Acknowledgement
This work is supported by the Korea Agency for Infrastructure Technology Advancement(KAIA) grant funded by the Ministry of Land, Infrastructure and Transport(Grant RS-2020-KA158109).
References
- Lee HH, Kim KH, Son SH, Park KH, Kim SK. Erection time and cost reduction effects of steel connected precast concrete components for long span and heavy loaded logistics buildings. Journal of Civil Engineering and Management. 2020 Feb;26(2):160-74. https://doi.org/10.3846/jcem.2020.11673
- Polat G. Precast concrete systems in developing vs. industrialized countries. Journal of Civil Engineering and Management. 2010 Oct;16(1):85-94. https://doi.org/10.3846/jcem.2010.08
- Kim KH, Lee BS, Lee DG, Kim MJ, Kim YH, Sohn JR. On-site work analysis for PC member erection of LH PC rahmen apartment building. Proceeding of the Architectural Institute of Korea . 2023 Apr 26-28; Busan, Korea. Seoul (Korea): the Architectural Institute of Korea; 2023. p. 965-6.
- Kim KH, Lee DG, Kim MJ, Jun MH, Lee BS. Analysis of the relationship between preceding and subsequent processes of PC apartment building frame work. Proceeding of the Architectural Institute of Korea. 2024 Apr 24-26; Seoul, Korea. Seoul (Korea): the Architectural Institute of Korea; 2024. p. 467-70.
- Hong WK, Kim SK, Kim HG, Yoon TH, Yune DY, Kim SI. A feasibility study of green frame(GF) for the implementation of low-carbon emissions & long-life housing. Journal of the Korea Institute of Building Construction. 2010 Feb;10(1):57-63. https://doi.org/10.5345/JKIC.2010.10.1.057
- Lee SH, Kim SE, Kim GH, Joo JK, Kim SK. Analysis of structural work scheduling of green frame : Focusing on apartment buildings. 2011 Jun;11(3):301-9. https://doi.org/10.5345/JKIC.2011.06.3.301
- Kim KH, Kim MJ, Noh JH, Lee BS. The frame work process of the LH PC apartment building. Korea Institute for Structural Maintenance Inspect. 2023. Dec;27(4):18-23.
- Kim KH, Lim JJ,, Kim JW, Kim MJ, Sohn, JR, Lee BS. On-site productivity reduction factors for off-Site construction based PC public housing. Proceeding of the Architectural Institute of Korea. 2021 Oct 27-30; Yeosu, Korea. Seoul (Korea): the Architectural Institute of Korea; 2021. p. 712-3.
- Kim KH, Lee BS, Koh GE, Lee DG, Kim MJ, Sohn JR. Operation time calculation model of luffing tower crane according to the PC member lifting methods. Proceeding of the Architectural Institute of Korea. 2023 Oct 25-27; Gangwon, Korea. Seoul (Korea): the Architectural Institute of Korea; 2023. p. 437-8.
- Kim KH, Lee DG, Kim MJ, Jun MH, Lee BS. Optimal construction schedule for the crane equipment in the PC apartment building. Proceeding of the Korea Institute of Building Construction. 2024 May 22-24; Gunsan, Korea. Seoul (Korea): the Korea Institute of Building Construction; 2024. p. 75-6.
- Liu D, Li X, Chen J, Jin R. Real-time optimization of precast concrete component transportation and storage. Advances in Civil Engineering. 2020 Mar;2020(1):1-18. http://doi.org/10.1155/2020/5714910
- Joo JK, Kim SK, Lee GJ, Lim CY. Cost analysis of the structural work of green frame. Journal of the Korea Institute of Building Construction. 2012 Aug;12(4):401-14. https://doi.org/10.5345/JKIBC.2012.12.4.401
- Kim SW, Choe MG. A study on the lifting progress character tributary for the construction materials moving method. Journal of the Regional Association of Architectural Institute of Korea. 2010 Mar;12(1):199-206.
- Kim JJ, Choi IS. A study on hoisting planning system in highrise building construction. Journal of the Korea Institute of Building Construction. 2005 Dec;5(4):121-30. https://doi.org/10.5345/JKIC.2005.5.4.121
- Joo JK, Kim SE, Lee GJ, Kim SK, Lee SH. A study on the lifting progress for composite precast concrete members of green frame. 2012 May;13(3):34-42. https://doi.org/10.6106/KJCEM.2012.13.3.034
- Barde AD, Senou K, Somaraju CK, Bommi S. Nation's first high-rise total precast concrete residential building-state of the art of precast technology in India. 2014 National Accelerated Bridge Construction Conference. 2014 Dec 4-5; Miami, FL. Chicago (IL): Precast/Prestressed Concrete Institute; 2014. p. 1-17.
- Shannag MJ, Higazey M. Strengthening and repair of a precast reinforced concrete residential building. Civil Engineering Journal. 2020 Dec;6(12):2457-73. https://doi.org/10.28991/cej-2020-03091630
- Chai YH, Anderson JD. Seismic response of perforated lightweight aggregate concrete wall panels for low-rise modular classrooms. Engineering Structures. 2005 Mar;27(4):593-604. https://doi.org/10.1016/j.engstruct.2004.12.001
- Fernando PLN, Jayasinghe MTR, Jayasinghe C. Structural feasibility of expanded polystyrene (EPS) based lightweight concrete sandwich wall panels. Construction and Building Materials. 2017 May;139:45-51. https://doi.org/10.1016/j.conbuildmat.2017.02.027
- Kurpinska M, Grzyl B, Kristowski, A. Cost analysis of prefabricated elements of the ordinary and lightweight concrete walls in residential construction. Materials. 2019 Nov;12(21):3629. https://doi.org/10.3390/ma12213629
- Vaghei R, Hejazi, F, Taheri H, Jaafar MS, Ali AAA. Evaluate performance of precast concrete wall to wall connection. APCBEE procedia. 2014 Sep;9:285-90. https://doi.org/10.1016/j.apcbee.2014.01.051
- Lakshmikandhan KN, Harshavardhan BS, Prabakar J, Saibabu S. Investigation on wall panel sandwiched with lightweight concrete. Proceeding of Materials Science and Engineering. 2017 Jul 3-4; Telangana, India. Bristol (England) IOP Conference Series: Materials Science and Engineering; 2017. p. 1-15. https://doi.org/10.1088/1757-899X/225/1/012275
- PCI Committee on Precast Sandwich Wall Panels. State of the art of precast/prestressed concrete sandwich wall panels. 2nd ed. Chicago (IL): Precast/Prestressed Concrete Institute; 2011. p. 1-63.
- Kim KH, Lee BS, Kim JW, Kim MJ, Sohn JR. Erection process analysis of external PC walls in the PC public apartment building with beam-column system. Proceeding of the Korea Concrete Institute. 2023 May 10-12; Busan, Korea. Seoul (Korea): the Korea Concrete Institute; 2023. p. 623-4.
- Kim KH, Lee BS, Lee DG, Kim MJ, Sohn JR. Erection process analysis of the PC staircase in the apartment building. Proceeding of the Korea Institute of Building Construction. 2023 Nov 9-10; Ansan, Korea. Seoul (Korea): the Korea Institute of Building Construction; 2023. p. 103-4.
- Kim KH, Lee BS, Kim JW, Kim MJ, Kim YH, Sohn JR. Work process classification of PC core walls and PC internal walls in LH rahmen PC apartment building. Proceeding of the Architectural Institute of Korea. 2023 Apr 26-28; Busan, Korea. Seoul (Korea): the Architectural Institute of Korea; 2023. p. 621-2.
- Kim KH, Lee BS, Ryu BG, Lee DG, Kim YH, Sohn JR. Optimal process analysis of external PC walls in the apartment building. Proceeding of the Architectural Institute of Korea. 2023 Oct 25-27; Gangwon, Korea. Seoul (Korea): the Architectural Institute of Korea; 2023. p. 456-7.
- Choi MS, Kim MH. An analysis on the labor and capital productivity of the construction industry. Architectural Institute of Korea. 2005 Aug;7(2):91-6.
- Kim JY, Choi JH, Lee SH. Factors Affecting the Losses of Domestic Construction Productivity and Strategies for Avoiding Them. Journal of the Architectural Institute of Korea Structure & Construction. 2011 Feb;27(2):113-24.