DOI QR코드

DOI QR Code

A numerical study on the behavior of existing and enlarged tunnels when widened by applying the pre-cutting method

Pre-cutting 공법을 적용한 터널 확폭 시 기존 및 확폭터널의 거동에 관한 수치해석적 연구

  • Kim, Han-Eol (Dept. of Civil and Environmental Engineering, Hanyang University) ;
  • Nam, Kyoung-Min (Dept. of Civil and Environmental Engineering, Hanyang University) ;
  • Ha, Sang-Gui (Dept. of Civil and Environmental Engineering, Hanyang University) ;
  • Yoo, Han-Kyu (Dept. of Civil and Environmental Engineering, Hanyang University)
  • 김한얼 (한양대학교 건설환경공학과) ;
  • 남경민 (한양대학교 건설환경공학과) ;
  • 하상귀 (한양대학교 건설환경공학과) ;
  • 유한규 (한양대학교 건설환경공학과)
  • Received : 2020.06.13
  • Accepted : 2020.07.09
  • Published : 2020.07.31

Abstract

Aging tunnels with small cross-sections can cause chronic traffic jams. This problem can be solved by widening the tunnel. In general, when the tunnel is expanded, the outer portion of the existing tunnel is excavated through a mechanical or blasting method. Such excavation affects not only the surrounding ground but also the existing tunnel. The application of the pre-cutting method can be a solution to these problems effectively. Therefore, if the widening of tunnel is performed by applying pre-cutting method, analysis of the impact of this method must be performed. In this study, in order to analyze the effect of applying pre-cutting in tunnel widening, numerical analysis is performed at six ground grades, from grade I to weathered rock. The analysis is performed with the expanding lane and the excavation length of pre-cutting as variables. In addition, the analysis is focused on the displacement of crown of the existing tunnel and the enlarged tunnel. As a result, the crown displacement of the enlarged tunnel is confirmed to converge at the same value regardless of the excavation length of the pre-cutting when the tunnel widening is completed. In the case of existing tunnels, uplift of crown occurs within 5 m of the front of the tunnel surface, and the shorter the excavation length of pre-cutting is found to be effective in preventing the occurrence of uplift.

단면이 작게 만들어진 노후화된 터널은 만성적인 교통정체를 유발한다. 이는 터널의 확폭을 통하여 해결할 수 있다. 일반적으로 터널을 확폭할 경우, 기계식 또는 발파식 굴착방법을 통하여 기존터널의 외곽부를 굴착하게 된다. 이러한 굴착은 주변 지반뿐만 아니라 기존터널에도 영향을 미치게 된다. Pre-cutting 공법의 적용은 이러한 문제를 효과적으로 해결할 수 있는 방법이 될 수 있다. 따라서 Pre-cutting을 적용하여 확폭을 수행할 경우, 이에 따른 영향분석은 필수적으로 수행되어야 한다. 본 연구에서는 터널 확폭에서 Pre-cutting을 적용할 경우, 이에 따른 영향을 분석하기 위하여 6가지의 지반등급에서 수치해석을 수행하였다. 해석에서는 확대차로와 Pre-cutting의 굴착길이를 변수로 하여 수행하였으며, 기존터널과 확폭터널의 천단침하에 주목하여 분석하였다. 그 결과, 확폭터널의 천단침하는 확폭이 완료가 되면, Pre-cutting의 굴착 길이와 상관 없이 동일한 값으로 수렴하는 것을 확인하였다. 기존터널의 경우, 굴진면의 전방 5 m 내에서 융기가 발생하였으며, Pre-cutting의 굴착 길이가 짧을수록 융기 발생 예방에 효과적인 것으로 나타났다.

Keywords

References

  1. Cha, Y.H., Cho, G.C., Hong, E.S. (2016), "The numerical study on the ground settlement behavior of box type tunnel enlargement", Journal of Korean Tunnelling and Underground Space Association, Vol. 18, No. 1, pp. 83-94. https://doi.org/10.9711/KTAJ.2016.18.1.083
  2. Cho, G.C., Joo, G.W., Oh, T.M., Hong, E.S. (2016), "New hydro-mechanical tunnel excavation method using an abrasive waterjet system", Japanese Geotechnical Society Special Publication, Vol. 4, No. 6, pp. 132-137. https://doi.org/10.3208/jgssp.v04.k06
  3. Doo, J.K., Yang, H.S. (2001), "Effects of burden and free surface on the blast vibration", Explosives and Blasting, Vol. 19, No. 3, pp. 59-65.
  4. Khan, B., Jamil, S.M., Jafri, T.H., Akhter, K. (2019), "Effects of different empirical tunnel design approaches on rock mass behaviour during tunnel widening", Heliyon, Vol. 5, No. 12, pp. 1-20.
  5. Ki, K.C., Kim, I.J. (2002), "A study on the ground vibration of the front and the back direction of the free face in the bench blasting", Explosives and Blasting, Vol. 20, No. 2, pp. 21-31.
  6. Kim, D.K. (2006), "Study on Mohr-Coulomb and Duncan-Chang models in tunnel analysis", Journal of the Korea Academia-Industrial Cooperation Society, Vol. 7, No. 3, pp. 414-419.
  7. Kim, W.K., Baek, K.H., Seo, K.W. (2008), "The behavior characteristics of a working tunnel by the type of enlargement and ground strength", Proceedings of the 2008 Convention of Korea Society of Civil Engineers, Vol. 2008, No. 10, Daejeon, pp. 4152-4155.
  8. Lee, H.B., Koh, S.Y., Jun, J.H., Yoon, H.T., Yi, N.H., Choi, H.S. (2020a), "Fundamental study on enlargement method of existing subway tunnel during operation for sidetrack construction", Journal of Korean Tunnelling and Underground Space Association, Vol. 22, No. 1, pp. 59-76. https://doi.org/10.9711/KTAJ.2020.22.1.059
  9. Lee, J.H., Jin, H.S., An, J.S., Baek, Y., Yoon, H.S. (2020b), "A study on the suitability of the Mohr- Coulomb model for numerical analysis of ground excavation", The Journal of Engineering Geology, Vol. 30, No. 1, pp. 1-15. https://doi.org/10.9720/KSEG.2020.1.001
  10. Lee, K.K., Kim, G.S., Yang, K.J., Kang, D.W., Hur, W.H. (2012), "A study on movement of the free face during bench blasting", Explosives and Blasting, Vol. 30, No. 2, pp. 29-42.
  11. Lee, M.H., Kim, B.J., Jang, Y.S., Yun, J.N., Park, H.G. (2013), "Behavior and pillar stability of enlarged existing parallel tunnels", Journal of Korean Tunnelling and Underground Space Association, Vol. 15, No. 5, pp. 537-546. https://doi.org/10.9711/KTAJ.2013.15.5.537
  12. Lunardi, G., Agresti, S., Basta, D. (2016), "The widening of the "Montedomini" A14 motorway tunnel in the presence of traffic", Proceedings of the ITA-AITES World Tunnel Congress 2016 (WTC 2016), San Francisco, pp. 1-10.
  13. Lunardi, G., Belfiore, A., Selleri, A., Trapasso, R. (2014), "Widening the "Montedomini" tunnel in the presence of traffic: the evolution of the "Nazzano" method", Proceedings of the ITA-AITES World Tunnel Congress 2014 (WTC 2014), Foz do Iguacu, pp. 1-10.
  14. Oh, S.W., Min, G.J., Park, S.W., Park, H., Noh, Y.S., Suk, C.G., Cho, S.H. (2018), "A study on the effect of artificial cutting slot on the fragmentation and vibration propagation in the full-scaled concrete block blasting", Tunnel and Underground Space, Vol. 28, No. 6, pp. 692-705. https://doi.org/10.7474/TUS.2018.28.6.692
  15. Oh, T.M., Cho, G.C., Ji, I.T. (2013), "Effects of free surface using waterjet cutting for rock blasting excavation", Journal of Korean Tunnelling and Underground Space Association, Vol. 15, No. 1, pp. 49-57. https://doi.org/10.9711/KTAJ.2013.15.1.049
  16. Oh, T.M., Joo, G.W., Cho, G.C., Ji, I.T., Jeong, S.Y. (2012), "Vibration reduced rock excavation using waterjet technology", Proceedings of the 2012 World Congress on Advances in Civil, Environmental, and Materials Research (ACEM' 12), Soeul, pp. 3318-3323.
  17. Park, J.J. (2012), Analysis of tunnel loads by considering different soil conditions, Master Thesis, Yonsei University, pp. 38-39.
  18. Richart, F.E., Woods, R.E., Hall, J.R. (1970), Vibration of Soils and Foundations, Prentice-Hall, New Jersey, pp. 247-262.
  19. Santamarina, J.C., Klein, K.A., Fam, M.A. (2001), Soils and Waves, John Wiley & Sons, New York, pp. 195-200.
  20. Seo, K.W., Baek, K.H., Kim, W.K. (2008), "A study on the ground behavior by the enlarged tunnel area", Proceedings of the 2008 Convention of Korea Society of Civil Engineers, Vol. 2008, No. 10, Daejeon, pp. 4180-4183.
  21. Walsum, E.V. (1991), "Mechanical pre-cutting, a rediscovered tunneling technique", Rock Mechanics and Rock Engineering, Vol. 24, No. 2, pp. 65-79. https://doi.org/10.1007/BF01032499
  22. Wang, T., Wang, X., Tan, Z., Li, K., He, M. (2018), "Studies on ground settlement and pre-arching stress of pre-cutting tunnelling method", Tunnelling and Underground Space Technology, Vol. 82, pp. 199-210. https://doi.org/10.1016/j.tust.2018.08.021
  23. You, K.H., Jin, S.H., Kim, Y.J. (2017), "A stability study of deep and double-deck tunnels considering shape and reinforcing method of an enlarged section by using numerical analyses", Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 1, pp. 41-56. https://doi.org/10.9711/KTAJ.2017.19.1.041
  24. Zhang, X., Li, J., Xia, Y., Lin, L., Li, M., Chen, L. (2020), "Cutting characteristics and layout of pre-cutting machine cutter", Periodica Polytechnica Civil Engineering, Vol. 64, No. 1, pp. 188-197.