• Title/Summary/Keyword: 천단침하

Search Result 61, Processing Time 0.025 seconds

Relations between Initial Displacement Rate and Final Displacement of Arch Settlement and Convergence of a Shallow Tunnel (저심도 터널의 천단침하 및 내공변위의 초기변위속도와 최종변위의 관계)

  • Kim, Cheehwan
    • Tunnel and Underground Space
    • /
    • v.23 no.2
    • /
    • pp.110-119
    • /
    • 2013
  • It is generalized to measure the arch settlement and convergence during tunnel construction for monitoring its mechanical stability. The initial convergence rate a day is defined from the first convergence measurement and the final convergence defined as the convergence measured lastly. The initial and the final tunnel arch settlement are defined like the preceding convergence. In the study, the relations between the initial and final displacements of a shallow tunnel are analyzed. The measurements were performed in the tunnel of subway 906 construction site in Seoul. The overburden is 10-20 m and the tunnel goes through weathered soil/rock. The width and height of the tunnel are about 11.5 m, 10m, respectively. So this is a shallow tunnel in weak rock. The length of tunnel is about 1,820 m and the tunnel was constructed in 2 stages, dividing upper and lower half. The numbers of measurement locations of arch settlement and convergence are 184 and 258, respectively. As a result, the initial displacement rate and the final displacement are comparatively larger in the section of weathered soil.

Measurement of Tunnel Arch Settlements Ahead of and Behind the Tunnel Face Using a Horizontal Inclinometer and Settlement Pins (수평경사계와 천단침하계에 의한 터널막장 전후방의 천단침하 계측)

  • Kim, Cheehwan
    • Tunnel and Underground Space
    • /
    • v.23 no.2
    • /
    • pp.120-129
    • /
    • 2013
  • It is important to measure the displacement behind and ahead of a tunnel face during construction for evaluating mechanical stability by comparing it to a displacement criteria set by tunnel designers. The 30 m long horizontal inclinometer was installed frontward from the tunnel face and the displacement occurred ahead of a tunnel face during excavation was measured by using it. Tunnel arch settlements behind tunnel face were surveyed using a settlement pins on the arch. So total settlement and longitudinal displacement curve were obtained combining settlement measured by both the horizontal inclinometer ahead of tunnel face and the settlement pins behind the tunnel face.

The prediction of deformation according to tunnel excavation in weathered granite (화강 풍화암지반의 터널굴착에 따른 변형예측)

  • Cha, Bong-Geun;Kim, Young-Su;Kwo, Tae-Soon;Kim, Sung-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.4
    • /
    • pp.329-340
    • /
    • 2010
  • Mechanical behavior of underground cavity construction such as tunnel is very difficult to estimate due to complexity and uncertainty of ground. Prediction of behavior according to excavation of tunnel mainly uses method utilized of model test or numerical analysis. But scale model test is difficult to reappear field condition, numerical analysis is also very hard to seek choice of suitable constituent model and input data. To solve this problem, this paper forecasted the deformation of tunnel that applied to information of crown settlement and convergence, RMR in weathered granite by using the regression analysis. The result of the analysis shows that the crown settlement according to excavation occurs approximately 70~80% of total displacements within about 20 days. As a result of the prediction of crown settlement and convergence, an exponential function becomes more accurate at measurements than an algebraic function. Also this paper got a correlation in comparison of RMR and displacements of 6 sections.

Application for Prediction of Crown Settlements Using RMR in Weathering Rock Tunnels (RMR을 이용한 풍화암 터널의 천단침하량 예측 평가)

  • Kim, Young-Su;Kim, Dae-Man
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.10
    • /
    • pp.67-76
    • /
    • 2009
  • Statistical analysis was performed using a series of data on RMR, RMR* and crown settlements collected from sites of weathering rock tunnels in Korea. The crown settlements were predicted by recurrence analysis, exponential function, and artificial neural network (ANN) using collected in-situ data. The result of the prediction fitted well compared to the measured settlement in the order of ANN, exponential function, and recurrence analysis. The range of crown settlement predicted by recurrence analysis widely scattered and promised larger settlement than the measured. Also in all method, the predicted value by RMR well matched compared to the measured settlement predicted by RMR*.

Comparative Analysis of Fault Prediction with Horizontal and Longitudinal Displacements on Tunnel (터널 굴진면 수평변위와 천단변위를 이용한 단층대 예측방법의 비교·분석)

  • Yun, Hyun-Seok;Seo, Yong-Seok
    • The Journal of Engineering Geology
    • /
    • v.26 no.3
    • /
    • pp.403-411
    • /
    • 2016
  • A three-dimensional finite element analysis was conducted to analyze the predictable distances of a fault zone by using longitudinal displacement on tunnel face, trend line, L/C ratio, and C/C0 ratio at tunnel crown. The analysis used 28 numerical models with various fault attitudes. As a result, those faults that have drives with dip could be predicted earliest in L/C and C/C0 ratio analysis. And those faults that have drives against dip could be predicted earliest in L/C ratio and longitudinal displacement analysis. In addition, the fault zone ahead of tunnel was predicted in most models by using longitudinal displacement, trend line, L/C ratio, and C/C0 ratio. However, the longitudinal displacement among these methods may be most usefully predict a fault zone since it is displacements can be measured immediately after tunnel excavation.

Tunnel Convergence and Crown Observation using Industrial Photogrammetry (산업사진측량을 이용한 터널의 천단 및 내공 변위 관측)

  • Jung Sung Hyuk;Lee Jae Kee
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.22 no.3
    • /
    • pp.209-215
    • /
    • 2004
  • Together with the requirements of tunnels, its construction methods and technologies have been pretty much developed, but frequent accidents happened under the constructions are just one of important problems which should be improved. To detect the potential hazardous factors in or ahead of time, speedy and accurate observation are absolutely required, but currently surveying method using tapes, level and total station, has been generally taken in measuring of tunnel convergence and crown. The purpose of this study is, as using of industrial photogrammetry system which is supplying more accuracy and speedy in the measure of tunnel convergence and crown. From the result of this study, we have got up to 1/20,000 accuracy and totally 6 minutes, from picturing 5 sections by one person to data edition, has been taken except setting targets.

Comparative analysis of ground settlement and tunnel displacement due to tunnel excavation considering topographic information based on GIS (GIS 기반 지형 정보를 고려한 터널 굴착에 따른 지반침하와 터널 변위 비교 분석)

  • Jae-Eun, Cho;Ye-Rim, Jung;Seong-Min, Song;Ji-Seok, Yun;Sang-Gui, Ha;Han-Kyu, Yoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.1
    • /
    • pp.13-26
    • /
    • 2023
  • Recently, as the development of underground spaces has become active due to rapid urbanization and population density, interest in the ground behavior according to the construction of underground spaces is increasing. In large cities with high population density and many buildings, ground subsidence has a great impact on structures and there may be a risk of collapse, so the analysis of ground behavior due to underground construction is essential. Previous studies have been conducted on the subsidence pattern of the surface and the deformation of the tunnel when constructing the tunnel, but analysis has rarely been conducted by using actual topographic information. Therefore, this study analyzed the difference in ground behavior between the actual topography and the flat topography. As a result, it was confirmed that ground settlement occurs at higher elevations, such as in mountainous topography, and when the numerical analysis is performed considering topographical information, the crown settlement of the tunnel is up to about approx. It showed a difference of 10 mm, and it was found that the sensitivity was less in the case of displacement of tunnel wall compared to the crown settlement and ground settlement. The numerical analysis considering the actual GIS-based topographic information presented in this study can be used to obtain more accurate surface subsidence data to understand the behavior of the upper structure due to tunnel excavation.

Tunnel Convergence and Crown Settlement Using 3D Laser Scanning (3 차원 레이저 스캐닝을 이용한 터널의 천단 및 내공 변위 관측)

  • Lee, Jae-One;Yun, Bu-Yeol
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.15 no.2 s.40
    • /
    • pp.67-75
    • /
    • 2007
  • There are a number of risks in constructing tunnel-structures. Therefore, the precise and rapid observation about inside deformation of the tunnel is required to prevent these risks from occurring and to secure safety. But currently, the real situation is that the crown settlement, cavity deformation and ground surface settlement rely upon the universal mensuration which uses total station or various kinds of measuring instruments. Recently, according to improvement and progress of measuring technology, three-dimensional laser scanning is used as the method to provide data for maintaining structures. It solves the reliability problem of measuring method for the transformational volume of existing structures, provides data that enables to judge visually by three-dimensioning the shape change of structures and makes it possible to deliberate speedy countermeasure. And it can also be efficiently used in the structure maintenance and field measurement.

  • PDF

A Study on the Mechanical Characteristics of Tunnel Structures and Ground Behavior by Synthetic Analysis Method with Tunnel Monitoring Results used (터널의 계측결과 종합분석에 의한 지반의 거동 및 터널 구조체의 역학적 특성 연구)

  • Woo, Jong-Tae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.3
    • /
    • pp.115-124
    • /
    • 2003
  • In this study, the relationships between the displacement and stress of the tunnel using various analysis methods were compared with monitoring results carried out during construction and maintenance monitoring. The behavior of tunnel were measured in the subway tunnel passing comparative soft the weathering and analyzed both security and mechanical characteristics of the tunnel lining. With the results of simplified monitoring observed in top heading and bench excavation tunnel, it is confirmed that the crown settlement is larger than the surface settlement. it is interesting to note that the crown settlement and the crown shotcrete lining stress are widely used monitoring items for the back analysis. It is analyzed that the residual water pressure applied in the drainage type tunnel is reasonable.

Field Measurements of Ground Movements Around Tunnel (현장계측에 의한 터널주변지반의 변위연구)

  • 홍성완;배규진
    • Geotechnical Engineering
    • /
    • v.1 no.2
    • /
    • pp.41-54
    • /
    • 1985
  • Generally, ground settlements and lateral displacements are accompanied by underground excavation associated with open-cut or tunnling. These ground movements cause a harmful influence upon nearby super.structures and sub-structures. Occasionally, the ground movements may pose serious problems as the function of the nearby structures may be disrupted. Therefore, prior to the subway construction in an urban area, it is necessary to identify the causes of ground settlements and estimating the extent St the magnitude of ground movements since any potential damage to the nearby structures such as gas lines, water mains, high buildings and cultural assets must be assessed. The research was performed mainly on ground movements such as surface settlements, lateral displacements, subsurface settlements and crown settlements to predict the maximum settlement and settlement zone, and to identify the causes of ground settlements in NATM sections of Busan subway. As a result, it was found that lateral distribution of settlements could be approximated reasonably by a Gaussian normal probability curve and longitudinal distribution of settlements by a cumulative Gaussian probability curve, and that the early closure of temporary invert was very important to minimize ground settlements.