Preliminary Construction Cost Prediction Model Based on Module for Modernized Hanok

초기 기획단계의 신한옥 공사비 예측 모델 - 모듈(칸) 기반의 목공사 개략 물량 산출 중심으로 -

  • Received : 2020.03.25
  • Accepted : 2020.04.13
  • Published : 2020.05.31

Abstract

Prediction of construction cost in the planning stage that provides basic information for feasibility study, budgeting, and planning is an important factor for successful project execution. In this study, a prediction model was developed for the purpose of improving the accuracy of estimating the construction cost of Hanok in the planning stage. The cost of this model is estimated by two methods. First, the cost of wood work, which accounts for the largest portion of the total construction cost, is estimated by calculating the approximate quantity under various conditions (structure type, roof type, plane type, etc.). Second, the cost of the rest work sections except the wood work is estimated by using the unit cost model. The predictive model was verified by two case projects, and the error rate of total construction cost was -4%(case 1) and -6%(case 2). These results showed an error rate in the range that can be applied to practice in the planning stage.

기획단계에서의 공사비 예측은 타당성 분석, 예산 책정, 계획수립 등을 위한 기초정보를 제공한다는 점에서 성공적인 프로젝트 수행을 위한 중요한 요소이다. 본 연구에서는 초기 기획단계의 신한옥 공사비 예측 정확도 향상을 목적으로 전체 공사비 중 가장 많은 비중을 차지하는 목공사는 다양한 조건(구조형식, 지붕형태, 평면형태 등)에 의해 개략 물량을 자동 산출하여 공사비를 예측하고, 이외의 공종은 단위단가식을 적용해 공사비를 예측하는 모델을 제시하였다. 2개의 사례를 대상으로 개략 견적 모델로써의 활용성 및 타당성을 검증하였으며, 총공사비의 오차율은 각각 -4%(사례 1), -6%(사례2)로 나타났다. 이러한 결과값은 초기 기획단계에서 실무활용 가능한 범위에서의 오차를 보였다.

Keywords

References

  1. Cho, Y., and Kim, W. (2012). "A Study on Modular Coordination About The New Korea Traditional Housing: According to the Analysis Intercolumniation." Journal of the Architectural Institute of Korea Planning & Design, 28(10), pp. 183-190. https://doi.org/10.5659/JAIK_PD.2012.28.10.183
  2. Czarnigowska, A., and Sobotka, A. (2014). "Estimating Construction Duration for Public Roads During the Preplanning Phase." Journal of Engineering, Project and Production Management, 4(1), pp. 26-35. https://doi.org/10.32738/JEPPM.201401.0004
  3. Dursun, O., and Stoy, C. (2012). "Determinants of Construction Duration for Building Projects in Germany." Engineering Construction and Architectural Management, 19(4), pp. 444-468. https://doi.org/10.1108/09699981211237139
  4. Kim, J. (2012). "A Study on Planning and Composition of Module Unit in Korean Traditional House." Journal of the Korean Housing Association, 23(4), pp. 41-48. https://doi.org/10.6107/JKHA.2012.23.4.041
  5. Kim, M., Kim, Y., Lee, Y., and Jung, Y. (2013). "Comparative Analysis of Construction Productivity for Modernized Korean Housing (Hanok)." Korean Journal of Construction Engineering and Management, KICEM, 14(3), pp. 107-114. https://doi.org/10.6106/kJCEM.2013.14.3.107
  6. Kim, M., Kim, H., Ryu, J., and Jung, Y. (2014). "New Building Materials and Methods for Modernized Korean Housing (Hanok)." Korean Journal of Construction Engineering and Management, KICEM, 15(2), pp. 23-32. https://doi.org/10.6106/KJCEM.2014.15.2.023
  7. Ministry of Land, Infrastructure and Transport (MOLIT) (2018). A Study on the Architectural Structure Standard of Small Scale Hanok, Research Report (National Standard).
  8. Seo, N., Kang, S., Lee, Y., Jin, Z., Jeong, Y., and Jung, Y. (2019). "Variations of Building Methods and Costs of Modernized Hanok Test-bed Projects." Korean Journal of Construction Engineering and Management, KICEM, 20(3), pp. 86-96. https://doi.org/10.6106/KJCEM.2019.20.3.086
  9. Skitomore, R., and Ng, S. (2003). "Forecast Models for Actual Construction Time and Cost." Building and Environment, 38, pp. 1075-1083. https://doi.org/10.1016/S0360-1323(03)00067-2
  10. Yeom, D., Seo, H., Kim, Y., Cho, C., and Kim, Y. (2018). "Development of an Approximate Construction Duration Prediction Model During the Project Planning Phase for General Office Building." Journal of Civil Engineering and Management, 24(3), pp. 238-253. https://doi.org/10.3846/jcem.2018.1646