• Title/Summary/Keyword: Planning Stage

Search Result 1,489, Processing Time 0.035 seconds

A Study on The Household Investment Planning According to Family Life Cycle (가족생활주기에 따른 가계의 투자계획에 관한 연구)

  • 범수인
    • Journal of the Korean Home Economics Association
    • /
    • v.30 no.1
    • /
    • pp.199-217
    • /
    • 1992
  • The purpose of this study was to examine changes in the household investment planning according to the family life cycle, to improve the household investment planning process, and to develop research model. The results were as follows : Household investment planning varied with stages of the family life cycle because the stock of resources shifted and financial goals changed as the family life cycle stage changed. The main financial goals of family in each stage of the life cycle were the purchasing of house in the establishing stage, children's education and marriage in the extending stage, and the elderly's economic welfare in the diminishing stage. Also, in the Ⅰ & Ⅱ stage the most important investment goals were the purchasing of house, children's education in the Ⅲ stage, children's marriage in the Ⅳ stage, and the elderly's economic welfare in the Ⅴ stage. Therefore, the financial goals were recognized as the important goals underlain the investment-planning goals, and alternatives for the accomplishment of investment-planning goals were determined. The results of this study can contribute to establish the long-run investment planning process and improve the level of household's financial well-being.

  • PDF

A Study on the development quality control by application of QFD and Stage-gate in defense system (QFD 및 Stage-gate 모델을 활용한 국방분야 개발단계 품질관리 방안 연구)

  • Jang, Bong Ki
    • Journal of Korean Society for Quality Management
    • /
    • v.42 no.3
    • /
    • pp.279-290
    • /
    • 2014
  • Purpose: The purpose of this study is to propose adoption of QFD and Stage-gate in order to analyze the quality of korea defense system. Methods: Drawing change data of initial production phase in korea defense system were anlayzed and a practical method was proposed. Results: The results of this study are as follows; Off line Quality Control should be introduced in development phase. Specially, in case of defense system, the best method is QFD(Quality Function Deployment) and Stage-gate process. At first, QFD 1 step defines product planning from VOC(Voice Of Customer), QFD 2 step specifies part planning from product planning, QFD 3 step defines process planning from part planning, QFD 4 step defines production planning from previous process planning. Secondly, Stage-gate process is adopted. This study is proposed 5 stage-gate in case of korea defense development. Gate 1 is located after SFR(System Function Review), Gate 2 is located after PDR(Preliminary Design Review), Gate 3 is located after CDR(Critical Design Review), Gate 4 is located after TRR(Test Readiness Review) and Gate 5 is located before specification documentation submission. Conclusion: Off line QC(Quality Control) in development phase is necessary prior to on line QC(Quality Control) in p roduction phase. For the purpose of off line quality control, QFD(Quality Function Deployment) and Stage-gate process can be adopted.

Product elements for the safety assessment (안전성 평가를 위한 제품요소)

  • Park, Ji-Yong;Cho, Am
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2008.04a
    • /
    • pp.239-245
    • /
    • 2008
  • In this study has investigated and considered product planning methods at the existing product design process and being used the safety evaluation methods at the product planning stage, and has deduced the 16 safety evaluation elements to have to be considered for executing the safety evaluation at the product planning stage. When the safety evaluation is executed from the product planning stage, more safe products will be designed.

  • PDF

Planning Organizations and Planning Process of To(道) and Pu(府) Government Office Buildings under the Rule of Japanese Imperialism (일제강점기 도청사.부청사의 설계주체와 설계과정)

  • Kim, Myung-Sun
    • Korean Institute of Interior Design Journal
    • /
    • v.20 no.2
    • /
    • pp.102-109
    • /
    • 2011
  • Under the rule of Japanese Imperialism, there were two kinds of architectural government organizations inside the Chosun(朝鮮) Governor-General which designed To(道) and Pu(府) government office buildings; one was the organization inside the central government office and the other inside the local government offices(To and Pu). By the administrative approval procedure of the Chosun Governor-General, the local architectural organization planned site and floors of the building in the schematic design stage, and in the detail design stage not only the central but sometimes the local planned the building design. The design accomplished by the local in schematic stage was believed as a kind of guideline in detail design and the local organization was able to insist their own needs to the central and to change the central's planning. Even though the central had the authority of the design, the local took part in the planning of To and Pu government office buildings at least in the schematic design stage.

Dextrous Manipulation Planning of Soft-Fingered Hands (소프트핑거 로봇손의 물체 운용계획)

  • 정낙영;최동훈;서일홍
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.18 no.8
    • /
    • pp.2016-2025
    • /
    • 1994
  • A hierarchical planning strategy for dextrous manipulation of multifingered hands with soft finger contact model is proposed. Dextrous manipulation planning can be divided into a high-level stage which specifies the position/orientation trajectories of the fingertips on the object and a low-level stage which determines the contact forces and joint trajectories for the fingers. In the low-level stage, various nonlinear optimization problems are formulated according to the contact modes and integrated into a manipulation planning algorithm to find contact forces and joint velocities at each time step. Montana's contact equations are used for the high-level planning. Quasi-static simulation results are presented and illustrated by employing a three-fingered hand manipulating a sphere to demonstrate the validity of the proposed low-level planning strategy.

Integrated Process Planning and Scheduling for Machining Operation in Shipbuilding (선각 내업 가공작업의 공정계획과 일정계획의 통합화 방안 연구)

  • Cho, Kyu-Kab;Oh, Jung-Soo;Kim, Young-Goo
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.14 no.10
    • /
    • pp.75-84
    • /
    • 1997
  • This paper describes the development of an integrating method for process planning and scheduling activities for block assembly in shipbuilding. A block is composed of several steel plates and steel sections with the predetermined shapes according to the ship design. The parts which constitute the block are manufac- tured by cutting and/or bending operations, which are termed as machining operation in this paper. The machining operation is the first process for block assembly which influences the remaining block assembly processes. Thus process planning and scheduling for machining operation to manufacture parts for block are very important to meet the assembly schedule in the shipyard. An integrating method for process plan- ning and scheduling is developed by introducing the concept of distributed process planning and scheduling composed of initial planning, alternative planning and final planning stages. In initial planning stage, nesting parts information and machining emthods are generated for each steel plate. In alternative plan- ning stage, machine groups are selected and workcenter dispatching information is generated. In final planning stage, cutting sequences are determined. The integrated system is tested by case study. The result shows that the integrated system is more efficient than existing manual planning system.

  • PDF

Building Process of Domestic Residential Container Architecture and Suggestions for Vitalization (국내 거주용 컨테이너 건축물의 구축현황과 활성화 방안)

  • Gil, Bit-Na;Kim, Mi-Kyung
    • Korean Institute of Interior Design Journal
    • /
    • v.25 no.6
    • /
    • pp.79-88
    • /
    • 2016
  • The purpose of this study was to suggest ways to vitalize residential container architecture by identifying the building process of domestic residential container architecture and analyzing various problems appeared in the process and status of construction related to planning, design, and construction. Conclusion and suggestions of this study are as follows.; firstly, according to the current situation of domestic residential container architecture, the usage was planned mainly for accommodation. Secondly, For planning background of planning preparation stage, economic benefit for long-term residence individuality and diversity for long short term complex residence were the primary planning backgrounds. Thirdly, for floor planning of planning design stage, space planning for various purposes is necessary as creating inter-space, wide LDK space, and loft by using narrow and long container for the long-term residence. Lastly, For construction stage, ways to reduce personnel expenses are being required by reducing the term of works and simplifying the processing stage by running factory production and field construction in parallel. If reduction method of construction cost through energy saving and mass production system is considered in the future, it would be possible to expand the development to dormitory and community housing for university students who are pressured by housing cost.

A Study on the Process for Estimating the Construction Cost of an Apartment House in the Planning/Planning Stage (기획/계획단계에서 공동주택 건축공사비 산정을 위한 프로세스에 관한 고찰)

  • Jo, Seong-Min;Cho, Sung-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.228-229
    • /
    • 2021
  • Planning/planning stage Construction cost prediction is very important. In particular, flexible thinking is required to predict the construction cost by reflecting rapid market changes and current conditions. Therefore, in this study, we tried to consider the process for calculating the construction cost of an apartment house in a more accurate planning/planning stage. First, cases were collected based on the classification system by construction type. Second, the construction cost was predicted using the case-based reasoning technique. Third, the composition ratio by construction type of the most similar case was applied to the derived construction cost. Finally, the construction cost was predicted based on practical corrections reflecting the market and field conditions.

  • PDF

A Study on Analyzing the Factors Affecting Environmental Loads in the Planning Stage of Korean National Highway Projects

  • Park, Jin-Young;Park, June-Seok;Kim, Myeong-Jin;Kim, Sang-Ryong;Kim, Byung-Soo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.508-512
    • /
    • 2015
  • Carbon emission calculation guidelines provided by the Korean Ministry of Land, Infrastructure and Transportation (MOLIT) and existing environmental load assessment studies have suggested a method for estimating based on the volume determined after the design development. Therefore they are not being helpful in the decision making of the environmental economics of road facilities in the planning stage in which specific information on construction output volume is lacking. Based on literature analysis of existing studies and consultation from a group of construction environmental professionals, 12 types of property information considered to be related to environmental load were selected from an inventory of information that will be available in the road planning stage. In addition, multiple regression analysis was performed based on the environmental load computed through the life cycle assessment (LCA) of 40 national highway project cases of Korea to deduce five impact factors of environmental load in the road facilities planning stage.

  • PDF

Actual Condition and Vitalization Plan of Rural Village Festival (농촌 마을축제 실태 및 활성화 방안)

  • Yun, Sang-Hun;Lee, Han-Sung
    • Journal of Korean Society of Rural Planning
    • /
    • v.20 no.3
    • /
    • pp.1-9
    • /
    • 2014
  • This study is to find out vitalization plan of rural village festival through field survey and in-depth interview. Festival vitalization plans were suggested for each of four steps. The results are as follows: (1) preparing stage : disambiguation of supporting festival, adjustment of selecting times & improvement of selecting index in supporting festival, support of planning & managing ability, and systematization of festival consulting team. (2) planning stage : supporting differentiated festival program development, and public relations of rural village festival. (3) operating stage : flexible utilization of supporting budget and systematization of festival supporters operation. (4) ending stage : holding a workshop to share successful festival cases.