• Title/Summary/Keyword: Pre-cutting method

Search Result 41, Processing Time 0.028 seconds

A numerical study on the behavior of existing and enlarged tunnels when widened by applying the pre-cutting method (Pre-cutting 공법을 적용한 터널 확폭 시 기존 및 확폭터널의 거동에 관한 수치해석적 연구)

  • Kim, Han-Eol;Nam, Kyoung-Min;Ha, Sang-Gui;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.451-468
    • /
    • 2020
  • Aging tunnels with small cross-sections can cause chronic traffic jams. This problem can be solved by widening the tunnel. In general, when the tunnel is expanded, the outer portion of the existing tunnel is excavated through a mechanical or blasting method. Such excavation affects not only the surrounding ground but also the existing tunnel. The application of the pre-cutting method can be a solution to these problems effectively. Therefore, if the widening of tunnel is performed by applying pre-cutting method, analysis of the impact of this method must be performed. In this study, in order to analyze the effect of applying pre-cutting in tunnel widening, numerical analysis is performed at six ground grades, from grade I to weathered rock. The analysis is performed with the expanding lane and the excavation length of pre-cutting as variables. In addition, the analysis is focused on the displacement of crown of the existing tunnel and the enlarged tunnel. As a result, the crown displacement of the enlarged tunnel is confirmed to converge at the same value regardless of the excavation length of the pre-cutting when the tunnel widening is completed. In the case of existing tunnels, uplift of crown occurs within 5 m of the front of the tunnel surface, and the shorter the excavation length of pre-cutting is found to be effective in preventing the occurrence of uplift.

Prediction of Relative Deformation between Cutting Tool and Workpiece by Cutting Force [$1^{st}$ paper] (절삭력에 의한 공구와 공작물의 상대적 변형량 예측 [1])

  • Hwang, Young-Kug;Lee, Choon-Man
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.27 no.9
    • /
    • pp.86-93
    • /
    • 2010
  • Any relative deformation between the cutting tool and the workpiece at the machining point, results directly in form and dimensional errors. The source of relative deformations between the cutting tool and the workpiece at the contact point may be due to thermal, weight, and cutting forces. Thermal and weight deformations can be measured at various positions of the machine tool and stored in the compensation registers of the CNC unit and compensated the errors during machining. However, the cutting force induced errors are difficult to compensate because estimation of cutting forces are difficult. To minimize the error induced by cutting forces, it is important to improve the machining accuracy. This paper presents the pre-calculated method of form error induced by cutting forces. In order to estimate cutting forces, Isakov method is used and the method is verified by comparing with the experimental results. In order to this, a cylindrical-outer-diameter turning experiments are carried out according to cutting conditions.

Growth Characteristics as Influenced by Cutting Site and Planting Method in Autumn Field Cutting of Sedum sarmentosum (돌나물의 가을 노지삽목에서 삽수부위 및 삽식방법에 따른 생육특성)

  • Ahn, Jeong-Ho;Kwon, Ji-Woong;Bae, Jong-Hyang;Lee, Seung-Yeob
    • Journal of Bio-Environment Control
    • /
    • v.17 no.1
    • /
    • pp.60-65
    • /
    • 2008
  • For autumn field cutting of Sedum sarmentosum, the effects of cutting site (distal, middle, and proximal) and planting method (space drill seeding, drill seeding, and broadcast seeding) on survival rate and growth characteristics were investigated at pre- and post-winter season. Plant height root length, stem number per plant, number of branch per plant, fresh weight of shoot, and dry weight of shoot were significantly superior in distal site at pre-wintering (40 days after cutting). At post-wintering (May 10th), stem number per plant, fresh weight and dry weight per $m^2$ in cutting of distal site showed a significant increasement compared to the cutting of proximal site. At pre-wintering (40 days after cutting), the growth in space drill seeding was well than that in drill seeding and broadcast seeding, and fresh weight and dry weight per $m^2$ in space drill seeding were high in order of space drill seeding, broadcast seeding, and drill seeding. At post-wintering (May 10th), stem number per plant, fresh weight and dry weight per $m^2$ in space drill seeding were significantly increased than those in drill seeding. Accordingly, the cutting using distal site of stem in autumn field cutting was desirable for the growth and shoot yield. The space drill seeding showed the highest yield potential among three seeding methods, but broadcast seeding was favorable in saving of labor, because the fresh weight of shoot in broadcast seeding was similar in the space drill seeding at post-wintering.

A hybrid cutting technology using plasma and end mill for decommissioning of nuclear facilities

  • Choi, Min-Gyu;Lee, Dong-Hyun;Jeong, Sang-Min;Figuera-Michal, Darian;Seo, Jun-Ho
    • Nuclear Engineering and Technology
    • /
    • v.54 no.3
    • /
    • pp.1145-1151
    • /
    • 2022
  • A hybrid cutting using both plasma and end mill was developed for safe and efficient dismantling of nuclear facilities. In this cutting method, a moving arc plasma heats up the workpiece before milling. Thermally softened part of the workpiece is then removed quickly and deeply with an end mill. For the cutting experiments, a three-axis numerical control (NC) milling machine was combined with a commercialized arc plasma torch and used to cut 25 mm thick stainless steel plates. Experimental results revealed that pre-heating by arc plasmas can improve the cutting volume per unit time higher than 40% by reducing the cutting load and increasing the cuttable depth when using an end mill without cutting fluids. These advantages of a hybrid cutting process are expected to contribute to quick and safe segmentations of metal structures with radioactively contaminated inner surfaces.

Development of Centering Method for Automatic Generation of a Quadrilateral Mesh

  • Choi, Jinwoo
    • International Journal of CAD/CAM
    • /
    • v.11 no.1
    • /
    • pp.11-17
    • /
    • 2011
  • A new method has been developed in this paper for automatic quadrilateral mesh generation for a two-dimensional domain. The method is named 'centering method' because it centers a point at the domain and then divides it into sub-domains using cutting lines from the center point. Each of the cutting lines is selected based on the criterion using the angles between the boundary of the domain and the cutting line. The decomposition of the domain into sub-domains is repeated until every subdomain has four or six nodes. Pre-defined splitters are used to divide six-node domains into quadrilateral elements depending on their configuration and presence on the boundary of the initial domain. Arbitrary domains are meshed as examples to verify the robustness of the new method.

  • PDF

The Improvement of Excavation Efficiency of Roadheader by Using Pre-Cracked Method in High Strength Rock (선균열공법을 활용한 고강도 암반구간 로드헤더 굴진효율 향상방안 연구)

  • Hyung-Ryul Kim;Sang-Jun Jung;Jun-Ho Kang
    • Tunnel and Underground Space
    • /
    • v.33 no.3
    • /
    • pp.141-149
    • /
    • 2023
  • Recently, as the demand for urban underground space increases, urban tunnel planning is actively progressing. In particular, the application of the roadheader excavation method, which has favorable applicability to urban tunnel, is increasing. However, it is known that the roadheader excavation method has a limitation in that excavation efficiency for high strength rock with a Uniaxial Compressive Strength (UCS) of 100 MPa or more is lowered. In this study, The pre-cracked method was presented as a method to improve the excavation efficiency of roadheader for high strength rock and its applicability was evaluated. The net cutting rate was evaluated using the Bilgin prediction formula, which can calculate the net cutting rate by considering the UCS and RQD (Rock Quality Designation). It was found that the net cutting rate increased as the RQD decreased under the rock condition with the same UCS. This is judged to increase the excavation efficiency of the roadheader in the jointed high strength rock. Additionally, the field applicability of the pre-cracked method for high strength rock was verified through field tests. It was confirmed that the crack zone was formed around the charging hole, and it is considered that the pre-cracked method can be applied to the high strength rock.

A Study of Improvement Method and Analysis of Type of Revegetation Measures of Rock Slopes (비탈면 녹화공법의 유형분석과 개선방안 연구)

  • Jeon, Gi-Seong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.5 no.5
    • /
    • pp.22-29
    • /
    • 2002
  • This study was conducted to suggest develop revegetation methods and to classification of cutting-rock slopes revegetation type. The data was collected from pre-experienced data, reports and journal. Also research result was reflected from field research for the conditions of construction, vegetation types and field conditions. As the result of analyze, the factors affecting the plant coverage rates of cutting-rock slopes were period of construction, revegetation methods, slope gradient and slope length. Classification of cutting-rock slopes revegetation type was fourth from material of revegetation measures and spray type. It is recommended to adjust the proposed factor as environment, field condition and characteristic related with revegetation measures on slopes for the presentation of revegetation standard.

Measurement and assessment of imperfections in plasma cut-welded H-shaped steel columns

  • Arasaratnam, P.;Sivakumaran, K.S.;Rasmussen, Kim J.R.
    • Steel and Composite Structures
    • /
    • v.6 no.6
    • /
    • pp.531-555
    • /
    • 2006
  • H-shaped welded steel column members are fabricated by welding together pre-cut flanges and the web. Modern fabricators are increasingly using plasma-cutting technique instead of traditional flame cutting. Different fabrication techniques result in different degrees of geometric imperfections and residual stresses, which can have considerable influence on the strength of steel columns. This paper presents the experimental investigation based temperature profiles, geometric imperfections, and built-in residual stresses in plasma cut-welded H-shaped steel column members and in similar flame cut-welded H-shaped steel columns. Temperature measurements were taken during and immediately after the cutting operations and the welding operations. The geometric imperfections were established at closely spaced grid locations on the original plates, after cutting plates into plate strips, and after welding plate strips into columns. Geometric imperfections associated with plasma cut element and members were found to be less than those of the corresponding elements and members made by flame cutting. The "Method of Section" technique was used to establish the residual stresses in the plate, plate strip, and in the welded columns. Higher residual stress values were observed in flame cut-welded columns. Models for idealized residual stress distributions for plasma cut and flame cut welded sections have been proposed.

Influence of Different Methods of Cutting Ampules on Drug Contamination by Glass Flakes from the Ampule (유리앰플 주사제 개봉방법이 유리조각 혼입 및 약물오염에 미치는 영향)

  • Jeong, Hyeon-Cheol;Jeon, Mi-Yang
    • Journal of Korean Academy of Fundamentals of Nursing
    • /
    • v.16 no.2
    • /
    • pp.207-213
    • /
    • 2009
  • Purpose: This study was done to examine how medication contamination in a single-dose glass ampule is affected by minute glass flakes generated in different methods of cutting the ampule. Method: Sixty medication-containing glass ampules were randomly assigned to two groups. The number of glass flakes, resulting from two different cutting methods (with cotton and without cotton), were counted under the microscope. Contamination was evaluated by extracted the medication with a syringe and culturing it in E. coli, coliform, and aerobic bacteria culture media. Result: Fewer glass flakes were found in the ampules when the ampule was cut with cotton. The use of cotton, however, did not significantly change the degree of drug contamination. Conclusion: Although minute glass flakes generated in the ampule cutting operation did not significantly contaminate the medication and the use of cotton decreased the number of glass flakes in the ampules, glass flakes injected into the blood and tissues of the patient remain a risk factor. Therefore, pre-filled syringes or syringes with filters would be alternative methods and safeguards against the possible injection of glass flakes generated while cutting the ampule.

  • PDF

Slope stability method establish and carry out in vertical slope for tunnel excavation (터널의 굴착을 위한 수직사면의 안정대책 방안 수립 및 시행)

  • Park, Chal-Sook;Kim, Jun-Yong;Kwan, Han;Kim, Min-Jo;Choi, Yu-Kyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.992-1006
    • /
    • 2008
  • The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. Cutting-slope adjacent to outlet of spillways had been originally designed to be 63 degrees and about 65m in height. Examination is carried out in preceding construction that it is caused to some problems possibility which of machine for slope cutting couldn't approach to the site, blasting for cutting slope might have negative influence on highway and roads nearby, and fine view along the Tae-hwa river would be eliminated. In order to establish stability of tunnel and more friendly natural environment that we are carry out detailed geological surface survey and analysis of slope stability. So, we are design and construct for tunnel excavation with possible method that it is keep up natural slope. The result of survey and analysis that natural slope was divided 3 zone(A, B, C zone). In A and B zone, in first removed floating rock, high tensile tension net is install that it prevent of release and falling of rock, in order to security during under working. In addition to, pre-stressed rock anchor is install purpose of security during tunnel excavation because of fault zone near vertical developed above excavation level. Zone C is relatively good condition of ground, design is only carry out random rock bolt. All zone are designed and constructed drainage hole for groundwater and surface water is easily drain. Desinged slpoe is harmony with near natural environment. Successfully, construction is completed.

  • PDF