는 막대한 예산이 투입되고 있는 반면 각종 규정과 업무절차가 복잡하여 업무처리에 많은 인력과 시간이 소요되고 있다. 이에 국토해양부와 같은 중앙부처, 지방자치단체, 도로공사 등 주요 공익사업 사업시행자들은 기관별로 별도의 보상시스템을 구축하고 있다. 하지만 교육과학부, 국방부 등 보상시스템을 사용하지 않는 중앙부처가 대부분이고 기 개발되어 있더라도 시스템 활용도가 낮아 보상시스템을 활용한 보상통계자료의 작성 등이 어려워 매년 국가가 취득하는 공공용지 취득실적 및 규모 등을 파악하기가 어려운 실정이다. 또한 회계시스템과 연계가 되어 있지 않은 시스템이 많아 정확한 보상비 집행실적 추적이 어려워 과세자료 누락으로 인한 세금 누수가 발생하고 있다. 더불어, 과다보상비 책정 및 지급시 이를 체계적으로 추적할 수 있는 전산자료 부재 등으로 보상비 집행의 투명성이 저하될 소지가 있다. 이에 중앙부처, 지방자치단체 및 공공기관별로 용지보상시스템 사용현황을 파악하고 이들을 근간으로 범국가적으로 보상업무를 선진화 할 수 있는 보상자료 통합 관리방안을 제시하고자 한다.
Korean Journal of Construction Engineering and Management
/
v.4
no.4
s.16
/
pp.220-226
/
2003
The Residential Building Cost Index which presents price variation of construction resources required in a residential building project in single value, has been compiled to evaluate appropriate level of the price variation. This research reviewed the compilation methodology for Residential Building Cost Index based on comparative analysis on domestic statistics and proposed the Residential Building Cost Index through a variety of case studies. It would facilitate monitoring the price variation of a residential building cost and contributes to enhancing the applicability of construction cost data.
Korean Journal of Construction Engineering and Management
/
v.8
no.4
/
pp.176-184
/
2007
Recently, in the korean construction industry, the importance of cost management in the building design process has been grown up institutional systems and policies for the cost management of design stages are however weakness. Traditionally, the range of cost management has been limited to the construction stages, and due to inefficiency of the infrastructure such as standards and building cost data for cost management. It has trouble to perform the cost management in building design process. This study intends to derive key influence factors for raising efficiency of cost management. With questionnaire surveys to professionals, we analyze a current situations and the influence of obstacle factors on cost management. Finally, the key influence factors are induced, based on the result of the analysis on influence the obstacle factors.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.