Fig. 1. Project Main Management Area
Fig. 2. Prototype flow chart
Fig. 3. WBS example
Fig. 4. Development WBS example
Fig. 5. Requirements Tracking Matrix
Fig. 6. Requirements management using Redmine
Table 1. Scope Management ITO
Table 2. Type of prototype application
Table 3. Requirements Development
Table 4. Requirements Management
Table 5. Before and after application of required engineering
Table 6. Productivity before and after introduction of Redmimn
References
- C. H. Lee. (2013). A Study on the Influence of Scope Management Activities on the Project Performance from the Client's Perspective. Master dissertation. Hanyang University, Seoul.
- I. S. Kim. (2012). The impact of project management maturity on scope, schedule, and cost in software projects. Master dissertation. Korea University, Seoul.
- M. J. Shim. (2013). A study on scope descriptors and success indicators of WBS related projects in small SW projects. Master dissertation. Korea University, Seoul.
- D. I. Kwak. (2013). Scrum-based Software Development Project Scope Verification and Control Methodology. Master dissertation. Hanyang University, Seoul.
- B. G. Park. (2007). A Study on the Effect of Scope Management Activity on Project Performance in Information System Development Project. Hanyang University, Seoul.
- Project Management Institute. (2017). PMBOK 6th GUIDE. USA : Project Management Institute.
- C. H. Lee, G. G. Lim & J. S. Kim. (2010). A Study on The Effect of the Scope Management on the Information System Development Project. Korea Society of IT Services, 9, 475-479.
- B. Y. Lee & S. G Yi. (2015). A Study on the Importance of the Impact Factors on the Performance of IT Project. Korean Institute of Information Technology, 13(1), 127-138. DOI : 10.14801/jkiit.2015.13.1.127
- H. K. Jeon, K. R. Park & J. Y. Jung. (2015). A Study on Software Dev. Project Management System Acquisition and Implementing on project site. Journal of the Korea Society of Computer and Information, 20(5), 91-95. DOI : 10.9708/jksci.2015.20.5.091
- B. R. Lee. (2013). A Study on the Importance of the Impact Factors on the Performance of Informatization Project. Doctoral dissertation, Seoul Venture University, Seoul.
- B. S. Seo & K. S. Han. (2012). A Study on PMO Function and Operation Form for Improvement of Public Sector Information System Project Performance. The Society of Digital Copyright, 13(1), 4-20.
- S. H. Ji, K. I. Son & S. C. Kim. (2012). Analyzing the Impacts of Project Management Knowledge on the Project Performance: Cases of System Integration Project. Korea Society of Project Management, 2(2), 17-25.
- K. I. Shin & S. C. Kim. (2016). A Study on the Impact of Project Management Methodology Adoption on Organizational Innovation and Performance camera. Korean Production and Operations Management Society, 27(3), 327-328.
- B. S. Kim, H. S. Lee & D. B. Lee. (2014). Managing assignments using communication and open source tools. Information & Communications Magazine, 31(3), 71-74.
- H. S. Han & S. W. Oh. (2018). A Defect Management Process based on Open Source Software for Small Organizations. The Korean Institute of Information Scientists and Engineers, 45(3), 242-250.