• Title/Summary/Keyword: 감리대가

Search Result 22, Processing Time 0.033 seconds

A Criterion for Estimating Supervision Cost Considering the Change Factors by Construction Works (공사별 변동요인을 고려한 적정 감리대가의 산정기준 연구)

  • Lee, Bae Ho;Kang, Leen Seok;Lee, Yang Gyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.14 no.5
    • /
    • pp.1199-1208
    • /
    • 1994
  • In the country, supervision cost is being estimated by percentages of construction cost or cost plus a fixed fee without a reasonable standard. This type has no function for adjusting supervision cost according to variables, such as construction work complexity, extent of supervisory services, fluctuations in prices. In this study, an objective criterion to estimate supervision cost with improved supervisory services has been developed, in which adjusting functions as stated above should be properly considered. A comparative study of supervisory service systems in foreign countries and a survey through questionnaire were carried out for the study. An objective criterion from the results is proposed in the form of an expression or table.

  • PDF

An Analysis of the Conditions for Construction Supervision Fee (책임감리 용역 대가의 실태 분석 연구)

  • Choi, Sun-Hee;Choi, Hye-Mi;Lee, Jae-Young;Kim, Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.283-288
    • /
    • 2007
  • As constructions are changing variously from the size and efficiency, the role of supervision services tend to reach beyond mere monitoring or supervision to prevent fraudulence, but tend to extend toward a system that manages all the stages of the construction industry. There are growing demand to improve government operated corporation systems to secure high quality public facilities, and reviews on construction supervision system and supervision services roles, function, responsibility and obligations have been the topics among advanced researchers. However, the circumstance is that researches on the construction supervision service compensation and supervision services assignment criteria that serve as basis of such construction supervision system improvement are insufficient, and for practical development of construction supervision system, researches on construction supervision service compensation and supervision services assignment criteria will need to precede. Hence, this research purports to propose improvement directions of construction supervision system by deducing problems through condition survey on the construction supervision services ordered by public organizations.

  • PDF

A Study on Standardization of Supervision Cost by Investigating Supervision Workload in Cultural Heritage Repair Works (문화재수리공사의 감리업무량 조사를 통한 감리대가 기준 마련 연구)

  • Park, Hwan-Pyo;Han, Jae-Goo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.32-42
    • /
    • 2013
  • The Korean Government introduced a cultural heritage supervision system in January 2010 to control quality and to prevent poor construction. However, cultural heritage related constructions that require supervision, a scope of supervision, supervision cost and placement of supervisors have not been standardized yet. For this reason, standards of supervision for repair works of cultural heritage that reflect the characteristics of small-scale repair works and restoration of cultural heritage are required. Accordingly, this study has suggested standards of supervision works and cost by analyzing the average construction period that is suitable for the characteristics of cultural heritage repair works. In other words, this study has suggested standards of full-time supervision costs by applying the fixed amount-added method (adding direct labor cost, direct expenses, overhead expenses, engineering fee, charges for additional works and VAT) which is the same as the method of calculating supervision costs for public construction projects because a supervisor has to work full time at a construction site to perform supervision if the project is a mid/large-scale cultural heritage repair work. Also, this study has suggested standards of part-time supervision costs for a small-scale cultural heritage repair work and the ways of supervising the construction projects by visiting the project site on important occasions. According to the result of the analysis by applying the forgoing standards of supervision costs for cultural heritage, a full-time supervision cost for cultural heritage repair works is approximately 98% compared to the construction supervision of a public construction project, and a part-time supervision is approximately 158% compared to architectural construction supervision. It is expected that the valuable cultural heritage of Korea will be preserved by controlling quality of cultural heritage repair works through the application of this study result - the standards of supervision costs for cultural heritage repair works - to an actual project.

Analysis for the Improvement of the Small-Scale Project Design-Supervision Separating System (소규모 프로젝트의 설계-감리분리 제도 개선 분석)

  • Lee, Da-Un;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.5
    • /
    • pp.447-453
    • /
    • 2016
  • Recently, the design and supervision separating system has have been widely adopted in Korea. In this system, the owner should exclude the architect who designed the building from supervisor in the same project. The design and supervision separating system has advantage of less fraudulent construction and weakness of design intention reflection difficulty in construction stage. In this study, the status, problems and solutions of this system are identified from expert survey and interview. The main results of this study are as follows. First, the work scope of designer and supervisor should be clear and the guidelines for this system should be clearly defined. Second, the optimal price for the work scope should be guaranteed. Also, the education program for the improvement of supervisor capability should be provided.

A Study on the Revision of Man-day Cost Calculation Method for Information and Communication Facilities Construction Supervision (정보통신설비공사 감리대가 품셈개정에 관한 연구)

  • Lee, Jin-Ho;Kang, Byeong-Gwon
    • Journal of Convergence for Information Technology
    • /
    • v.10 no.2
    • /
    • pp.1-8
    • /
    • 2020
  • The standardized procurement of supervisory cost for the construction of domestic Information and Communication Technology(ICT) facilities, which is announced by the Korea Engineering and Construction Association in May 2009, has been applied in the public institutions and private industries. However, the previous standardized procurement is not widely applied in recent years because the ICT and social economic environment have been rapidly changed and the previous equations to calculate the supervisory cost is not simplified. As results, the needs for a new standardized procurement has been increased and the Ministry of Industry, Commerce and Energy has published a notice with new standard procurement. In this paper, we provide the explanation of the background and the derivation process of the notice based on authors' experiences of project participation. As research method, we compare the previous mad-day cost of ICT construction and that of another area including electric facility construction, and then we explain a new procurement equation based on WBS(Work Breakdown Structure).