Browse > Article
http://dx.doi.org/10.5345/JKIBC.2016.16.5.447

Analysis for the Improvement of the Small-Scale Project Design-Supervision Separating System  

Lee, Da-Un (Department of Architectural Engineering, Gyeongsang National University)
Yun, Seok-Heon (Department of Architectural Engineering, Engineering Research Institute, Gyeongsang National University)
Publication Information
Journal of the Korea Institute of Building Construction / v.16, no.5, 2016 , pp. 447-453 More about this Journal
Abstract
Recently, the design and supervision separating system has have been widely adopted in Korea. In this system, the owner should exclude the architect who designed the building from supervisor in the same project. The design and supervision separating system has advantage of less fraudulent construction and weakness of design intention reflection difficulty in construction stage. In this study, the status, problems and solutions of this system are identified from expert survey and interview. The main results of this study are as follows. First, the work scope of designer and supervisor should be clear and the guidelines for this system should be clearly defined. Second, the optimal price for the work scope should be guaranteed. Also, the education program for the improvement of supervisor capability should be provided.
Keywords
design-supervision separating system; supervision cost; small sized building;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Jang SH. The Study of Design and Supervision over the Construction of Complementary Research on Quality Improvement [master's Thesis]. Seoul (Korea):Seoul National University of Science and Technology; 2011. 66 p.
2 Yoon SH. Prospect & Counter Plan of Architectural Industry. Review of Architecture and Building Science. 2006 Aug; 50(7):40-2
3 Huh YK, Kim KU, Kim DY, Ahn HR. Analysis of CM Project Trend and Cost Estimation in the CM Industry. Journal of the Architectural Institute of Korea Structure & Construction 2013 Jul;29(7):133-40.   DOI
4 Noh DW, Jeong BH. A Study on the Management Information System for Supporting the Supervision of Construction Workplace. Journal of the Korean Institute of Building Construction. 2003 Jun;3(2):85-93
5 Yoon JS, Yoo BE, Han CP. Measures to Implement Comprehensive Supervision for the Purpose of Bolstering Construction Management (CM). Journal of the Korean Institute of Building Construction. 2006 Dec;6(4):99-102
6 Song JH, Choi IS. A Study on the Improvement of Opinion Gap for Quality among Owner, Designer, Constructor and Supervisor in Construction Industry. Journal of the Korean Institute of Building Construction. 2001 Oct;1(2):133-45
7 Kim KS, Hyun CT, Hong TH, Jo SM, Mun HS. Development of an Unit Cost Modification Model for Proper Actual Cost Data in Small Building Construction Projects. Journal of the Korean Institute of Building Construction. 2001 Feb;10(1):81-9
8 Kim MS. A Study on the Reformation and Integration of Construction Supervision and Construction Management System [master's Thesis]. Seoul (Korea):Kwangwoon University; 2013. 120 p.