• Title/Summary/Keyword: 가설 시설물

Search Result 26, Processing Time 0.025 seconds

Knowledge Reorganization Method of Temporary Facility Planning for High-rise Building Constructions (고층건축공사를 위한 가설계획 지식의 체계화 방법)

  • Kim Wan-Soo;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.411-414
    • /
    • 2002
  • As high density of cities, construction project is getting to be high rise, large sized and multi purposed, whereas it has some difficulties due to disordering of classification and undeveloped management systems. In this study, it would be suggested that classification method for knowledge and constraint of temporary facility in order to efficient decision making of temporary facility planning with knowledge reorganization and establishment process.

  • PDF

Behavior Case Study of Temporary Structures during Underground Extension Work by Field Measurement (현장계측을 통한 지하증축공사 중 가설구조물의 거동 사례연구)

  • Kim, Uiseok;Min, Byungchan;Kang, Minkyu;Kim, Dongkwan;Choi, Hangseok
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.8
    • /
    • pp.5-13
    • /
    • 2020
  • During the construction of underground space expansion of old facilities, it is necessary to secure temporary residence space for existing residents as well as noise and vibration issues during construction, and in the case of commercial, industrial, and social use, damage is expected from suspension of the use of facilities. There is a need for a technology that minimizes noise and vibration during underground expansion, enabling the use of existing facilities even during construction. In this study, a practical underground extension model is proposed by analyzing the behavior of the temporary structure and the surrounding ground as a result of measurement at each construction stage for a actual construction site. In order to solve the problems that occurred during construction, the basement slabs were placed in advance after the initial excavation. The measurement results (building inclinometer, crack measurement system, structure inclinometer and surface settlement meter) at the site were reviewed to analyze the behavior of the temporary structure and surrounding ground. As a result, it was confirmed that the inclinometer of the building and the structural inclinometer showed a tendency that the displacement after the slab line was placed was reduced or converged. The placement of basement slabs during underground extension not only relived the noise and vibration problems during construction, but also secured the stability of structures.

Development of Temporary Facility Planning System for High-rise Building Constructions through the Analysis of Influence Factors (영향요소 분석에 의한 고층건축공사의 가설계획시스템 개발)

  • Jang Myung-Houn
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.164-173
    • /
    • 2002
  • The high-rise building construction field in the urban area is short of working space because it is surrounded by adjacent buildings and nearby roads. The insufficient space causes problems of interference and conflicts in transporting materials and working at the site. These problems can be resolved partly through the proper selection and layout of temporary facilities. A method proposed in this paper supports a decision-maker to evaluate and select the alternatives of temporary facilities plans by establishing and analyzing processes and influence factors of them. Knowledges considered in planning temporary facilities layout are structurized and a program is implemented for a field manager. Case studies are performed to evaluate the feasibility and applicability of the proposed method.

  • PDF

Enhanced Quality and Safety by Expanding Field Application of System Scaffolding (시스템비계의 현장적용 확대 연구로 품질 및 안전제고)

  • Jung, woo-don
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.231-232
    • /
    • 2022
  • 건설 현장이나 일반 제조업 현장은 작업자의 고소 위치에서의 작업시, 필요한 특정 장소로의 접근을 위한 임시 구조물을 설치하는데 이를 가설비계라고 한다. 이러한 가설비계는 작업자의 안전 통행과 작업을 위한 받침대 역할, 장비나 공구, 자재를 임시 적치하기 위한 장소로 활용되는데 일반 건축물과 중후장대한 조선소 블록 제작등에 필수적으로 사용된다. 하지만 가설설비라는 특성으로 비계와 관련된 연구가 부진하고 사업적으로 참여하는 사업주 또한 진출을 가볍게 생각하고 있으며 해당 공사에 임하는 작업자의 산업으로의 진입문턱도 낮은 등으로 시공 품질이 떨어질 우려가 매우 높다. 또한 설치후에는 품질검사가 어려워 작업자의 숙련도나 진정성 등에 의한 주관적 작업 결과물이 설치된 시설물을 사용하는 주변 작업자에게는 불안전 요인이 되기도 한다. 이에 작업자의 숙련도나 주관적 판단에 의한 가설 구조물 설치를 회피하여 안전성을 높이기 위한 방안이 연구되어 왔는데 이것이 시스템비계이다. 이러한 시스템비계에 대한 사용성을 확대하기 위해 국토교통부와 고용노동부등의 정부기관에서는 여러 가지 제약과 동시에 장려정책을 제시하고 있으나 공적 발주나 일부 대기업그룹 외의 중소 현장에는 그 확산 속도가 높지않은 편이다.

  • PDF

Development of Design Support System to Optimize the Temporary Work (강교량 설치 가설공사의 최적화설계 지원시스템 개발)

  • Cho, Hun-Hee;Park, Jae-Woo;Cho, Moon-Young;Kim, Jung-Yeol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.115-123
    • /
    • 2005
  • Design of steel $bridge^{\circ}AEs$ temporary works has conducted relying on the experiences of engineers based on the previous similar projects. Consequently, there have been arguments against over-design of temporary bents to be required at the actual construction sites, and unnecessary design changes have been issued at the construction stage. In this study, we have developed an optimum design support system for temporary works of the steel bridge construction through establishing the database for the materials to be needed for implementation of temporary works. We've also improved the accuracy and efficiency of the works through the design optimization for temporary works, and contributed to reduce design changes as well as to utilize the design informations at the construction stage.

The flow of Temporary Facility Planning Information in High-rise Building Construction (고층건축공사에서의 가설계획 정보흐름)

  • Yoon You-Sang;Lee Hyung-Soo;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.91-96
    • /
    • 2002
  • The purpose of this study is to present a systemized flow of temporary facility(TF) planning information. The current TF planning tends to be established by subjective decision making of field workers. Therefore TF planning needs more systemized information flow to provide a reliable schedule. The study was implemented through interview with experts for reliable TF planning. The main contents of the study are as follows; 1) TF planning process model(IDEF0) are established. 2) Various information flow diagrams proposed to support TF planning decision-making. The study recommends that, as a future research, the computer system be developed for application of the information flow.

A Study on Development of Electronic Performance Support System Prototype for Improving the Efficiency of Quality Inspection of Temporary Work (가설공사 품질점검 업무효율 향상을 위한 전자작업지원시스템(EPSS) 프로토타입 개발에 관한 연구)

  • Yoon, Soo-Ho;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.13-27
    • /
    • 2019
  • While temporary construction work applies to a temporary facility, it has a high use frequency during the construction period accounting for around 10% of the construction cost, it requires systematic management. However, construction inspection information of temporary construction work often has no special specification in the design documents and specification items, with the items on various standards also being formidable. Because of this, related inspection are likely to be performed inefficiently with a high probability for occurrence of human errors when quality inspection is conducted for the temporary construction work. In the present study, therefore, apply to the electronic operation support system capable of supporting implementation of inspection of providing related information for the contemporary construction work. To achieve this, a prototype is developed by using IDEF0 to identify information flow by process and organizing EPSS-based quality inspection Task. And then, efficiency of the quality inspection and information accessibility for temporary construction work are to be improved by verification method of Sample Project.

Preliminary study for Vertical Dynamic Site Layout Planning of High-Rise Building Construction (고층공사 가설시설물의 동적수직배치 최적화를 위한 기초연구)

  • Pyo, Kiyoun;Lee, Dongmin;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.39-40
    • /
    • 2018
  • The goal of site layout planning(SLP) is to maximize the productivity and efficiency of the construction by reducing travel distance and material handling cost and manpower. However, SLPs are static layout schemes, which cannot be reorganized during the construction process to correspond with errors, phase transition, changing working environments on the site. To solve this problem, researches on dynamic site layout planning(DSLP) are emerging. This preliminary study clarifies characteristics of temporary facility's variables to develop the vertical DSLP algorithm of high-rise building construction.

  • PDF

Structural Behavior of Temporary Fence Frame under a Lateral Load (가설울타리 골조의 횡력에 대한 구조적 거동)

  • Kim, Young-Chan;Lee, Jae-Cheol
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.1
    • /
    • pp.755-761
    • /
    • 2015
  • Temporary fencing is a mandatory installation in construction sites because of environmental regulations and pedestrian safety. Contractors are responsible for the structural integrity of frames. The fence frame composed of a ledger and post is very weak in the out-of-plane direction, which is normally reinforced by diagonal bracing with a sub post. In this study, the location of lateral bracing for the main post was investigated analytically. Three types of frame were suggested and their performance was compared in terms of the maximum moment and deflection. A construction site may be located at city centers or crowed areas, and a contingent accident should be considered. The EOD type was found to be most efficient among the three frames suggested.

Safety Management of Steel Pipe Scaffold using UAV (무인항공기(UAV)를 활용한 건설현장 가시설물 안전관리)

  • Jun, Byong-Hee;Kim, Nam-Gyun;Jun, Kyo-Won;Choi, Bong-Jin
    • Journal of Korean Society of Disaster and Security
    • /
    • v.12 no.3
    • /
    • pp.59-67
    • /
    • 2019
  • In this study, the UAV (Unmammed Aerial Vehicle) was applied for the photogrammetry of the construction site and the safety management of steel pipe scaffold. The research site is a temporary facility for building reinforcement on Samcheok Campus of Kangwon National University. The installation condition of the steel pipe scaffold was investigated, and the pillar distance, the beam distance and the wale distance were surveyed. As a result, it was found that the beam distance of the scaffold in the longitudinal direction was in good agreement with the standard, but the pillar distance and the wale distance were found to be less than the standard. Three-dimensional data can be used in drone shooting to enable three-dimensional measurement, so that it is possible to measure facilities hidden or located inside other facilities. Through the drone shooting, the condition of the site can be quickly recorded and the surveying can be carried out without interfering with the work of the field personnel. Although the installation of the temporary structure must be strictly observed to ensure the safety of the workers, it is found that the installation standards are still neglected in the field. In order to prevent this practice, it was thought that the legal system should be supplemented so that it could be checked periodically by using UAV in the field process management.