과제정보
본 연구는 과학기술정보통신부의 재원으로 한국연구재단의 지원을 받아 수행된 연구입니다(NRF-2021R1A2C1014267). 본 논문은 2021 CONVENTION 논문을 수정·보완하여 작성되었습니다.
참고문헌
- Ahn, S. J. and Nam, K. Y. (2020). "A study on bridge construction risk analysis for third-party damage." Journal of the Korea Institute of Building Construction, Vol. 20, No. 2, pp. 137-145 (in Korean). https://doi.org/10.5345/JKIBC.2020.20.2.137
- Baek, S. W., Han, S. H. and Jung, W. Y. (2019). "A comparative analysis of risk assessment depending on international project types." Construction Engineering and Management, Vol. 20, No. 5, pp. 125-136 (in Korean).
- California Department of Transportation (Caltrans) (2012). Project risk management handbook : A scalable approach (version 1), Caltrans, California, USA.
- International Organization for Standardization (ISO) (2018). ISO31000: 2018, Available at: https://www.iso.org (Accessed : October 10, 2021).
- Karunarathne, B. V. G. and Kim, B. S. (2021). "Risk management application-level analysis in South Korea construction companies using a generic risk maturity model." KSCE Journal of Civil Engineering, KSCE, Vol. 25, No. 9, pp. 3235-3244. https://doi.org/10.1007/s12205-021-2277-x
- Lee, D. Y. and Kim, D. E. (2021). "A study on the probabilistic risk analysis for safety management in construction projects." Journal of the Korea Society of Computer and Information, Vol. 26, No. 8, pp. 139-147 (in Korean). https://doi.org/10.9708/JKSCI.2021.26.08.139
- Lee, K. T., Ann, H. N., Kim, J. W. and Kim, J. H. (2021). "A comparative analysis of risk impacts on cost overrun between actual cases and managers' perception on overseas construction projects." Korean Journal of Construction Engineering and Management, Vol. 22, No. 3, pp. 52-60 (in Korean). https://doi.org/10.6106/KJCEM.2021.22.3.052
- Park, K. M., Lee, H. W., Choi, K. H. and Lee, S. H. (2019). "Project risk factors facing construction management firms." International Journal of Civil Engineering. Vol. 17, No. 5, pp. 305-321. https://doi.org/10.1007/s40999-017-0262-z
- Project Management Institute (PMI) (2017). PMBOK guide (6th edtion), PMI, Pennsylvania, USA.
- Seong, J. H. and Jung, M. H. (2017) "Determination of priorities for management to reduce collapse accident of open excavation and road sink in urban areas." Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 3, pp. 489-501 (in Korean). https://doi.org/10.9711/KTAJ.2017.19.3.489
- Seong, J. H., Jung, S. H. and Sin, J. Y. (2011) "A study for safety management on ground excavation by analysis of accident events." Journal of the Korea Institute for Structural Maintenance and Inspection, Vol. 15, No. 6, pp. 175-183 (in Korean). https://doi.org/10.11112/JKSMI.2011.15.6.175