Browse > Article
http://dx.doi.org/10.15207/JKCS.2019.10.6.001

An Empirical Study for Enhancing Scope Management Capability of SW Informatization Project  

Kim, Seok-Kwan (Department of Computer Science, Dongshin University)
Ryu, Gab-Sang (Department of Computer Science, Dongshin University)
Publication Information
Journal of the Korea Convergence Society / v.10, no.6, 2019 , pp. 1-6 More about this Journal
Abstract
This paper examines the complexity of recent SW development such as the 4th industry to apply the requirement engineering and redimimn application to the project to solve the difficulty of scope management during project management of medium and small businesses. These engineering techniques were applied to mid-sized and small-sized SW development projects. It was verified through supervision of 15 SW development projects. As a result, we observed about 30% reduction in related issues. In addition, Redmimn was introduced to SW development projects involving medium and small sized companies, and it proved that it has the effect of shortening delivery time through requirement management and tracking management. In order to secure the safety of the SW system development project, it is necessary to apply the required engineering techniques and tools, and it is necessary to continuously cultivate professional manpower to carry out this.
Keywords
Quality Management; Scope management; PMBOK; Redmimn; Visualization;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 H. S. Han & S. W. Oh. (2018). A Defect Management Process based on Open Source Software for Small Organizations. The Korean Institute of Information Scientists and Engineers, 45(3), 242-250.
2 C. H. Lee. (2013). A Study on the Influence of Scope Management Activities on the Project Performance from the Client's Perspective. Master dissertation. Hanyang University, Seoul.
3 I. S. Kim. (2012). The impact of project management maturity on scope, schedule, and cost in software projects. Master dissertation. Korea University, Seoul.
4 M. J. Shim. (2013). A study on scope descriptors and success indicators of WBS related projects in small SW projects. Master dissertation. Korea University, Seoul.
5 D. I. Kwak. (2013). Scrum-based Software Development Project Scope Verification and Control Methodology. Master dissertation. Hanyang University, Seoul.
6 B. G. Park. (2007). A Study on the Effect of Scope Management Activity on Project Performance in Information System Development Project. Hanyang University, Seoul.
7 H. K. Jeon, K. R. Park & J. Y. Jung. (2015). A Study on Software Dev. Project Management System Acquisition and Implementing on project site. Journal of the Korea Society of Computer and Information, 20(5), 91-95. DOI : 10.9708/jksci.2015.20.5.091   DOI
8 Project Management Institute. (2017). PMBOK 6th GUIDE. USA : Project Management Institute.
9 C. H. Lee, G. G. Lim & J. S. Kim. (2010). A Study on The Effect of the Scope Management on the Information System Development Project. Korea Society of IT Services, 9, 475-479.
10 B. Y. Lee & S. G Yi. (2015). A Study on the Importance of the Impact Factors on the Performance of IT Project. Korean Institute of Information Technology, 13(1), 127-138. DOI : 10.14801/jkiit.2015.13.1.127
11 B. R. Lee. (2013). A Study on the Importance of the Impact Factors on the Performance of Informatization Project. Doctoral dissertation, Seoul Venture University, Seoul.
12 B. S. Seo & K. S. Han. (2012). A Study on PMO Function and Operation Form for Improvement of Public Sector Information System Project Performance. The Society of Digital Copyright, 13(1), 4-20.
13 S. H. Ji, K. I. Son & S. C. Kim. (2012). Analyzing the Impacts of Project Management Knowledge on the Project Performance: Cases of System Integration Project. Korea Society of Project Management, 2(2), 17-25.
14 K. I. Shin & S. C. Kim. (2016). A Study on the Impact of Project Management Methodology Adoption on Organizational Innovation and Performance camera. Korean Production and Operations Management Society, 27(3), 327-328.
15 B. S. Kim, H. S. Lee & D. B. Lee. (2014). Managing assignments using communication and open source tools. Information & Communications Magazine, 31(3), 71-74.