• Title/Summary/Keyword: 개발 비행시험

Search Result 470, Processing Time 0.03 seconds

Development of the External Instrumentation System of a Fighter Aircraft for Flight Test (비행시험을 위한 전투기 외장형 계측시스템 개발)

  • Yeom, Hyeong-Seop;Oh, Jong-Hoon;Sung, Duck-Yong
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.38 no.9
    • /
    • pp.907-913
    • /
    • 2010
  • In this paper, we have described a development of the external instrumentation system of a fighter aircraft for flight test. The external instrumentation system consists of the instrumentation pod and the image pod. The instrumentation pod measures a flight data(attitude, velocity, altitude, etc) of the fighter aircraft by using GPS/AHRS sensor. The image pod takes high-speed images for the separation trajectory of a smart bomb with 2 high-speed cameras and video signal for it with one general camera. We have verified the performance of the external instrumentation system through the ground test, the environment test and the flight test.

액체추진기관 Rocket의 발사를 위한 지상공급시스템 개발

  • 이정호;길경섭;김용욱;조상연;오승협
    • Bulletin of the Korean Space Science Society
    • /
    • 2003.10a
    • /
    • pp.90-90
    • /
    • 2003
  • 한국항공우주연구원은 액체추진기관 시스템을 이용한 3단형과학로켓(이하 KSR-III)을 국내 최초로 개발하여 비행시험을 수행하였다. 액체추진기관 로켓의 비행시험을 위해서는 이전의 고체 추진기관을 이용한 과학로켓 1, 2와는 달리 비행시험 조건에 부합하게 액체추진제 및 가압제 등을 공급하는 지상설비가 필요하다. 이에 한국항공우주연구원은 독자적으로 비행시험에 필요한 제반 설비를 갖춘 발사장을 구축하였다. KSR-III는 압축 헬륨가스(GHe)를 이용하여 연료(Jet A-1)와 산화제(LOx)를 가압하여 추력을 얻는 액체추진기관 시스템이다. 따라서 발사장에서의 지상공급설비는 유공압 설비와 발사시나리오에 따라 해당 부품을 제어하고 자료를 저장하는 제어/계측 설비 및 기타설비들로 구성되어 있다. 지상공급설비 중 유공압 설비는 LOx의 저장 및 기체 내 산화제 탱크의 충전을 위한 산화제 공급설비, Jet A-1의 저장 및 기체 내 연료 탱크의 충전을 위한 연료 공급 설비, 지상설비용 밸브구동 및 기체 내부 퍼지 등에 필요한 질소($N_2$)를 저장/공급하는 설비, 기체내부 밸브 구동 및 가압제로 사용되는 기체헬륨(He)을 저장/공급하는 설비들로 구성되어 있다. 이러한 구축된 공급설비는 기능시험, 연계시험 등의 각종 입증시험을 통해 그 성능을 검증한 후 단인증모델(SQTM)을 이용하여 발사 시나리오에 따른 추진제 공급능력을 입증한 후 KSR-III의 비행시험을 성공적으로 수행하였다. 수행된 연구결과는 향후 건설되어질 우주센터내의 발사장 기반설비 설계의 기초 자료로 활용할 수 있을 것이다.

  • PDF

The Development of DURUMI-II for Control Surface Fault Detection and Identification and Flight Test (조종면 고장진단을 위한 두루미-II 개발 및 비행시험)

  • Park, Wook-Je;Chang, Jae-Won
    • Journal of Advanced Navigation Technology
    • /
    • v.10 no.4
    • /
    • pp.299-305
    • /
    • 2006
  • DURUMI-II is developed into test bed airplane for the multi-purpose flight test. It satisfied the civil aeronautics law. DURUMI-II is equipped with Airborne System for acquiring of flight test data and can fly by oneself. In this paper, the redundancy of DURUMI-II control system is operated sequentially is explained. The divided control surface and the requiring program method for flight test are described. Also, it is described that the exact control input is applied using the new method. Finally, the results of flight test for new method are analyzed.

  • PDF

Implementation and Operational Test of ADS-B System in Goheung Aeronautical Center (고흥항공센터 ADS-B 구축 및 운용시험)

  • Yoo, Chang-Sun;Song, Bok-Sub;Cho, Am;Sung, Ki-Jung;Koo, Sam-Ok
    • Aerospace Engineering and Technology
    • /
    • v.13 no.1
    • /
    • pp.1-9
    • /
    • 2014
  • Goheung aeronautical center is located in the area of Goheung of which land is reclaimed from sea and has a runway of length 700m, width 25m with test facility which has been used for flight test of UAV and small aircraft. To support the enhancement of aircraft safety, 1090ES ADS-B ground system as the ground surveillance system has been implemented. ADS-B system based on GPS and digital data link provides the function of enhancing the aircraft safety through flight information among aircrafts. This paper gives the result that the implementation of ADS-B ground system and the flight test with onboard ADS-B transmitter has been conducted.

다목적실용위성 2호 비행모델 시험

  • 박종오;최종연;윤영수;권재욱;김영윤;조승원;안재철
    • Bulletin of the Korean Space Science Society
    • /
    • 2003.10a
    • /
    • pp.105-105
    • /
    • 2003
  • 인공위성의 개발과정에서 비행모델을 만들기 전 EM (Engineering Model) 들로 구성하는 Electrical Test Bed (ETB) 를 개발하여 위성의 하니스를 포함함 각 서브시스템 전장품들의 성능을 점검하게 되고, ETB 시험기간 동안 발생된 문제점 들은 비행모델 설계와 제작에 반영하게 된다. 다목적실용위성 2호에 대한 ETB를 개발하여 각종 위성 전장품에 대한 성능과 부분품들간의 인터페이스 신호들의 점검을 성공적으로 완료하였으며, 시험기간 동안 발생된 각종 문제점들은 비행모델 설계와 제작에 이미 반영하였다. 본 논문에서는 다목적실용위성 2호 비행모델에 대한 시험을 위하여 각 서브시스템 즉, 원격측 정명령계, 전력계, 자세제어계의 전장품과 탑재소프트웨어 그리고 각종 시뮬레이터들의 구성과 전기/전자적인 기능시험을 위한 시험항목 및 방법에 대해 고찰하고자 한다.

  • PDF

A Study on the Parameters for Icing Airworthiness Flight Tests of Surion Military Helicopter (수리온 군용헬기의 결빙 감항인증 비행시험을 위한 파라미터 고찰)

  • Hur, Jang-Wook;Kim, Chan-Dong;Jang, Jae-Sang
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.43 no.6
    • /
    • pp.526-532
    • /
    • 2015
  • In order to relieve limitation of flight operation under icing condition and verify its operation in adverse weather condition for Surion, military helicopter developed in Korea, airworthiness certification in icing condition is required. The process of Surion icing certification should be considered by implementation of four methods by step such as CFD analysis, simulated flight tests, artificial icing flight tests, and natural icing flight tests. For Surion icing flight tests, these are required 20~30 sorties and 20~23 hours in artificial icing condition; 20~30 sorties and 20~22 hours in natural icing condition. In addition, to proceed with efficient flight tests, it is necessary to implement artificial icing flight tests in LWC $0.5{\sim}1.0g/m^3;$ natural icing flight tests in less than LWC $0.5g/m^3$.

Concept Design of the Propulsion System Test Complex for Heavy Liquid Rocket (대형 액체로켓 추진기관 시스템 시험설비 개념설계)

  • Kim, Ji-Hoon;Yoo, Byung-Il;Cho, Nam-Kyung;Kim, Seung-Han;Han, Yeoung-Min
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2011.11a
    • /
    • pp.789-792
    • /
    • 2011
  • Before doing the flight test, the ground test for liquid rocket propulsion system is helpful for improving its reliability and reducing the development money. Therefore, by constructing the Propulsion System Test Complex for heavy liquid rocket propulsion system development, we expect that it will be the first step for making the commercial launcher which will be competitive in the international launch service market.

  • PDF

FLIGHT SOFTWARE DEVELOPMENT FOR HAUSAT-2 ON-BOARD COMPUTER (HAUSAT-2 비행소프트웨어 개발)

  • Shim Chang-Hwan;Ryu Jung-Hwan;Choi Young-Hoon;Chang Young-Keun
    • Bulletin of the Korean Space Science Society
    • /
    • 2006.04a
    • /
    • pp.117-120
    • /
    • 2006
  • HAUSAT-2 flight software was developed by first analyzing the satellite requirements, and incorporating the results into the software. Coding and compiling is done after the software is completed, then individual and integrated tests are performed in order to verify the flight software algorithm. Currently, HAUSAT-2 flight software integrated test has been performed and the test result is serving as a basis for code modification nd additional developments. This paper describes the architecture, development process, and development environment of HAUSAT-2 flight software.

  • PDF

Development of FAA AC120-63 Level C Flight Simulation Model for KA-32T (FAA AC120-63 Level C급 KA-32T 비행 시뮬레이션 모델 개발)

  • Jeon, Dae-Keun;Jun, Hyang-Sig;Choi, Hyoung-Sik;Choi, Young-Kiu
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.37 no.4
    • /
    • pp.406-412
    • /
    • 2009
  • Flight simulation model for helicopter simulator is one of the most important models which affect flight performance and handling quality. It is typical to develop the model based on the raw data and models from the helicopter designers/manufacturers. The approaches in this study were to develop the basic model based on the available resources regarding helicopter operation/maintenance and to tune and validate it based on the flight test results. The basic model was developed with maintenance manuals, flight manuals, analyses, measurements, papers and so on considering that KA-32T data could not be obtained from the manufacturer. The flight test for KA-32T was performed and the reference data for the simulation validation tests were acquired. The flight simulation model was validated to have the fidelity compatible with level C of FAA AC120-63 after comparison and tuning with flight test results.

Verification of Required Pressurant Mass Prediction Program for Propellant Tank through Flight Test Data (비행시험 데이터를 통한 추진제탱크 가압가스 요구량 예측 프로그램 검증)

  • Kwon, Oh-Sung;Han, Sang-Yeop;Cho, In-Hyun;Ko, Young-Sung
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2010.11a
    • /
    • pp.723-725
    • /
    • 2010
  • Calculation program to predict required pressurant mass for propellant tank was verified through flight test data. This program was already developed and verified through ground test data, but to increase reliability of program, it was compared with flight test data of KSR-III launched in 2002. Because pressurant temperature incoming to propellant tank was not measured in flight test, that was assumed in calculation program. Required pressurant mass and inside temperature of oxygen tank dome was compared. Validation of calculation program was verified by showing required pressurant mass accuracy of 6%.

  • PDF