A Study on the CM Application to the Apartment Reconstruction Project - Focused on the CM Work Scope in the Reconstruction Project - (공동주택 재건축사업의 건설사업관리 적용방안에 관한 연구)

  • Kim Kwan-Whae;Yoo Moung Nam;Seo Jae-Woong;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.251-256
    • /
    • 2001
  • After the late 70's, the apartment housing have been constructed numerously, but the apartment housing has been deteriorated and the maintenance cost has been increasingly upward as time goes by. Because of that, the reconstruction of the apartment housing is widespread in the late 90's. But as the owner, the congregation, is not an expert, there are many problems in the reconstruction projects. Thus, the necessity of the CM in the reconstruction project is getting higher, but the appropriate method for the application of the CM is not established yet. In this study, the CM work scope that is applicable in the reconstruction project is developed through the inquiry and interview to the experts. Especially, The work scope developed in this study is established to be adapted easily in the practical use for each project phase.

  • PDF

A Study on Proposal to improve Domestic Construction Management Service Guide (국내 건설사업관리 업무지침의 개선(안)에 관한 연구)

  • Na, Kwang-Tae;Ryoo, Boong-Yeol;Kang, Byeung-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.3
    • /
    • pp.147-154
    • /
    • 2002
  • The Korean government makes an effort to raise the competitive power of nation through CM activation in the construction industry. Since the first CM service was applied to the atomic power plant project in 1986, the number of CM contracts are continuously being increased and will be up to 20% by 2002 in public sector. However, the public projects had been executed without any procedure manual or standard guideline of CM services. Meanwhile the Ministry of Construction and Transportation issued $\ulcorner$CM Service Guide$\lrcorner$, but the guide shows an indefinite description in the responsibility, authority and scope of activity for the project participants. Therefore, it is required the procedures be improved and scope of activities be established for the project participants. This study was generated from the comparative analysis of $\ulcorner$Standard CM Services and Practice$\lrcorner$ Published by CMAA and domestic $\ulcorner$CM Service Guide$\lrcorner$ and the case of Incheon International Airport construction. The purpose of this study is to provide the fundamental data for an improvement in the procedures of project execution and the construction manager's activities/rolls shown on $\ulcorner$CM Service Guide$\lrcorner$

Policies and Tasks for Improving Korean CM Industry (CM 산업 발전을 위한 정책 및 과제 추진 방안)

  • Kang, Seunghee;Jung, Youngsoo;Kim, Namjoon;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.71-81
    • /
    • 2014
  • As domestic construction investment has been gradually reduced, the issue of expanding overseas CM market has increased. Strengthening CM capability from the view point of project life-cycle is required in overseas CM market. However, current regulations institutionally force public CM services to focus on the construction phase. Therefore, Korean CM firms can hardly have the opportunities for accumulating technical competitiveness especially for pre-construction phase. Result of this study shows that the total efforts in terms of man-hours for the construction phase is found to be more than 78 percent in domestic public CM projects. In this context, this study proposes the policies and tasks for improving 'rigid man-hour placement', 'unreasonable CM fee standards', 'CM firm selection method', 'unreasonable business scope decision', and 'evaluation of owner's project management capability' in order to improve domestic CM Industry as well as to expand overseas CM market successfully.

Suggestions for Sustainable Construction Project Management (지속가능한 건설사업관리를 위한 발전방안)

  • Lee, Seung-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.240-241
    • /
    • 2021
  • For the sustainable development of the domestic construction project management field, each CM company should try to diversify in terms of service contract types and scope of work while having internationally competitive technical and service capabilities as follows. First, from the initiation of the service to the completion, the CMr should be able to establish and execute a plan to create specific outcomes. Second, CMr must have the capability to produce weekly or monthly cost, schedule, risk, and scope management reports. In addition, it should be possible to apply the cost plus sliding fee method or to systematically and continuously accumulate and process data generated during the construction process.

  • PDF

Direction of CM Services Defect Liability in the CM Contract

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.3
    • /
    • pp.209-217
    • /
    • 2013
  • The execution of a construction project involves the engagement of many participants. Generally, the Authority uses CM to certify that the Work is built according to the contract documents. The CM work scope is expressed in the Construction Technology Management Act and its Regulation. The mandated and delegated CM services are limited to the construction period. If Contractor is required to repair a construction defect, the Contractor should bear the burden of the inspection service for the defect repair, because it is associated with him. Nevertheless, CM should submit a bond to provide the inspection and supervision service for the defect repair. These may result in conflict with each liability. Therefore, CM service in the law and regulation was investigated and analyzed in this study to classify the characteristics of CM contracts, and it was suggested that the CM liability for the inspection and supervision service for the defect repair should be reconsidered.

The Case of CM Type Supervision Apartment House Construction Work - Focused on the Case of Baekseok-Cheonan 2BL Construction Work - (공동주택건설공사의 CM형 책임감리 사례 - 천안백석 2BL 아파트건설공사 사례를 중심으로 -)

  • Lee, Kab-Weon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.41-48
    • /
    • 2004
  • The objective of the CM model projects is to achieve gradually the development of Domestic Construction, Industry with function, effects, problems and improvement which are the results after assessing tills finished project on the basis of CM Plan. The result is very useful of being activated CM and giving good orders continuously. Therefore this study describes work scope, organization, performance and management process for Baekseok-Cheonan 2BL project and picks out practical problems about CM and then suggests CM technical development directions and institutional improvements.

  • PDF

Construction of Management System of Road Position Information Using GPS Surveying Data

  • Kim, Jin-Soo;Roh, Tae-Ho;Lee, Jong-Chool
    • Korean Journal of Geomatics
    • /
    • v.3 no.1
    • /
    • pp.15-22
    • /
    • 2003
  • This study aims to construct a management system of road position information as part of the build-up to a maintenance and management system of highways. First, information on the positions of the roads were obtained by a real-time kinematic satellite surveying, and then the degree of accuracy was analyzed in comparison with the data of the existing design drawings. The linear coordinates of road center line obtained by using RTK GPS showed about 7.6-13.2cm errors in X and Y directions in the case of the national road No.2 section, and about 8.4-9.2cm errors in the case of local road No.1045 section. These errors were within the tolerance scope regulated by the TS survey, and could be practically used. In the case of vertical alignment, there were about 6.2cm errors in the Z direction in local road No.1045 section. Aerial photographs are normally used in producing numerical maps, and it can be practically used because the tolerance scope of the elevation control point is l0cm when the scale of aerial photographs is 1/1000. The management system of road position information, utilizing Object-Oriented Programming(OOP), was built having the data acquired in this way as the attribute data. The system developed in this way can enable us to spot the positions of road facilities, the target of management with ease, to easily update the data in case of changes in the positions of roads and road facilities, and to manage the positions of roads and road facilities more effectively.

  • PDF

A study on the estimate of construction management cost for public construction project in the CM for fee contract (정부공사 건설 사업관리 용역의 대가 산정에 관한 연구)

  • Chung J.-Young;Yoon Tae-Kwon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.3 s.21
    • /
    • pp.115-122
    • /
    • 2006
  • This study is aimed to get clear model for CM fee level in public construction project. For the practical use and main target, CM for fee contract only is assessed and analysed. Cost estimate by percentage of total contract sum and method based on the historical construction data have significant deficiency. An regression model and probabilistic model are suggested with 9 independent variables. In the case of limited work scope, an element based floor area model is suggested and concluded with fish-bone scheme.

Evaluation on the Accuracy of the PPS in the Proton Therapy System, Which Uses the Self Made QA Phantom (자체 제작한 QA Phantom을 이용한 양성자 PPS (Patient Positioning System)의 정확성 평가)

  • Lee, Ji-Eun;Kim, Jae-Won;Kang, Dong-Yoon;Choi, Jae-Hyeok;Yeom, Du-Seok
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.24 no.2
    • /
    • pp.115-121
    • /
    • 2012
  • Purpose: The process of the proton treatment is done by comparing the DRR and DIPS anatomic structure to find the correction factor and use the PPS to use this factor in the treatment. For the accuracy of the patient set up, the PPS uses a 6 axis system to move. Therefore, there needs to be an evaluation for the accuracy between the PPS moving materialization and DIPS correction factor. In order to do this, we will use a self made PPS QA Phantom to measure the accuracy of the PPS. Materials and Methods: We set up a PPS QA Phantom at the center to which a lead marker is attached, which will act instead of the patient anatomic structure. We will use random values to create the 6 axis motions and move the PPS QA Phantom. Then we attain a DIPS image and compare with the DRR image in order to evaluate the accuracy of the correction factor. Results: The average correction factor, after moving the PPS QA Phantom's X, Y, Z axis coordinates together from 1~5 cm, 1 cm at a time, and coming back to the center, are 0.04 cm, 0.026 cm, 0.022 cm, $0.22^{\circ}$, $0.24^{\circ}$, $0^{\circ}$ on the PPS 6 axis. The average correction rate when moving the 6way movement coordinates all from 1 to 2 were 0.06 cm, 0.01 cm, 0.02 cm, $0.1^{\circ}$, $0.3^{\circ}$, $0^{\circ}$ when moved 1 and 0.02 cm, 0.04 cm, 0.01 cm, $0.3^{\circ}$, $0.5^{\circ}$, $0^{\circ}$ when moved 2. Conclusion: After evaluating the correction rates when they come back to the center, we could tell that the Lateral, Longitudinal, Vertical were all in the acceptable scope of 0.5 cm and Rotation, Pitch, Roll were all in the acceptable scope of $1^{\circ}$. Still, for a more accurate proton therapy treatment, we must try to further enhance the image of the DIPS matching system, and exercise regular QA on the equipment to reduce the current rate of mechanical errors.

  • PDF

A Study on the Status and Future Development of Construction Management of Jeonju World Cup Stadium (전주월드컵경기장의 건설사업관리 추진현황과 발전방향에 관한 연구)

  • In Chi-Sung;Jung Soon-Gil;Kim Tae-Sam;Kim Geun-Woo;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-80
    • /
    • 2001
  • Generally, construction management is classified into two categories in the construction industry; CM for fee and CM at risk, most project is executed by the construction supervision including construction management in CM for fee field in Korea. The division of work scope is complicated among construction manager(CMr) and difficult to implement the construction management efficiently by CMr. in this case. Therefore, it is desired to apply the specialized Project Management Information System(PMIS) systematically include construction management procedure. We propose the future development of construction management on construction site based on the analyzed problem with PMIS and guideline and CM concept on construction site, composition of CM procedure through this Jeonju World Cup Stadium CM project.