• Title/Summary/Keyword: PMBOK

Search Result 35, Processing Time 0.04 seconds

Quantitative Project Management Using Comparison of CMMI and PMBOK (CMMI와 PMBOK의 비교 분석을 통한 정량적 프로젝트 관리)

  • Kim Kyong H.;Kim Heung J.;Park Young B.
    • The KIPS Transactions:PartD
    • /
    • v.12D no.4 s.100
    • /
    • pp.601-608
    • /
    • 2005
  • It is very important to improve qualify, cost and the necessary period for production in software development project. In order to improve software quality, cost and period, final product as well as a project planning and process itself are concerned. In CMMI of SEI and ISO/IEC 15504 (SPICE), the process for the project management is specified. Recently, as a method of total management - including man power, budget, and schedule - PMBOK is introduced. The detailed and specific management method in PMBOK results in multiple experiments that apply PMBOK to enterprise environment. In this paper, hybrid method of CMMI and PMBOK is proposed to obey CMMI, at the same time, to apply the detailed and specific management method in PMBOK and develop metrics for the method.

The comparison about PMBOK process correlation and network topology characteristics (PMBOK 프로세스 연관도와 네트워크 토폴로지 특징에 관한 비교)

  • Sohn, Ju-Hang;Kim, Min-Taig;Jung, Dong-Soo;Han, Jung-Ahn
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2012.06b
    • /
    • pp.217-219
    • /
    • 2012
  • 효율적으로 일하는 방법을 제시하는 프로젝트 관리 프레임 중의 하나인 PMBOK는 9가지 프로젝트 관리 영역의 필요성을 제시하고 있다. PMBOK 프로세스 연관도를 살펴보면, 네트워크 토폴로지의 특징인 노드, 링크, 순위, 빈도수와 관련된 유사한 면이 있는 것을 발견할 수 있다. PMBOK의 표준 프로세스 연관도에 따라 연결되는 링크를 순차적으로 그린다고 가정했을 때, 실제 업무의 프로세스 링크는 네트워크이론의 Power-law를 따를 것이라고 예상되었다. 이러한 현상을 증명하기 위해 PMBOK 표준 프로세스 연관도를 모델로 하여, 인터넷 위상의 특징을 결정하는 속성 중 Power-law1, 2의 관련성을 분석하였다.

A Case on Application of the PMBOK(Project Management Body of Knowledge) Guide in Nuclear Power Plant Architect Engineering (PMBOK Guide 지식영역 적용 사례 -원전종합설계를 중심으로-)

  • Im, Jae-Min;Kim, Seong-Su
    • Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.41-45
    • /
    • 2012
  • Nowadays the Project Management is increasingly adapted into almost all the fields in business management processes among leading companies both in Korea and overseas. However its actual practices are rare to be found. Among the Project Life Cycle, this report covers the real cases of the PMBOK knowledge areas in NPP Architect Engineering. The areas of the Construction, Start-up and Operation will be exception of the cases. By way of analyzing the KEPCO ENC's Processes/Procedures/Systems and the ones in PMBOK Guide, this report will show the contents in the PMBOK Guide is rather practical than theoretical. Meanwhile, implications whether the conclusions of this report might be applied to other industries such as general construction, non-nuclear plants, etc. should be left behind to follow-up studies.

SEARCHING FOR KNOWLEDGE IN THE CONSTRUCTION EXTENSION TO THE PMBOK GUIDE (THIRD EDITION)

  • F. Zhang;J. Zuo;S. Pullen;George Zillante
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.93-98
    • /
    • 2011
  • The application of knowledge management concepts as a way to improve project success is an emerging topic for project management researches around the world. The Construction Extension to the PMBOK® Guide Third Edition documents the knowledge and practices that are generally recognized as good practices for managing engineering and construction projects. However, it is not unusual to see that engineering and construction projects suffer from poor performance. Based on a critical literature review, a theoretical framework is developed for the application of knowledge management in engineering and construction projects. This framework is subsequently applied as a lens to examine the construction extension to the PMBOK® Guide, aiming to identify the key characteristics of knowledge management in this standard. This research also aims to highlight those aspects of the construction extension to the PMBOK® Guide that can be improved from the knowledge management perspective. Recommendations are made to improve this standard by means of applying knowledge management concept so that better project outcomes can be achieved.

  • PDF

The Study on Project Management Methodology for Productivity Improvement of SI project - focus on CMMi and PMBOK - (SI 개발 프로젝트 생산성 향상을 위한 프로젝트 관리 방법론 구축에 관한 연구)

  • Lee, Don-Hee;Kim, Jong-Eun
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2009.05a
    • /
    • pp.453-458
    • /
    • 2009
  • 정보화가 기업 경쟁력의 핵심 요소로 부각되고 있으며 기업 및 정부기관은 앞 다투어 정보화에 투자하고 있는 상황이다. 정보시스템 개발 프로젝트도 이제는 대형 프로젝트 수가 급증하고 있다. 최근 소프트웨어 CMMi 수준에 관한 인증 여부는 기업 경쟁력의 핵심적인 요인으로 그 중요성이 날로 강조되고 있다. 또한 PMI의 PMBOK는 프로젝트 관리의 바이블 격으로 업종 업태를 불문하고 광범위하게 적용되고 있는 상황이다. 프로젝트 관리자의 관점에서 볼 경우 CMMi 모델과 PMBOK 모델간의 중첩되는 부분, CMMi 프로세스를 실적용 시 관리영역에 대한 혼선 부분, 또한 PMBOK 상위지침의 구체성 미흡 부분에 대한 통합 및 조정이 필요하게 되었다. 현재 상용되는 개발방법론에는 관리적인 요소가 매우 미약하고, 국내에 아직까지 체계적으로 정립된 관리방법론이 없는 상황이다. 따라서, 본 논문에서는 프로젝트 관리자가 숙지해야 하는 프로젝트 관리영역, 프로젝트 관리단계, 제반 절차, 유관 정보시스템과의 연동(Interface) 등을 정보화 개발 프로젝트 생명주기(Life Cycle)에 맞춰 재구성 및 통합하여 프로젝트 관리자(Project Manager)에게 일관된 관점(Single Point of View)을 제시하여 프로젝트 생산성을 제고 하고자 한다.

  • PDF

CM/PMBOK

  • 김경주
    • Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.9-13
    • /
    • 2001
  • PDF

Application of Project Management on Pyro Project (파이로 프로젝트에 프로젝트 관리 적용 방안)

  • Kim, Jeong-Guk;Kim, Hyuck-Jong;Ko, Won-Il;Ku, Jeong-Hoe;Nam, Hyo-On
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.2
    • /
    • pp.26-33
    • /
    • 2017
  • Pyro project, one of complex project, is now under research and development. To manage this kind project successfully, it is essential to apply the processes of technical management (TM) based on systems engineering (SE) and project management (PM). In this paper, the project management processes from ISO-21500 standard, PMBOK guide, and PRINCE2 guide were reviewed, and then some common PM for the large national R&D project were selected. An integrated technical management and project management frame work was finally established and suggested for Pyro project.

Enhanced Earned Value management Model for Estimating the Project Ending time. (프로젝트 종료시점 예측을 위한 기성고 분석 방법 보완 모델)

  • Lee, Joo-Yeon;Cho, Eun-Ae
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2007.05a
    • /
    • pp.155-159
    • /
    • 2007
  • S/W 개발 프로젝트의 품질, 비용, 개발 기간을 잘 관리하여 프로젝트를 성공시키기 위해 PM 은 프로젝트의 종료시점과 예산의 초과를 예측할 수 있어야 한다. PMBOK 의 비용관리의 Earned Value Method 는 프로젝트의 진행에 따른 생산성의 변화와 그에 따른 비용과 일정의 증가 추정에 대한 규칙을 제시한다. 그러나 EVM 은 제조공정에서는 그 효과를 증명하였지만, S/W 프로젝트에서는 적용이 힘들어 잘 활용되고 있지 않다. 이는 사람이 주요 자원인 S/W 프로젝트에서는 Actual Cost 의 측정이 쉽지 않기 때문이다. 따라서 본 논문에서는 S/W 프로젝트 관리에서 Earned Value 의 측정이 쉽지 않아 추정되기 힘든 지연된 종료 시점에 대한 예측을 PMBOK 과 CMMI 에서 제시하는 관리 영역과의 연관성을 활용하고, EVM 을 보완하여 지연에 대한 예측모델을 만들어보고자 한다.

  • PDF