Legislative Policy Assignments in Construction Project Management by Strengthening Safety-Related Laws - Focusing on the CM/supervision-related system - (안전관련 법제 강화에 따른 건설사업관리 분야의 입법정책적 과제 - CM/감리관련제도를 중심으로 -)

  • Lee, Jeonghwan;Jung, Youngchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.76-88
    • /
    • 2022
  • The death toll in the Korean construction industry accounts for more than 50% of all business deaths. This is the highest level among OECD countries, and the government has proposed various solutions to this, but has not seen any significant effect. In order to strengthen safety responsibilities and obligations to CEOs of companies in the blind spot of punishment, including those who have the greatest authority and influence in the construction industry, the Moon Jae In government strengthened various laws, including legislation of the Serious Accidents Punishment Act. However, at this point in time, half a year later, it is still questionable whether such punishment has been strengthened and the effectiveness of fragmentary measures has been exerted. This paper attempted to present legislative policy directions for the problems of the current system and future improvement measures to contribute to reducing significant accidents in the CM/supervision industry among the various subjects of the construction industry.

An Analysis of Perceptions by Road Construction Engineers on ICEC Framework at the Time of System Transition, from Responsibility Supervision to Construction Management(I) - Main Focus on ICEC Framework - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(I) - 역량지수 등급 체계를 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.5
    • /
    • pp.1147-1156
    • /
    • 2015
  • The result of responsibility supervision system which has been enforced for the last twenty (20) years since January, 1994 is evaluated, and keeps an eye out the process of unification and absorption of the system into the construction management (CM). As a baseline data for this study, the grade framework of construction engineer's ICEC introduced with CM is summarized. In this manuscript, the questionaire survey for CM and ICEC was conducted toward the target group of road field construction engineers and analyzed the outcome of the respondents' answers. 50% of the respondents have answered positively for the question about converting responsibility supervision to CM. 48% of the respondents from construction works field have answered positively for converting responsibility supervision system to CM while 38% of the respondents from engineers of supervision field have answered positively, less positive than the answers from works field engineers. 46% of overall respondents have answered, however, to maintain the present system of 40%, 40% and 20% on the survey to the question asking the opinion on the ways of calculating ICEC to use the rates : 40% of career, 40% of qualification and 20% of academic achievements. However, it appeared that engineers who have comparative advantages with academic achievements and career, and engineers with lower grade qualification demanded higher rate for career.

건설정책 - 건설현장점검, 시공사가 자율적으로 시행토록 추진 - 국토부, 2010년부터 시행 -

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.235
    • /
    • pp.38-39
    • /
    • 2010
  • 국토부가 2010년 1월부터 건설현장 자율점검제도 시행에 들어감에 따라 앞으로 현장책임자가 감리원 등을 활용하여 시공, 품질 및 안전관리 등 건설공사 전반에 대하여 스스로 점검하는 자율적이고 상시적인 안전점검 체계가 구축된다. 자율점검현장으로 선정되면 건설사는 자율점검계획을 수립해야 하며, 자체적으로 일일 및 월간점검을 실시해야 하고 분기별로 인근현장과 교차점검 및 본사에서 현장점검을 시행하고 그 결과를 매 반기마다 국토해양부에 제출해야 한다.

  • PDF

A Study on a Basic Model for GIS Audit, Based on Various Types of GIS Projects (GIS 사업유형을 고려한 GIS 감리의 기반 모델 연구)

  • Koh, Kwang-Chul;Kim, Eun-Hyung
    • Journal of Korea Spatial Information System Society
    • /
    • v.2 no.2 s.4
    • /
    • pp.5-23
    • /
    • 2000
  • Since 1995, national and local governments have competitively initiated many and large GIS projects and audit for the projects becomes an important issue. So far, the audit in the Information Technology(IT) area has tried to deal with the issue but ineffectiveness has been found for the successful GIS project management. Effective auditing is a critical element for the project management. In order to establish a proper audit model for the GIS projects and to promote auditing activities in the projects, this study constructs two hypotheses and tries to prove them. The hypotheses are as follows : 1) For a good audits model for GIS, unique characteristics of a GIS project audit items and the scope of the audit need to be identified. 2) The scope of audit needs to be classified according to the requests from tasks in the projects. To prove the hypotheses, this study analyzes positive aspects of audit in IT and construction projects, clarifies the audit items in GIS projects by comparing with them, and classifies the scope of the GIS audit based on various types of GIS projects. As a results, 5 types of the GIS audit are identified : (1) audit for project management, (2) audit focused on IT, (3) audit characterized by GIS technologies, (4) GIS database audit and (5) consulting services for critical problems in the projects. In addition, 4 criteria in classifying the GIS projects are suggested for the GIS audit. The 4 criteria are domain, scope, duration, and GIS applications technologies. Especially, GIS technology considered in this study includes GIS software, methodologies for GIS development, GIS database and quality control of GIS data, which are not usually reflected in the existing studies about in GIS audit. Because the GIS audit depends on a type of GIS projects, scopes of the audit can be flexibly reconstructed in accordance with the types of GIS projects. This is a key to effective and realistic audit for the future GIS projects. Strategies for effective GIS audit are also proposed in terms of the following: GIS project management, goal establishment in each audit stage, documentation from GIS audit, timing strategies for intensive GIS audit, and designing team structure.

  • PDF

An Analysis of Perceptions of Road Construction Engineers on ICEC Framework at the time of System Transition from Responsibility Supervision to Construction Management (III) - Main Focus of Application for CM & ICEC - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(III) - CM과 역량지수 적용을 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.269-276
    • /
    • 2016
  • Recently the organizations related construction express frequently their opinion to MOLIT at the time of introducing the ICEC grade system and converting a system from responsibility supervision (RS) to construction management (CM). However there was no data to investigate the recognition of road construction engineers about the policy change. In this study, a questionnaire survey was conducted and analyzed twice to the road construction engineers on the CM and ICEC grading system at the Korea Institute of Construction Technology Education. The trend of response from the road construction engineers was verified through the survey separately from other institutions. This study analyzed the results and introduced a desirable policy proposal to promote an international competitiveness of the engineering industry.

Improvement of Construction Management System in Public Construction Projects - Focused on the Total Project Cost Management Guidelines - (공공 건설사업의 효율적 건설사업관리수행을 위한 제도개선방안 - 총사업비관리지침을 중심으로 -)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.3-11
    • /
    • 2020
  • In large public construction projects with a certain size or larger that need to be carried out over a number of years, the Authority must secure a budget for construction project management activities by the construction manager. There is no problem if the project management budget secured by the issuing Authority and the project management budget executed by the issuing Authority are the same, but if not, various problems will arise. Therefore, in this study, the following measures were proposed to improve the system for efficient operation of construction project management: First, the construction project management terms and tasks specified in the statutes and the guidelines of government agencies should be unified and the standard for calculating consideration should be unified. Second, the total project cost management guideline should be specified so that the missing construction project manager can receive compensation for the technical proposal. Third, if the project cost is changed in the long-term continuous construction project, the construction project management expense should be adjusted accordingly. Fourth, if construction project management service is required from the Authority, the basis for consignment to a specialized institution should be specified in the total project cost management guideline.

가스시공업계의 경영에 따른 현안문제 시정조치 건의

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.122
    • /
    • pp.24-29
    • /
    • 2000
  • 대한설비건설협회는 가스시공업체를 대상으로 실시한 설문조사 결과 아직까지 근절되지 않고 있는 도시가스사업자에 의한 부당행위 방지, 도시가스사업자에 의한 기술검토 요구$\cdot$과다서류 제출 요구$\cdot$검사입회 요구에 따른 부당행위 방지, 도시가스표준시방서(사용자공급관 및 특정가스사용시설) 제도화, 도시가스시설공사계획의 신고제도 폐지, 인입배관 공사비 부담 개선, 도시가스시설 상주시공감리 대상 완화, 배관용 탄소강관(KSD 3507) 도시가스 저압배관 사용 등 가스시공업계의 경영에 따른 현안문제점을 정부에 건의했다.

  • PDF

A Study on Current Status of Landscaping Supervision Quality Control and Improvement Measures in Apartment House Construction (공동주택 건설사업에서 조경 감리의 품질관리 현황과 개선방안 연구)

  • Kim, Jung-Chul
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.1
    • /
    • pp.1-18
    • /
    • 2021
  • This study was intended to present measures for the improvement of the apartment house landscaping supervision system by examining the adequacy of landscaping supervision, which is aimed at improving the quality of landscape plants and facilities in apartment house landscaping sites. Additionally, this study aims to identify the problems occurring in the process of the performance of landscaping supervision and to provide the evidence for legislative activities and revision of the laws currently being pushed forward for the mandatory deployment of apartment house landscaping supervision personnel. The results of the analysis showed that no landscaping supervision personnel was deployed to apartment complexes with less than 1,500 households and that the landscaping comprised 19% to 46% of the entire construction process. The civil engineering firm performed the landscaping supervision, which made it impracticable to fully focus on the construction quality in the field of landscaping. The quality control in terms of landscape plants revealed differences in quality control, depending on the competence and experience of the civil engineer supervising the personnel, where the landscaping supervision personnel was not deployed. The apartment houses landscaping supervision activity index was analyzed, and the results showed that the supervision activity index for apartment house A was 72.0, B was 70.4, and apartment houses C to G ranged from 38.7 to 46.9, which suggested that the difference in quality control, process control, and technical support affected the construction quality and occurrence of defects.The improvement of landscaping process quality control and process management will be carried out more smoothly and the rate of defects will be drastically reduced if the landscaping supervision personnel placement threshold is lowered from 1,500 households to 300 households in complexes. The results of this study are expected to be useful in promoting and re-establishing the landscaping industry based on the improvement of construction quality in the field of landscaping in connection with the construction of apartment houses.

Public Infrastructure Practitioner's Recognition on Project Performance (공공토목공사 실무자의 성과요인 인식차이 분석)

  • Park, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.93-100
    • /
    • 2007
  • Performance measurement and evaluation is a critical issue in public funded civil infrastructure projects in recent years. As a results, Korean government has introduced the related policies and regulations based on the foreign cases to evaluate public construction projects. However, construction circumstances are different from other countries and the results from adopted regulations are not satisfied. Therefore this research proposes the critical success factors(schedule, cost, productivity, change order, safety, quality) for public construction projects based on previous related research outputs to successfully implement construction performance evaluation. Then, this paper also proposes the weights for the critical success factors. The proposed weights are developed by AHP of construction experts. Furthermore, the paper shows the difference of the weights of the critical success factors by project participants (owner, constructor, engineering, and inspector). This efforts will enhance the ability to develop an effective performance evaluation process and system for public construction projects.

The Case of CM Type Supervision Apartment House Construction Work - Focused on the Case of Baekseok-Cheonan 2BL Construction Work - (공동주택건설공사의 CM형 책임감리 사례 - 천안백석 2BL 아파트건설공사 사례를 중심으로 -)

  • Lee, Kab-Weon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.41-48
    • /
    • 2004
  • The objective of the CM model projects is to achieve gradually the development of Domestic Construction, Industry with function, effects, problems and improvement which are the results after assessing tills finished project on the basis of CM Plan. The result is very useful of being activated CM and giving good orders continuously. Therefore this study describes work scope, organization, performance and management process for Baekseok-Cheonan 2BL project and picks out practical problems about CM and then suggests CM technical development directions and institutional improvements.