Preliminary Construction Cost Prediction Model Based on Module for Modernized Hanok (초기 기획단계의 신한옥 공사비 예측 모델 - 모듈(칸) 기반의 목공사 개략 물량 산출 중심으로 -)

  • Kang, Seunghee;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.48-56
    • /
    • 2020
  • Prediction of construction cost in the planning stage that provides basic information for feasibility study, budgeting, and planning is an important factor for successful project execution. In this study, a prediction model was developed for the purpose of improving the accuracy of estimating the construction cost of Hanok in the planning stage. The cost of this model is estimated by two methods. First, the cost of wood work, which accounts for the largest portion of the total construction cost, is estimated by calculating the approximate quantity under various conditions (structure type, roof type, plane type, etc.). Second, the cost of the rest work sections except the wood work is estimated by using the unit cost model. The predictive model was verified by two case projects, and the error rate of total construction cost was -4%(case 1) and -6%(case 2). These results showed an error rate in the range that can be applied to practice in the planning stage.

Improved Estimating Guideline for Quality Management Cost (건설공사 품질관리비 신출기준 개선방안)

  • Kim Kyoon-Tai;Ahn Bang-Ryul;Park Hyeong-Geun;Kim Kyong-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.75-83
    • /
    • 2002
  • Korea government established a domestic quality management system under the Law for Construction Technology Management, which was revised in 1997. This Law prescribes that the owner has to assign quality management cost into the construction project budget However, there are some conflicts among internal regulations and prescriptions on the scope of quality management engineer's roles was not specific. In order to overcome these limitations, this research identifies proper scope of quality management engineer's roles and suggests an approach for an improved estimating guideline for construction quality management cost.

Analysis of Safety Management Operations of Fire Risk Factors in Small-Scale Construction Sites (소규모 건설현장 화재 위험요인 안전관리 운영실태 분석)

  • Moon, Pil-Jae;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.6
    • /
    • pp.775-785
    • /
    • 2022
  • By analyzing the operation status of fire safety management of small construction site workers, deriving problems, and suggesting improvement measures, this study was conducted to present practical basic data for their efficient use in the future, and the following conclusions were drawn. First, it was analyzed that small construction site workers are elderly in the age group of construction workers, have short construction skills, most of the jobs are working in the construction industry, and the employment type is non-regular workers. Second, the fire safety management improvement plan of small construction site workers is systematized, fire safety manager is deployed to manage fire risk, fire escape routes and emergency warning facilities are provided to inform all workers at the construction site. In addition, measures to reduce industrial accidents are needed through realistic evacuation training, fire VR training, and interesting educational programs.

The Establishment of an Activity-Based EVM - PMIS Integration Model (액티비티 기반의 EVM - PMIS 통합모델 구축)

  • Na, Kwang-Tae;Kang, Byeung-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.199-212
    • /
    • 2010
  • To establish an infrastructure for technology and information in the domestic construction industry, several construction regulations pertaining to construction information have been institutionalized. However, there are major problems with the domestic information classification system, earned value management (EVM) and project management information system (PMIS). In particular, the functions of the current PMIS have consisted of a builder-oriented system, and as EVM is not applied to PMIS, the functions of reporting, analysis and forecast for owners are lacking. Moreover, owners cannot confirm information on construction schedule and cost in real time due to the differences between the EVM and PMIS operation systems. The purpose of this study is to provide a framework that is capable of operating PMIS efficiently under an e-business environment, by providing a proposal on how to establish a work breakdown structure (WBS) and an EVM - PMIS integration model, so that PMIS may provide the function of EVM, and stakeholders may have all information in common. At the core of EVM - PMIS integration is the idea that EVM and PMIS have the same operation system, in order to be an activity-based system. The principle of the integration is data integration, in which the information field of an activity is connected with the field of a relational database table consisting of sub-modules for the schedule and cost management function of PMIS using a relational database management system. Therefore, the planned value (PV), cost value (CV), actual cost (AC), schedule variance (SV), schedule performance index (SPI), cost variance (CV) and cost performance index (CPI) of an activity are connected with the field of the relational database table for the schedule and cost sub-modules of PMIS.

New Building Materials and Methods for Modernized Korean Housing (Hanok) (보급형 신한옥을 위한 부위별 공법 개발 및 영향도 분석)

  • Kim, Min;Kim, Hyosun;Ryu, Jaeseon;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.23-32
    • /
    • 2014
  • Modernized Korean housing (Hanok) with competitive price has been actively developed due to the increased interests in traditional Korean housing. Developing new building materials and methods is an essential area for Modernized Hanok. This paper compared and analyzed two mock-up buildings of Modernized Hanok and one mock-up of Traditional Hanok those were actually constructed as test-beds. Many different new methods were introduced, and their influences on construction cost and schedule were analyzed in order to verify the research results as well as to find implications for future direction. As a result, the construction cost and schedule of Modernized Hanok have been decreased by about 40% and 20%, respectively, when compared with traditional one. 'Wood frame' and 'Roof' are found as being the most influencing areas with highest weights in terms of cost and schedule. Therefore, further development in these two areas would facilitate to reduce overall cost of Modernized Hanok with improved building performance.

Development of Basic Construction Cost Estimation Model for Expansion of Underground Parking Lot Remodeling in Apartment Housing (공동주택 지하주차장 확대 리모델링 개략 공사비 산정 모델 개발)

  • Jeong, Eunbeen;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.42-52
    • /
    • 2021
  • The cost of remodeling parking lots of apartment houses accounts for about 20 percent of the total cost of remodeling. This means that when the remodeling cost of the underground parking lot is known, it becomes possible to estimate the total construction cost. The standard of estimation referenced when calculating the construction cost is difficult to apply to calculating the remodeling cost. Thus, a construction cost estimation model that reflects the characteristics of remodeling construction is necessary. This study developed a basic construction cost estimation model for expansion remodeling of underground parking lots of apartment houses that calculates the approximate cost of construction by reflecting the characteristics and design elements of remodeling. Based on literature review and consultation with experts, 37 activities of underground parking lot remodeling construction were derived. In order to enable calculation of approximate construction cost before the remodeling design drawing is finalized, the quantity calculation formula and unit price for each activity were presented. Based on expert advice, 13 factors that affect the increase in construction cost and weights of each factor were determined. As a result of applying three cases of remodeling complexes to the basic cost estimation model, the accuracy was confirmed to be 93 percent on average.

A Feasibility Study on Optimal Lifting Planning in the High-rise Apartment Building Construction (공동주택공사의 건설용 리프트를 이용한 양중계획 타당성 분석)

  • Lee, Jun-Bok;Han, Choong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.185-193
    • /
    • 2008
  • In order to improve work efficiency in high-rise apartment building construction, it is required to establish the major criteria and practical method for selecting the construction lifts. It is necessary to analyze work efficiency and economic feasibility depending on speed, size and capacity of lifting equipment and characteristics of construction projects. The purpose of this research is to develop the fundamental process and information for selecting the lift in order to plan and manage the material lifting and laborers' vertical transporting in the high-rise apartment building projects more effectively. In order to satisfy the objective of the research, work performance of the lifting machines with different speed and carrying capacity is analyzed under the practical constraints. In addition, potential economic evaluation is conducted. One of the significant findings of the research is that the mid-speed lift shows 43% improvement in work efficiency compared with the low-speed lift. The results of the research will be used as the basis for developing the further optimal lifting management system.

A Study on the Estimate Criteria and Influence Factors of Construction Duration of Domestic Firms -Focused on the Apartment Building Firms- (국내 건설 업체 공기산정 기준 및 영향요인 연구 -공동주택 중심으로-)

  • Kim Sun-Yeop;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.447-450
    • /
    • 2004
  • The domestic construction industry have focus on duration than construction cost. But recently it have interesting to The domestic construction industry, social requirement is changing. At the moderate speed duration has other angle of reducing cost and management of efficiency. specially Apartment building construction process is similar to other construction industry so it Is obtain a strong Point. This study on, A Target of construction industry is short duration than other it, general construction duration in summary schedule of level is studied, is based and construction duration for the point it is indicated reduction duration

  • PDF

The research and correspondence of schedule risk management at the pre-construction phase of curtain-wall (커튼월 공사의 착공 전 단계에서 공정 리스크 규명 및 대응방안)

  • Jung Tae-Sik;Kim chang-duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.71-79
    • /
    • 2005
  • As construction projects have been extremely enormous, complex and special, risk factors have been increased consistently. Therefore, it is very important to identify and cope with the uncertain risk factors in such building constructions for successful project accomplishment. The purpose of this research is to approach practical affairs directly and show detail alternatives of risk factors by extracting the risk factors throughout construction process of curtain wall that is largely influenced on cost, quality, schedule ,safety and following activity. Also, extracting these risk factors make it possible to analyze quantitative risk and decide the priority raking of risk factors. Especially, this research is aimed to provide efficient management of scheduling risk that can make the risk minimize to practical workers who have different degree of knowledge and experience to the construction cite when the risk brings out suddenly.

The Improvement of Curtain Wall Design Process using Value Stream Mapping Tools (VSM기법을 활용한 커튼월 공사의 설계 프로세스 개선)

  • Kim, Chang-Duk;Lee, Sang-Hyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.128-137
    • /
    • 2006
  • This paper is to develop curtain wall process life-cycle system in high-rise buildings in order to establish effective cooperation communication channels among the diverse constituents. This paper is to provide a base toward a curtain wall life-cycle management system to support decision making and the effective flow in light of information and materials. The four objectives of the research are 1) the analysis of the current curtain wall life-cycle process, 2) the analysis and development of the curtain wall design process As-Is model, and 3) the Muda analysis of the design process As-Is model and the suggestion of the improvements, 4) the development of curtain wall design To-Be model and comparative analysis of the improvement in terms of value streams. This research indicates the wastes decrease (or the values increase) from 6.7% up to 100% in different decision criteria through the improvement by the comparative analysis between the As-ls and To-Be curtain wall design process. This research suggests the potential improvement by VSM and a curtain wall life-cycle management system in curtain wall construction for diverse constituents be significant.