References
- H. Kim, S. Moon, J. Choi, S. Lee, D. Do and M. M. Gupta, 'Generator maintenance scheduling considering air pollution based on the fuzzy theory', in Porch. IEEE International Fuzzy System Con., Vol. 3, pp. 1759-1765, 1999 https://doi.org/10.1109/FUZZY.1999.790173
- M. Shahidehpour & M. Marwali, 'Maintenance Scheduling in Restructured Power Systems', Kluwer Academic Publishers, 2000
- Yaoyu Wang & Edmund Handschin, 'Unit Maintenance Scheduling in Open System Using Genetic Algorithm', Transmission and Distribution Conference, IEEE, Vol 1 , pp.334-339, 1999 https://doi.org/10.1109/TDC.1999.755374
- D. Chattopadhyay, 'A practical maintenance scheduling program : mathematical model and case study', Trans. IEEE, Vol 13, pp. 1475-1480, 1998 https://doi.org/10.1109/59.736293
- Z. A. Yamayee, 'Maintenance Scheduling : Description, Literature Survey, and Interface with Overall Operations Scheduling', Trans. IEEE, Vol. 8, 1982 https://doi.org/10.1109/TPAS.1982.317516
- Jung-Won Jung & Jung-Ik Kim, 'Maintenance Scheduling using a Genetic Algorithm with New Crossover Operators', Trans. KIEE, Vol. 48, pp. 545-552, 1999
- E. L. da Silva, M. Th. Schilling & M. C. Rafael 'Generation Maintenance Scheduling Considering Transmission Constraints', Trans. IEEE, Vol 15, pp838-843, 2000 https://doi.org/10.1109/59.867182
- 한석만 외, '경제적 전력시장에서 계통운용자의 발전기 예방정비계획에 관한 연구', 대한전기학회논문지, Vol. 53A 8월호, pp. 477-483, 2004
- 한석만 외, '경쟁적 전력시장에서 발전기 예방정비계획 알고리즘에 관한 연구', 대한전기학회 하계학술대회, Vol. A, pp. 643-645, 2003