DOI QR코드

DOI QR Code

Development of Construction Manager's Competency Evaluation Index Using Sports Analysis Techniques - Focused on Notational Analysis -

스포츠 분석 기법을 활용한 건설관리자 역량 평가지표 개발 - 부호화 분석을 중심으로 -

  • Lee, Jinsol (Department of Architecture and Architectural Engineering, Seoul National University) ;
  • Park, Moonseo (Department of Architecture and Architectural Engineering, Seoul National University) ;
  • Lee, Hyeon-soo (Department of Architecture and Architectural Engineering, Seoul National University) ;
  • Cho, Jongwoo (Department of Architecture and Architectural Engineering, Seoul National University) ;
  • Yoon, Inseok (Department of Architecture and Architectural Engineering, Seoul National University)
  • Received : 2018.12.18
  • Accepted : 2019.02.28
  • Published : 2019.07.31

Abstract

To drive construction project successful, a construction manager with good competency is needed. In order to select appropriate construction manager, there should be a standard and a method for appropriately evaluating the competency of construction manager. There have been many researches on the competency of construction managers, but there are two points to be supplemented. One is that construction manager's competency measurement was not concrete and objective, and the other is that construction project performance directly reflects individual manager's performance. The purpose of this study is to derive a construction manager competency evaluation index by using the Notational Analysis technique that is used when deriving an indicator that measures the athlete's competency in sports. This analysis was drawn with Delphi method. Finally, the 'measurable behaviors'were derived that can evaluate the competency of construction managers. Through this, it is possible to express each manager's expertise, leadership, and personal characteristics in numerical expression. This will help decision makers when selecting construction managers. It is anticipated that decision makers will be able to make the decision to select the necessary construction managers easier because it can evaluate the construction managers through a scientific approach based on the record by supplementing the existing method which only relied on intuition.

프로젝트 성공을 위해서는 좋은 역량을 지닌 건설관리자가 필요하다. 특히 건설 프로젝트를 기반으로 이윤창출을 하는 건설사나 CM사 입장에서는 건설관리자인 현장소장이나 CMr를 신중하게 선정해야할 필요성이 있다. 선정하기 위해서는 건설 현장 관리 역력을 진단하는 적절하게 평가하기 위한 기준과 방법이 있어야 한다. 선행 연구에서는 건설관리자의 역량에 관한 많은 연구가 있었으나 두 가지 측면에서 보완해야할 점이 있다. 하나는 측정이 가능하지 않다는 점, 다른 하나는 프로젝트 성과를 직접 개인의 성과를 반영한다는 점이다. 본 연구는 스포츠에서 선수의 역량을 측정하는 지표를 도출 했을 때 사용하는 부호화 분석 기법으로 건설관리자 역량 평가 지표를 도출한다. 부호화 분석 기법은 델파이 방법으로 2차까지 진행하였다. 도출된 '측정 가능한 행동'들로 건설관리자의 역량을 측정할 수 있는 기반을 마련하였다. 이를 통해 각 관리자의 전문성, 리더십, 개인특성 역량을 수치화된 표현으로 나타낼 수 있다. 이는 향후 의사 결정자가 건설관리자를 선정 시 뒷받침 될 수 있는 정보를 제공하고자 한다. 직관에만 의존하였던 기존 방식을 보완하여 기록에 의한 근거로 과학적인 접근방법을 통해 건설관리자를 평가할 수 있으므로 의사결정자들이 필요한 건설관리자를 선정하기 위한 결정을 수월하게 할 수 있도록 도움을 줄 것으로 기대된다.

Keywords

GGRHC4_2019_v20n4_34_f0001.png 이미지

Fig. 1. Flow chart of research

GGRHC4_2019_v20n4_34_f0002.png 이미지

Fig. 2. Four main note elements in notational analysis

Table 1. Classification of sports data (Cho, 2018)

GGRHC4_2019_v20n4_34_t0001.png 이미지

Table 2. Competency model of construction manager

GGRHC4_2019_v20n4_34_t0002.png 이미지

Table 3. Structured competencies

GGRHC4_2019_v20n4_34_t0003.png 이미지

Table 4. Composition of expert panel

GGRHC4_2019_v20n4_34_t0004.png 이미지

Table 5. Competency structure based on behavior after Delphi 1st

GGRHC4_2019_v20n4_34_t0005.png 이미지

Table 6. Verb words in guidelines for construction supervisors and construction supervisors (MOLIT)

GGRHC4_2019_v20n4_34_t0006.png 이미지

Table 7. Technical knowledge and skill competency evaluation index

GGRHC4_2019_v20n4_34_t0007.png 이미지

Table 8. Leadership competency evaluation index

GGRHC4_2019_v20n4_34_t0008.png 이미지

Table 9. Personal trait competency evaluation index

GGRHC4_2019_v20n4_34_t0009.png 이미지

References

  1. Abdel-Razek, R.H. (1997). "How construction managers would like their performance to be evaluated."Journal of Construction Engineering and Management, 123(3), pp. 208-213. https://doi.org/10.1061/(ASCE)0733-9364(1997)123:3(208)
  2. Afshari, A.R. (2017). "Methods for Selection of Construction Project Manager: Case Study." Journal of Construction Engineering and Management , 143(12), 06017003. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001400
  3. Athey, T.R., and Orth, M.S. (1999). "Emerging competency methods for the future." Human Resource Management: Published in Cooperation with the School of Business Administration, The University of Michigan and in alliance with the Society of Human Resources Management, 38(3), pp. 215-225. https://doi.org/10.1002/(SICI)1099-050X(199923)38:3<215::AID-HRM4>3.0.CO;2-W
  4. CSU (California State University) Fresno. (2012). "Sports marketing option." http://www.craig.csufresno.edu/departments/mrkt/Sports-mktg-snapshot.asp. (Jul. 11, 2012).
  5. Cho. E.H. (2018). "Science of Record and Measurement of Sports Fields: Utilization and Prospect of Sports and Big Data." Sports Science, 142, pp. 20-29.
  6. Dainty, A.R., Cheng, M.I., and Moore, D.R. (2005). "Competency-based model for predicting construction project managers' performance." Journal of Management in Engineering, 21(1), pp. 2-9. https://doi.org/10.1061/(ASCE)0742-597X(2005)21:1(2)
  7. El-Sabaa, S. (2001). "The skills and career path of an effective project manager." International journal of project management, 19(1), pp. 1-7. https://doi.org/10.1016/S0263-7863(99)00034-4
  8. Evangelista, L. (2009). "Competence, Competencies and Career Guidance." In IAEVG International Conference 2019 .
  9. Frank, T. (2002). "The superior project manager." Marcel Dekker, New York.
  10. Gang, J.S., and Kim, H.S. (2010). "Evaluation of Project Managers Leadership in Construction Projects." Korean Journal of Construction Engineering and Management , KICEM, 11(1), pp. 151-159. https://doi.org/10.6106/KJCEM.2010.11.1.151
  11. Hadad, Y., Keren, B., and Laslo, Z. (2013). "A decision-making support system module for project manager selection according to past performance." International Journal of Project Management , 31(4), pp. 532-541. https://doi.org/10.1016/j.ijproman.2012.10.004
  12. Hallowell, M.R., and Gambatese, J.A. (2009). "Qualitative research: Application of the Delphi method to CEM research." Journal of construction engineering and management , 136(1), pp. 99-107. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000137
  13. Han, P., Baek, E., and Jang, S. (2010). "The developmen t of appraisal items for measuring the playing ability of soccer player." Korean Journal of Sports Science, 19(2), pp. 1397-1412.
  14. Hong, S. (2010). "Development of Determinants of Competitive Power for Evaluating Position of Soccer Players." Korean Journal of Sport Science, 21 (2), pp. 1172-1182. https://doi.org/10.24985/kjss.2010.21.2.1172
  15. Hong, S., Kim, J., and Choi, H. (2009). "Understanding Context Factors for Evaluation of Soccer Player Performance." Korean Journal of Sport Science , 20(3), pp. 612-620. https://doi.org/10.24985/kjss.2009.20.3.612
  16. Hu, Y. (2017). "Lotte World Tower, a Great Landmark of Seoul." Korean Society of Civil Engineers, pp. 98-99.
  17. Hughes, M.D., and Bartlett, R.M. (2002). "The use of performance indicators in performance analysis." Journal of sports sciences, 20(10), pp. 739-754. https://doi.org/10.1080/026404102320675602
  18. Hughes, M., and Franks, I.M. (Eds.). (2004). "Notational analysis of sport: Systems for better coaching and performance in sport." Psychology Press.
  19. Hwang, B.G., and Ng, W.J. (2013). "Project management knowledge and skills for green construction: Overcoming challenges." International Journal of Project Management, 31(2), pp. 272-284. https://doi.org/10.1016/j.ijproman.2012.05.004
  20. Jaselskis, E.J., and Ashley, D.B. (1991). "Optimal allocation of project management resources for achieving success." Journal of Construction Engineering and Management, 117(2), pp. 321-340. https://doi.org/10.1061/(ASCE)0733-9364(1991)117:2(321)
  21. Jeong, J., and Jun, O.J. (2012). "The Development of Evaluation Criteria for the Meister High Schools Based on CIPP Evaluation Model." The Journal of Vocational Education Research, 31(4), pp. 91-110.
  22. Jung, S., and Yu, J. (2017). "Analysis of Factors Affecting Job Competency of Quality Management for a Construction Manager." Korean Journal of Construction Engineering and Management, KICEM, 18(1), pp. 65-73. https://doi.org/10.6106/KJCEM.2017.18.1.065
  23. Keren, B., Hadad, Y., and Laslo, Z. (2014). "Combining AHP and DEA methods for selecting a project manager." Management: Journal of Sustainable Business and Management Solutions in Emerging Economies, 19(71), pp. 17-28. https://doi.org/10.7595/management.fon.2014.0016
  24. Kim, D., Kim, H., and Jang, H. (2018). "An Analysis of the Casual Relations on Construction Project Manager's level Competency." Journal of The Architectural Institute of Korea Structure and Construction. 34(3), pp. 77-86. https://doi.org/10.5659/JAIK_SC.2018.34.3.77
  25. Kim, D.Y. (2014). "Developing Competency Model and Analyzing Competency Needs for Construction Manager in D Co., Ltd." The Journal of Vocational Education Research, KRIVET 33(3), pp. 37-56.
  26. Kim, G.R. (2010). "An Investigation on Performance Indicators to Evaluate the Individual Performances Within Tactical Conditions in Football." Unpublished Doctoral Thesis, Myongji University Graduate School.
  27. Kim, H., and Kwon, D. (2003). "Project Managers'Core Skills in Construction Projects." Journal of The Architectural Institute of Korea Structure and Construction, 19(8), pp. 163-170.
  28. Klemp Jr, G.O. (1980). "The Assessment of Occupational Competence." Final Report: I. Introduction and Overview.
  29. Lawshe, C.H. (1975). "A quantitative approach to content validity 1." Personnel psychology, 28(4), pp. 563-575. https://doi.org/10.1111/j.1744-6570.1975.tb01393.x
  30. Lee, H., Yu, J., and Lee, S. (2011). "Personal Competency Model of Construction Project Managers for Project Success." Journal of the Architectural Institute of Korea Structure and Construction 27(8), 2011.8, pp. 139-146.
  31. Lee, J. (2001). "Delphi Method." Kyoyookbook, 7.
  32. McClelland, D.C. (1973). "Testing for competence rather than for intelligence." American psychologist, 28(1), p. 1. https://doi.org/10.1037/h0034092
  33. Ministry of Land, Infrastructure and Transport Degree (2013). "Guidelines for construction supervisors and construction supervisors." 8.
  34. Mirabile, R.J. (1997). "Everything you wanted to know about competency modeling." Training and Development, 51(8), pp. 73-78.
  35. Park, M., Jang, Y., Lee, H., and Yoon, Y. (2010). "Integrated Knowledge Management System based on Construction Portal." Korean Journal of Construction Engineering and Management, KICEM, 11(4).
  36. Parry, S.B. (1996). "The quest for competencies." Training, 33(7), p. 48.
  37. Rashidi, A., Jazebi, F., and Brilakis, I. (2010). "Neurofuzzy genetic system for selection of construction project managers." Journal of Construction Engineering and Management, 137(1), pp. 17-29. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000200
  38. Shin, M.S. (2009). "Comparisons of team performance analysis between EURO 2008 semi-finalists and South Korean teams in soccer." The Korean Journal of Physical Education, 48(2), pp. 475-482.
  39. Silva, R.M. (2016). Sports analytics (Doctoral dissertation, Science: Statistics and Actuarial Science).
  40. Spencer, L. and Spencer, S. (1993). "Competence at work: Models for superior performance." United States: John Wiley and Sons.