• Title/Summary/Keyword: '빌드' 프로젝트

Search Result 13, Processing Time 0.025 seconds

An Approach to Recommending of Solutions for Resolving Gradle Build Error (Gradle 빌드 오류 해결을 위한 솔루션 추천 방안)

  • Kang, Mingu;Kim, Taeyoung;Kim, Suntae;Ryu, Duksan
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.20 no.6
    • /
    • pp.33-39
    • /
    • 2020
  • Developers spend considerable time manually repairing code that was not built during project construction. If the build fails, it is necessary to understand the failed execution, identify the cause of the failure, and then implement the solution. Build tools such as Gradle have been developed to reduce this effort and automate project construction. However, build tools still do not solve many errors, requiring developers to try to solve build errors. In this study, we propose a solution recommendation method to increase the success rate of Gradle build and reduce the effort required to resolve errors. We provide a way to collect build errors and a way to transition from build error messages to successful builds. In particular, 296 build error messages collected from Github's Java project are classified as solutions, and 89% show that the solution can be applied.

The Process Model for Project Management of Design-Build System and Constitution of Database (설계시공일괄 방식의 건축 프로젝트 관리를 위한 프로세스 모델 및 데이터베이스 구축)

  • Chun Jae-youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.109-116
    • /
    • 2005
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alternative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather din single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial t31ow-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigate throughly the function and information flows all over the design-build project. This research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to improve the consistency of functional process and minimize incoherent activities of the design-build projects.

The Deduction of the Success Factor in Construction Projects by Design Build Methods (디자인 빌드(Design Build) 방식 건설 프로젝트의 성공요인 분석에 관한 연구 - 중.소규모 건설 프로젝트를 중심으로)

  • Lee, Chi-Joo;Kim, Sang-Ki;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.182-190
    • /
    • 2007
  • The minor construction companies in Korea have grown in focusing on the construction operation field. Also, soft field is vulnerable area, and there are not enough delivery systems, therefore, a capacity of the construction industry expansion and productivity is insufficient. Furthermore, the minor construction companies are losing their areas, because the major construction companies having numerous know-how and ample funds are competitive. As the construction industry are more larger and complicated, the design build methods might be increased in the construction industry and the minor construction companies could have more competitive. Hence, this paper analyzes the success factor in minor construction projects by design build methods focusing on instance $company^{\circ}{\phi}s$ case and survey, and critical success factor deduction and importance degree analysis of this factor using AHP analysis. In addition, this paper gives fundamental data how to manage the construction project effectively for minor construction $companies^{\circ}{\phi}s$ expansion in near future.

A Process Model for Project Management of Design-Build System and Method for Constitution of Database (건축 프로젝트의 설계시공일괄 수행방식 관리를 위한 프로세스 모델 개발 및 데이터 베이스 구축 방안)

  • Kim Eui-Suk;Kim Chang-Gyo;Lee Kyung-Kook;Park Sang-Jun;Son Bo-Sik;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.242-245
    • /
    • 2004
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alterative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather than single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial know-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigated throughly the function and information flows all over the design-build project. In this research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to Improve the consistency of functional process and minimize incoherent activities in each phase of design-build project.

  • PDF

Study On the Object Oriented Design Project of Online Game Engine Using UML (UML을 사용한 온라인 게임 엔진 프로젝트 설계 연구)

  • Choi, Sung
    • Journal of Korea Game Society
    • /
    • v.5 no.1
    • /
    • pp.33-40
    • /
    • 2005
  • Game Designs & Developers that system designs improve, the product and the change of tasks to all developers are essential in achieving On-Line Game project. Existent Or-line Game project management designs supper the definition and the change of project activities, and configuration management designs support version check, workspace management, build management, etc. In this paper. the proposed Design defines Game component based development process model, and achieves recording of process progression, processing the request of change, reporting the progression of each task, product registering and change, version recording, artifact or form search, etc. using UML. Furthermore, study on the stake holders get the systematic management and standardization by sharing information that are necessary in Game design & development and configuration management in distributed environment using the system integrated management design.

  • PDF

Study On the Object Oriented Design Project of Online Game Engine Using UML (UML을 사용한 온라인 게임 엔진 프로젝트 설계 연구)

  • Choi, Sung
    • Journal of Korea Game Society
    • /
    • v.4 no.3
    • /
    • pp.21-28
    • /
    • 2004
  • Game Designs & Developers that system designs improve, the product and the change of tasks to all developers are essential in achieving On-Line Game project. Existent On-line Game project management designs supper the definition and the change of project activities, and configuration management designs support version check, workspace management, build management, etc. In this paper, the proposed Design defines Game component based development process model, and achieves recording of process progression, processing the request of change, reporting the progression of each task, product registering and change, version recording, artifact or form search, etc. using UML. Furthermore, study on the stake holders get the systematic management and standardization by sharing information that are necessary in Game design & development and configuration management in distributed environment using the system integrated management design.

  • PDF

Study on Method that Applies SELinux on Embedded Linux System (임베디드 리눅스 시스템에 SELinux 적용 방법 연구)

  • Cho, Kyung-yeon;Ko, Jae-yong;Lee, Sang-gil;Lee, Cheol-hoon
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2017.05a
    • /
    • pp.371-372
    • /
    • 2017
  • 최근 IoT 디바이스가 증가함에 따라 IoT 환경에서 사용되고 있는 임베디드 시스템에 대한 보안의 중요성이 대두되고 있다. SELinux는 Linux 의 보안성을 강화시키는 보안 강화 커널로, 시스템의 취약점을 이용한 공격을 방지할 수 있는 Linux 시스템 보안의 핵심적인 요소이다. 본 논문에서는 임베디드 리눅스 빌드 시스템중 가장 활발히 진행되고 있는 Yocto 프로젝트를 활용하여 임베디드 리눅스 시스템에 SELinux를 적용하는 방법을 연구하고자 한다.

  • PDF

An Integrated Tool Model for the Management of Process and Artifact Management on CBD (컴포넌트 기반 개발에서의 프로세스 관리와 산출물 관리를 통합하는 도구의 모델)

  • Kim Young-Hee;Chong Ki-Won
    • Journal of Internet Computing and Services
    • /
    • v.5 no.4
    • /
    • pp.11-22
    • /
    • 2004
  • Works that improve the process and notify the improved process, the product and the change of tasks to all users are essential in achieving project. Existent project management tools support the definition and the change of project activities, and configuration management tools support version check, workspace management. build management. etc. It costs too much to buy each tool. as well as, it is burdensome to learn usage for various tools. Therefore the web-based integrated tool is proposed to manage the process and artifacts at a time in this paper. The proposed tool defines component based development process model. and achieves recording of process progression, processing the request of change, reporting the progression of each task, product registering and change, version recording, artifact or form search, etc. using ebXML. Furthermore, the stakeholders get the systematic management and standardization by sharing information that are necessary in process achievement and configuration management in distributed environment using the integrated management tool.

  • PDF

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

A Study of the DEVOPS Test Automation Module for Integrated Development Environment (통합 개발환경에서 데브옵스 기반 테스트 자동화 모듈 개발에 대한 연구)

  • Jung Kwang Lak;Kim Sun Joo
    • Convergence Security Journal
    • /
    • v.22 no.1
    • /
    • pp.3-9
    • /
    • 2022
  • The role of the integrated development environment is very important in software development of a development project. After many developers develop different modules, software product is completed through compile, debugging, integration, testing, and distribution. However, bugs and various issues in the development process cause problems such as quality deterioration of software product and dissatisfaction with requirements. So the need for automated testing to avoid these problems and improve quality has increased. In this study, we propose test automation modules of four perspectives to improve quality throughout the test automation in an integrated development environment. Each automation module operates through the tool chain of an integrated build framework implemented on the devops.