• Title/Summary/Keyword: 개략공사비 산정

Search Result 36, Processing Time 0.027 seconds

Development of Basic Construction Cost Estimation Model for Expansion of Underground Parking Lot Remodeling in Apartment Housing (공동주택 지하주차장 확대 리모델링 개략 공사비 산정 모델 개발)

  • Jeong, Eunbeen;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.42-52
    • /
    • 2021
  • The cost of remodeling parking lots of apartment houses accounts for about 20 percent of the total cost of remodeling. This means that when the remodeling cost of the underground parking lot is known, it becomes possible to estimate the total construction cost. The standard of estimation referenced when calculating the construction cost is difficult to apply to calculating the remodeling cost. Thus, a construction cost estimation model that reflects the characteristics of remodeling construction is necessary. This study developed a basic construction cost estimation model for expansion remodeling of underground parking lots of apartment houses that calculates the approximate cost of construction by reflecting the characteristics and design elements of remodeling. Based on literature review and consultation with experts, 37 activities of underground parking lot remodeling construction were derived. In order to enable calculation of approximate construction cost before the remodeling design drawing is finalized, the quantity calculation formula and unit price for each activity were presented. Based on expert advice, 13 factors that affect the increase in construction cost and weights of each factor were determined. As a result of applying three cases of remodeling complexes to the basic cost estimation model, the accuracy was confirmed to be 93 percent on average.

Development of Approximate Cost Estimate Model for Aqueduct Bridges Restoration - Focusing on Comparison between Regression Analysis and Case-Based Reasoning - (수로교 개보수를 위한 개략공사비 산정 모델 개발 - 회귀분석과 사례기반추론의 비교를 중심으로 -)

  • Jeon, Geon Yeong;Cho, Jae Yong;Huh, Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1693-1705
    • /
    • 2013
  • To restore old aqueduct in Korea which is a irrigation bridge to supply water in paddy field area, it is needed to estimate approximate costs of restoration because the basic design for estimation of construction costs is often ruled out in current system. In this paper, estimating models of construction costs were developed on the basis of performance data for restoration of RC aqueduct bridges since 2003. The regression analysis (RA) model and case-based reasoning (CBR) model for the estimation of construction costs were developed respectively. Error rate of simple RA model was lower than that of multiple RA model. CBR model using genetic algorithm (GA) has been applied in the estimation of construction costs. In the model three factors like attribute weight, attribute deviation and rank of case similarity were optimized. Especially, error rate of estimated construction costs decreased since limit ranges of the attribute weights were applied. The results showed that error rates between RA model and CBR models were inconsiderable statistically. It is expected that the proposed estimating method of approximate costs of aqueduct restoration will be utilized to support quick decision making in phased rehabilitation project.

Development of the Approximate Cost Estimating Model for PSC Box Girder Bridge based on the Breakdown of Standard Work (대표공종 기반의 PSC Box 교량 상부공사 개략공사비 산정모델에 관한 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.791-800
    • /
    • 2013
  • Needs for developing a better way of cost estimating process for public construction projects have been widely recognized. Those needs are mainly from the early phases of the project through the construction life cycle due to the its importance to the control process. In contrast to the traditional estimating method based on unit-price references, this research utilized this following process. The first step is analyzing the real cost data from actual cost activities (2000~2010) about the statement of P.S.C(Prestressed Concrete) Box Girder Bridge. The collected data was broken into four categories based on technical construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). The second, actual design documents including the actual cost estimating documents, drawings and specifications were carefully reviewed to cluster the cost itemized statement from four categories. It was also attempted to seek the proper breakdown of standard works that are responsible for more than 95 percentage in each categories in terms of its cost. The third, this research comes up the index for standard unit materials and unit price of standard work and develops the approximate estimating model applying for the specification(length and breadth of bridges) per square area that the user takes as well as suggests the practical application plan within the original time alloted.

Suggestion and Verification of Assessment model on Construction Cost of Steel Box Girder Bridge in Project Performance Phases (사업 수행 단계별 강박스거더교 공사비 산정 모델 제시 및 검증)

  • Jeon, Eun-Kyoung;Kyung, Kab-Soo;Park, Jin-Eun;Kang, Sin-Hwa
    • Journal of Korean Society of Steel Construction
    • /
    • v.22 no.1
    • /
    • pp.55-65
    • /
    • 2010
  • To effectively secure and execute the national budget, it is very important to estimate the reasonable construction cost of each process in the construction of public facilities and works. The construction cost is generally estimated at the time when the design of the targeted structures has been completed. Without detailed sectional drawings and with only simple information on bridge structures in the planning stage or in the early design stage. it would be very difficult to predict the approximate construction cost. In this study, a more efficient and appropriate approximate construction cost estimation model in the planning stage and in the early design stage is presented and verified as reliable by analyzing the construction cost data of 61 existing steel box girder bridges from previous studies. The results of this study show that when the construction cost that was predicted using the construction cost estimation model in the design stage was compared with the cost from the conventional standards, the suggested model in this study produced results with a very high confidence level.

The Conceptual Cost Estimate Model on Preliminary Design Phase for RC Rahmen Bridge (RC라멘교의 기본설계단계 개략공사비 산정모델)

  • Kim, Byung-Soo;Kwon, Suk-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.111-120
    • /
    • 2009
  • The conceptual cost estimation used the construction project needs for confirm budget not only at the planning phase but also at the preliminary design phase of the construction project. Present, the conceptual cost estimation model have problems the rate of error is very large because the linear simple model calculate by use the cost of the unit meter or the unit square. This study development the model used grouping and the key quantity method, the mixed unit cost for solve problem of the very large rate of error. The result of this study reduced difference of between the real design construction cost therefor it expect that contribute to the client or the service company estimate budget of RC rahmen bridge.

Conceptual Cost Estimation Model Using by a Parametric Method for High-speed Railroad (매개변수기법을 이용한 고속철도 노반공사의 개략공사비 예측모델)

  • Lee, Young Joo;Jang, Seong Yong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4D
    • /
    • pp.595-601
    • /
    • 2011
  • There is currently applied to the unit cost per a distance (KRW/km) for estimating the conceptual cost of civil work on basic planning stage of high speed railroad. This unit cost is an arithmetic average value based on historical data, which could be in big error. It also is difficult to explain the deficiency comparing the estimated cost derived from next basic design stage. This study provides the conceptual estimation model using by the parametric method and regression analysis. Independent variables are the distance and the geological materials (earth, weathered rock, soft-rock, hard-rock), extracting from the actual data to 36 contracts. The deviation between the unit costs estimated using the developed model and the actual cost data is presented in the range from -0.4% to +31%. This range is acceptable compared the typical range "-30% to + 50%". This model will improve the accuracy of existing method and be expected to contribute to effective total cost management and the economic aspects, reduce the financial expenditure.

Roadway Preliminary Cost Estimation Prototype based on BIM and GIS (BIM/GIS 기반 도로 개략공사비 산정 프로토타입 연구)

  • Park, Wonyoung;Kang, Tai-Kyung;Lee, Yoo-Sub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.14-21
    • /
    • 2013
  • While a detailed cost estimation utilizes the comprehensive quantity information obtained from a complete drawing and specification, an approximate cost estimation heavily relies on the subjective decisions. This phenomenon is because the approximate estimation is usually conducted in early stage of the construction phase where the drawing and specification are not available. This study developed a roadway construction cost estimation system which enables users to estimate the approximated cost of the project in early stage. The system identifies the variation of the construction costs due to the road route change using a cased based reasoning(CBR) method. Overall the system is expected to improves the accuracy and effectiveness of the estimation process, because it would provide users with increased accessability and consistent results in early stage of the project which leaded to the increased work transparency.

An Approximate Cost Estimating Model for Eco-River Facility Construction Project at Planning Stage (자연형 하천공사 개략공사비 산정모델의 개발)

  • Choi, In-Wook;Lee, Si-Wook;Woo, Sung-kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.104-112
    • /
    • 2009
  • After the middle of 90's, the eco rivers maintenance enterprise was propelled about city rivers. The environmental function is more emphasized because of revising the rivers law enforced at 2008.4. Also, the field of application is being magnified. It is difficult to apply that the conceptual public work expense estimating model of the rivers which adjusts a focus at open channel rivers excepts the small-scale rivers maintenance public work. The research presents a eco rivers public work conceptual public work expense estimating model frame work. It suits the change of the rivers environmental renewal construction paradigm. It develops the conceptual public work expense estimating plan of the rivers at the planning phase using the collection and analysis of the data. As a result, riffle, spur dyke, stepping stones, fish way and etc are added. Consequently, it brings the hydrophilic function is considered seriously conceptual public work expense estimating model of the eco rivers.

Quantity-based Early Cost Estimation Model for Road Construction Projects (대표물량 기반의 도로공사 설계단계의 개략공사비 예측모델)

  • Kim, Du Yon;Kim, Byungil;Yeo, Donghoon;Han, Seung Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.373-379
    • /
    • 2009
  • Cost estimation in the early phase enables government to plan public budgeting more efficiently by providing information about construction cost. However, cost estimation in the early phase is difficult to predict because only a little information can be utilized. The cost estimation method now being used by the government is calculated by length of the road multiplied by unit cost per length and shows high error rate because it cannot reflect the unique characteristics of each project. As the project is being proceeded, level of available information also changed. So, reflecting available information of a project is important. This paper divided early phase into two parts : planning phase and early design phase, and developed cost estimation model considering level of available information of each phase. Total 143 cases are utilized to find influencing variables and develop cost estimation model and model validation is done by adopting required accuracy level. This cost estimation model reflecting level of available information can be applied to public budgeting, feasibility test, and comparison between routes.

Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage (하천시설물 공사의 기획단계 개략공사비 산정체계 개발)

  • Shin, Jung Min;Woo, Sungkwon;Lee, Si Wook;Kim, Ok Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.371-381
    • /
    • 2008
  • The systematic methodology for estimating construction cost approximately at planning and pre-design phase of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. This research suggests a 4-level cost information structure and identifies critical factors affecting construction cost as a result of thorough analysis of accumulated historical cost data of river facility construction projects. Also, this research presents the framework of the approximate cost estimating methodology for river facility construction project a planning stage.