참고문헌
- An, Y. H., Kim, Y. A. and Kim, Y. S. (2009). "An Analysis on the Propriety of Labor Input at Design Stage in Construction Management." Korean Journal of Construction Engineering and Management, KICEM, 10(3), pp. 32-41.
- Barrie and Paulson. (2000). Professional construction management. Translated Version by KICEM, McGraw-Hill Korea, Seoul, Korea.
- Byun, I. W. and Kim, Y. S. (2012). "An Analysis of Core Competence of Pre-construction Service of the Making Inroads into Oversea Construction Market (for the Entry in the International Construction Business)." Korean Journal of Construction Engineering and Management, KICEM, 13(2), pp. 80-90. https://doi.org/10.6106/KJCEM.2012.13.2.080
- Cho, H. H. and Kang, K. I. (2001). "Analysis on Architect's CM Capability for Development of Expended Service CM. - Focused on Design Expended CM Model in Private Sector -" Journal of the Architectural Institute of Korea, 17(10), pp. 153-160.
- Cho, H. K. and Kim, H. S. (2011). "A Comparative Study on the Usage Level of Construction Management Services during Pre-Construction Stages - Focused on Public and Private Building Projects -." Korean Journal of Construction Engineering and Management, KICEM, 12(3), pp. 112-120. https://doi.org/10.6106/KJCEM.2011.12.3.112
- Jang, H. S., Lee, B. N., Choi, S. I. and Koo, B. S. (2008). "Competency Assessment of Korean Construction Firms on International Plant Projects." Korean Journal of Construction Engineering and Management, KICEM, 9(4), pp. 173-181.
- Jang, W. S., Lee, S. U. and Lee, D. E. (2013). "Identifying the perception on the introducing of Construction Management(CM) in the civil infrastructure project delivery system." Korean Journal of Construction Engineering and Management, KICEM, 14(1), pp. 91-100. https://doi.org/10.6106/KJCEM.2013.14.1.091
- Jeong, M. and Lee, G. (2011). "A Study on the Relationship between CM Selection Factors and Characteristics of Clients." Journal of the Architectural Institute of Korea, 27(2), pp. 125-132.
- Jo, Y. G. and Kim, H. S. (2014). "Perception and Evaluation of Construction Management Firms toward Government Policies for Construction Management." Korean Journal of Construction Engineering and Management, KICEM, 15(1), pp. 62-69. https://doi.org/10.6106/KJCEM.2014.15.1.062
- Jung, Y. (2013). "Structured and Scenario-Based Pre- Project Planning for International Construction Projects." Review of Architecture and Building Science, AIK, 57(1), pp. 68-75.
- Jung, Y. and Gibson, G. E. (1999). "Planning for Computer Integrated Construction." Journal of Computing in Civil Engineering, ASCE, 13(4), pp. 217-225. https://doi.org/10.1061/(ASCE)0887-3801(1999)13:4(217)
- Jung, Y., Joo, M. and Kim, H. (2011). "Project Management Information Systems for Construction Managers: Current constituents and future extensions", Proceedings of the 28th International Symposium on Automation and Robotics in Construction (ISARC 2011), Seoul, Korea, 597-602.
- Jung, Y., Woo, S., Kang, S. H. and Lee, B. N. (2002). "Effects of CM Contracts on the Management Technology in the Korean Construction Industry." Journal of The Korean Society of Civil Engineers, 22(3), pp. 483-495.
- Jung, Y., Woo, S., Park, J., Kang, S. H., Lee, Y. and Lee, B. N. (2004). "Evaluation of the Owners' CM Functions." Korean Journal of Construction Engineering and Management, KICEM, 5(3), pp. 128-136.
- Kang, S., Jung, Y., Kim, N. and Shin, D. (2014). "Policies and Tasks for Improving Korean CM Industry", Korean Journal of Construction Engineering and Management, KICEM, 15(5), pp. 71-81. https://doi.org/10.6106/KJCEM.2014.15.5.071
- Kee, J. H., Kim, C. D. and Kim, Y. S. (2000). "Development Of a Project Sensitive Matric Model For CM Fee Calculation." Korean Journal of Construction Engineering and Management, KICEM, 1(4), pp. 91-97.
- Kim, H. D. (2013). "Cooperation System Between Construction and Engineering Company in Overseas Business Promotion." Construction Engineering and Management, KICEM, 14(2), pp. 11-13.
- Kim, H. J. (2000). "Construction Management for Incheon International Airport Construction Project." Construction Engineering and Management, KICEM, 1(2), pp. 31-37.
- Kim, H. R., Lee, H. S. and Park, M. S. (2012). "Oversea s Expansion Strategy of Korean CM Firms-Focusing on Chinese Market." Proceedings of AIK Conference, 32(2), pp. 617-618.
- Kim, H. S. (2001). "Characteristics and Implications of Contractual Liabilities in CM for Fee and CM at Risk." Journal of the Architectural Institute of Korea, 17(7), pp. 77-84.
- Kim, J. H. and Kim, H. S. (2013). "A Study on the Investigation into Obstacles in Overseas CM Projects." Korean Journal of Construction Engineering and Management, KICEM, 14(5), pp. 113-21. https://doi.org/10.6106/KJCEM.2013.14.5.113
- Kim, K. I., Seo, Y. C. and Hyun, C. T. (2001). "The Delivery System Selection Procedure in the Large Public Construction Projects." Journal of the Architectural Institute of Korea, 17(3), pp. 51-58.
- Kim, K. R (1999). "Construction Management Model for Public Projects in Korea. " CERIK Research Report, 99-106.
- Kim, K. S., Park, H. K. and Son, B. S. (2013). "A Study on the Selection Method of Construction Management based on Public Construction Projects." Korean Journal of Construction Engineering and Management, KICEM, 14(5), pp. 65-73. https://doi.org/10.6106/KJCEM.2013.14.5.065
- Kim, S. B., Lee, J. D. and Kim, J. W. (2008). "A Benchmarking Study on CM Fee Estimation." Korean Journal of Construction Engineering and Management, KICEM, 9(1), pp. 96-106.
- Kim, S. C. and Yoon, J. S. (2010). "Analyzing Korean Construction Management Market and Perception." Journal of the Architectural Institute of Korea, 26(3), pp. 85-92.
- Kim, S. G., Yang, Y. C. and Kim, J. J. (1998). "A Case Analysis on the Acquisition Process of Construction Management in Korea." Journal of the Architectural Institute of Korea, 14(8), pp. 93-102.
- Kim, S. S., Kim, J. H., Lee, Y. S. and Kim, J. J. (2007 ). "A Study on Method Activation of Construction Management through Investigation of Public Owners' Capability level." Proceedings of KICEM Annual Conference, KICEM, pp. 289-294.
- Kim, S. S., Park, J. L., Kim, J. H. and Kim, J. J. (2012 ). "Corresponding Plan of Construction Management Enterprise for the Introduce of Construction and Technology Promotion Law with Delphi Method." Proceedings of KIC Conference, 12(1), pp. 121-122.
- Kim, W. T. and Chang, C. K. (2013). "Satisfaction Level and Performance Evaluation for CM Service in Korea." Korean Journal of Construction Engineering and Management, KICEM, 14(4), pp. 108-117. https://doi.org/10.6106/KJCEM.2013.14.4.108
- Kim, Y. S. (1996a). "A Comparative Study on the Construction Management Systems and the Role of Construction Manager through the Analysis of the Standard From of Contract." Journal of the Architectural Institute of Korea, 12(11), pp. 243-252.
- Kim, Y. S. (1996b). "A Study on Establishment of Construction Management Contract System in the Korean Construction Industry." Journal of the Architectural Institute of Korea, 12(12), pp. 277-285.
- Kim, Y. S. (1998). "An Analysis on the Construction Management Business Plans and Activities of the Large Construction Companies in Korea." Journal of the Architectural Institute of Korea, 14(4), pp. 379-388.
- Kwon, H. J. (2011). "Strategies for Training International Construction Human Resources by Government." Construction Engineering and Management, KICEM, 12(3), pp. 6-9.
- Lee, B. N. and Jung, Y. (1999). "International Engineering Market: Trends & Implications. Construction Trends." CERIK Research Report, 99-05.
- Lee, B. N., Choi, S. I. and Jang, H. S. (2005). " Suggestions for the Domestic CM/PM Revitalization." CERIK Research Report, 2005-08.
- Lee, B. N., Kim, D. H., Woo, S. and Jung, Y. (2001). "Determination of CM Cost in Korean Domestic Public Construction Project." Journal of The Korean Society of Civil Engineers, 21(5), pp. 725-735.
- Lee, C. S. and Jin, Y. S. (1996). "Developing for the Scope of the Construction Supervision Activities in Korea." Journal of the Architectural Institute of Korea, 12(7), pp. 335-348.
- Lee, S. H. (2000). "CM Issues on the Fundamental Laws of Construction Industry." Construction Engineering and Management, KICEM, 1(4), pp. 46-49.
- Lee, S. O., Park, J. H. and Jang, W. S. (2012). "Strategy Improvement of Construction Management in the Owner's View Point." Journal of The Korean Society of Civil Engineers, 32(5D), pp. 463-472. https://doi.org/10.12652/Ksce.2012.32.5D.463
- Lee, U. K., Yoo, W. S., Kim, D. I., Kim, T. H., Cha, M. S. and Cho, H. H. (2012). "Improvement of estimating method for construction management service fee by case study." Korean Journal of Construction Engineering and Management, KICEM, 13(4), pp. 16-24. https://doi.org/10.6106/KJCEM.2012.13.4.016
- Lee, Y. H., Chang, C. K., Choi, S. I., Kim, W. T. and Kim, Y. J. (2011). "CM/PM Major Issues and a Path Forward in Korean Construction Industry." CERIK Research Report, 2011-11.
- Ministry of Land, Infrastructure and Transport (MOLIT) (2004). Strategies for Construction Management to International Construction Market. MOLIT Research Report, Korea, 2004-12.
- Ministry of Land, Infrastructure and Transport (MOLIT) (2005). Research of a Systematic and Technical Development Plan and Development of a CM Evaluation Technique for the Activation of National CM Applocation and Analysis. MOLIT Research Report, Korea, 2005-12.
- Ministry of Land, Infrastructure and Transport (MOLIT) (2010). Strategies for Construction and CM Firms to East Asia Construction Market. MOLIT Research Report, Korea, 2010-12.
- Ministry of Land, Infrastructure and Transport (MOLIT) (2012). The Study on the Human Resource Forecasting System for Construction Industry. MOLIT Research Report, Korea, 2010-12.
- Na, K. T., Ryoo, B. Y. and Kang, B. H. (2001). "A Proposal to compile a Practice Guide by Construction Phases for CM Service Projects - Focused on the Case of Construction Manager as Owner's Agent." Journal of the Architectural Institute of Korea, 17(3), pp. 67-74.
- Oh, S. W. and Han, S. W. (2012). "CM Market Revitalization Strategies in Domestic Public Construction Projects based on Questionaries and Delphi Techniques." Korean Journal of Construction Engineering and Management, KICEM, 13(3), pp. 131-142. https://doi.org/10.6106/KJCEM.2012.13.3.131
- Park, C. S., Kim, J. C. and Choi, S. I. (1997). "An Effective Scheme of Construction Management Applications for supervising Firms in the Korean Construction Industry." Journal of the Architectural Institute of Korea, 13(4), pp. 441-450.
- Park, H. K., Shin, K. C., Park, H. P. and Jung, Y. (2008). "A Study of the Future Strategy and Mission for the Stakeholders in Industry, Academy, and Government for the Revitalization of CM." Korean Journal of Construction Engineering and Management, KICEM, 9(6), pp. 244-256.
- Park, Y. W. and Lim, N. G. (2011). "Effects of CM Contracts on the Management Technology in the Korean Construction Industry." Journal of the Korea Institute of Building Construction, 11(2), pp. 108-115. https://doi.org/10.5345/JKIC.2011.04.2.108
- Woo, S., Kim, D. H., Jung, Y., Lee, B. N. and Kang, S. H. (2001). "Construction Management Contracts in the Korean Construction Industry." CERIK Research Report, 2001-12.
- Yoo, B. K., Jung, C. Y. and Kim, J. J. (2006). "Diagnostic Analysis and Influential Factors of CM Fee Estimation." Korean Journal of Construction Engineering and Management, KICEM, 7(6), pp. 132-140.
- Yoo, S. K., Choi, S. I. and Son, C. B. (2009). "An Analysis of Capability of CM at Risk in Major Construction Company." Korean Journal of Construction Engineering and Management, KICEM, 10(5), pp. 85-94.