A Generating Cost Evaluation of APR+ Standard Design

APR+ 표준설계 발전원가 분석

  • Received : 2014.11.06
  • Accepted : 2014.12.15
  • Published : 2014.12.31

Abstract

KHNP CRI has been developing APR+ nuclear power plant since 2007, which is GEN III+ model with 1500 MWe capacity. To develop safer and more economical nuclear power plant than APR1400, we investigated advanced design features of ALWR(advanced light water reactor) being constructed in Korea and being developed/constructed in foreign countries. We applied the advanced design features and lessons learned from Fukushima accident to develop APR+ standard design suitable for both domestic construction and overseas construction business. Three economic assessments have performed during standard design phase of APR+. The result of the 3th(final) economic analysis for APR+ standard design showed that APR+ N-th plant was about 23% more economical than coal-fired 1,000MW power plant.

한수원 중앙연구원은 2007년부터 정부과제의 하나로 전기출력이 1500MWe급인 GEN.III+ 원전 APR+를 개발하고 있다. APR1400에 비해 보다 개선된 안전성과 경제성을 갖는 원전을 개발하기 위해 국내 건설 중인 원전과 해외에서 개발 또는 건설 중인 ALWR(Advanced Light Water Reactor)의 설계내용 및 후쿠시마 원전사고로부터 도출된 개선사항을 반영하여 한국 실정에도 맞고, 해외 수출형 원전에도 부합되는 원전을 설계하고 있다. APR+의 경쟁력을 확인하기 위해 APR+ 표준설계개발 단계에서 3회의 경제성 평가를 수행하였다. 표준설계개발 단계에의 3차(최종) 경제성 평가 결과 APR+ N-th호기는 국내석탄화력 1000MWe급 대비 약 23% 경쟁력 우위인 것으로 평가되었다.

Keywords

References

  1. EPRI, Technical Assessment Guide, Volume 1, Rev.7, 1993
  2. EPRI, Technical Assessment Guide, Volume 3, Rev.7, 1997
  3. EPRI, ALWR Cost Estimating Groudrules, 1995
  4. 한수원 중앙연구원, APR+ 2단계 표준상세설계 개발 세부3과제 경제성평가보고서(3차), Nov. 2012
  5. 지식경제부, 제 5차 전력수급기본계획(2010-2024), 2010
  6. 지식경제부, 피동안전설비 적용 기술개발, APR+1단계 세부 2과제, 2010
  7. 한국전력공사, 차세대원자로기술개발(II) 경제성 평가 최종보고서, Feb. 1999
  8. 지식경제부고시 제2011-197호, Oct. 2011