Acknowledgement
This work is supported in 2024 by the Korea Agency for Infrastructure Technology Advancement(KAIA) grant funded by the Ministry of Land, Infrastructure and Transport(Grant RS-2021-KA163269). This paper was also supported by the Shinsung A&E Research Grant, 2023.
References
- Jung YC, Lee BY, Kim GH. Application possibility of folding pre-fabricated rebar cage in domestic construction fields. Journal of the Korea Institute of Building Construction. 2010 Apr;10(2):125-32. https://doi.org/10.5345/JKIC.2010.10.2.125
- Adebowale OJ, Agumba JN. Applications of augmented reality for construction productivity improvement: a systematic review. Smart and Sustainable Built Environment. 2022 Sep;13(3):479-95. https://doi.org/10.1108/SASBE-06-2022-0128
- Kim JH, Hwang CG, Kim JH. A study on the revitalization of BIM in the field of architecture using AHP method. Journal of the Korea Institute of Building Construction. 2022 Oct;22(5):473-83. https://doi.org/10.5345/JKIBC.2022.22.5.473
- Korea Institute of Civil Engineering and Building Technology. BIM roadmap and activation strategies for public SOC projects. Sejong (Korea): Ministry of Land, Infrastructure and Transport. 2018 Sep. 50 p. Report No.: KICT 2018-029.
- Park, UY, Kim BJ, Jung HO, Yun SH, Jo HH, Gang GI. A study on the improvement of reinforcing bar detailing. Journal of the Korea Institute of Building Construction. 2008 Feb;8(1):83-90. https://doi.org/10.5345/JKIC.2008.8.1.083
- Wang D, Hu Y. Research on the intelligent construction of the rebar project based on BIM. Applied Sciences. 2022 May; 12(11):5596. https://doi.org/10.3390/app12115596
- Song CH, Kim CK, Lee SE, Choi HC. Establishment of rebar quantity estimation in BIM-based initial design phase. Journal of the Computational Structural Engineering Institute of Korea. 2016 Oct;29(5):447-54. http://dx.doi.org/10.7734/COSEIK.2016.29.5.447
- Kim SW, Kim SK, Suh SW, Kim SC. Development of an Algorithm for Automatic Quantity Take-off of Slab Rebar. Korean Journal of Construction Engineering and Management. 2023 Sep;24(5):52-62. https://doi.org/10.6106/KJCEM.2023.24.5.052
- Choi HC, Lee Y, Lee SE, Kim CKl. Development of 3-dimensional rebar detail design and placing drawing system. Journal of the Computational Structural Engineering Institute of Korea. 2014 Aug;27(4):289-96. https://doi.org/10.7734/COSEIK.2014.27.4.289
- Rachmawati TSN, Widjaja DD, Kim SK. Advancing an automated algorithm for estimating rebar quantities in. Journal of The Korea Institute of Building Construction, 2023 Aug;23(4):497-508. https://doi.org/10.5345/JKIBC.2023.23.4.497
- Li S, Shi Y, Hu J, Li S, Li H, Chen A, Xie W. Application of BIM to rebar modeling of a variable section column. Buildings. 2023 May;13(5):1234. https://doi.org/10.3390/buildings13051234
- Hong SU, Cho YS, Lee JH, Hong SC. The study on development of automatic reinforcement placing system of columns for RC structures based on parametric technology. Journal of Architectural Institute of Korea. 2011 Jan;27(21):11-8.
- Cho YS, Kim M, Hong SC. A study on automatic reinforcement placement system of isolated foundation based on S-BIM. Journal of the Architectural Institute of Korea Structure & Construction. 2013 Nov;29(11):21-8. https://doi.org/10.5659/JAIK_SC.2013.29.11.21
- Jang JW, Lee JH, Jang HS, Hong SU, Cho YS. A study on the reinforcing steel detailing methodology with improvement of interoperable system in the structural BIM environment focused on flat plate. Journal of the Architectural Institute of Korea Structure & Construction. 2012 Aug;28(8):3-10. https://doi.org/10.5659/JAIK_SC.2012.28.8.3
- Cho YS, Kim, DE, Jin HA, Jang HS. The study on the development of automatic rebar placement system applying selection method of optimum reinforcing bar group on shear wall. Journal of the Korea institute for structural maintenance and inspection. 2015 Jan;19(1):81-9. https://doi.org/10.11112/JKSMI.2015.19.1.081
- Lee JC. A study on the effective calculation of rebar QTO in the early design phase through the application of BIM model. Journal of the Architectural Institute of Korea Structure & Construction. 2019 May;35(5):145-52. https://doi.org/10.5659/JAIK_SC.2019.35.5.145
- Jung HO, Jo HH, Park UY. A study on the improvement of erection bar detailing in domestic building construction. Journal of the Korea Institute of Building Construction. 2009 Apr;9(2):39-46. https://doi.org/10.5345/JKIC.2009.9.2.039